Post Job Free

Resume

Sign in

Electrical Power Plant

Location:
Quezon, Philippines
Posted:
August 03, 2019

Contact this candidate

Resume:

Romulo G. Maligalig

Brgy. Lamot * Calauan, Laguna

Email Add.:ac9y1o@r.postjobfree.com

Contact No.: +63-966-***-****

POSITION DESIRED: ELECTRICAL TECHNICIAN

PERSONAL INFORMATION

Date of Birth : February 17, 1969

Place of Birth : Calauan, Laguna

Gender : Male

Civil Status : Single

Height : 5’3”

Weight : 137 lbs.

Citizenship : Filipino

Religion : Roman Catholic

Father’s Name : Jose C. Maligalig

Mother’s Name : Lydia C. Guevarra

Address : Brgy. Lamot 2, Calauan, Laguna

Language Spoken : English and Tagalog

Emergency Contact Person : Rodolfo G. Maligalig

Contact No. : +639**-***-****

EDUCATIONAL BACKGROUND

Tertiary : MFI Foundation, Incorporated

Advanced Industrial Motor Control

August 17, 2013 – October 5, 2013

Calamba Technical Institute

Electrical Technology

March 1988

Secondary : Liceo de Calauan

March 1986

Primary : Calauan Central School

March 1982

WORKING EXPERIENCE

•Electrical Technician SABIC IBN ZHAR

Jubail Saudi Arabia

December 2016 – February 2018

Duties and Responsibilities

•Received scheduled preventive and corrective maintenance job order form the supervisor of electrical equipment like electric motor rated voltage 380V 4.16 KV.

•Motor Control center brand Merlin Gerin, ABB, Schneider, Transformer Voltage rated 13.8 KV/4.16 KV.

•Perform greasing of motor as per electrical (SMP) Standard Maintenance Procedure, Test insulation resistance of motors, Tag-in Tag-out, Rack-in Rack-out of MCC and Switchgears 380V, 4.16 KV., disconnect and reconnect of power supply of motors.

•Opening and closing of work permit like cold, electrical and hot permit. Troubleshooting of MCC by analyzing the cause of failure to start of the motors and reset of MCC and VSD panel model altivar 71 plus/Schneider.

•Electrical Technician ACGC CO.

Al-Khobar, Saudi Arabia

November 28, 2013 – October 2016

Job Description

Make daily maintenance route of Electrical Machine on the facilities such as service filth panel Cathodic Panel, Converter, HVAC Motor Control Center (MCC) like Wyne Delta Control with PLC Control module, Install and commissioning of motor, replace Damage contactors, Timer Circuit Breaker, Jet Fuel Electric Control Panel overhaul Electric Motors for maintenance and repair wiring of motor control panel for sewage pumps and HVAC Units.

•Electrical Technician Kumyang Electric Co.

Abu Dhabi (Ruwais)

July 13, 2012 – July 29, 2013

Job Description

Measure Insulation Resistance and winding resistance of motor, Motor Control unit and power cables, for ground fault by used of test instrument such as MeggerMit 510/2 5KV-10KV / Insulation Resistance Tester, MeggerMit 230 Insulation / Continuity Tester, Fluke 87V ohm Tester and fluke 374 AC/DC Clamp meter to check phase current.

Glanding of armored cable size 4c x 25mm2, 7c x 2.5 mm2, 3c x 70mm2. Wiring and termination of control panel board in substation where location are Switch Gear Room, Satellite Instrument Shelter room (SIS) etc. Rectification of telecom wiring installation for grounded, shorted shield. Functional test of MCC mm 300 motor manager and motors installed on the oil and gas processing plant, operate Air Circuit Breaker. Received complete Lock-out / Tag-out and electrical safety procedures from the supervisor. Interpret Schematic Diagram.

•Electrical Technician System Factory for Electrical Panel

Saudi Arabia (Riyadh)

January 19, 2010 – February 25, 2012

Job Description

Install electrical apparatus like control relays, mcb, magnetic, space heater, terminal blocks in panel board the brands of electrical apparatus are Morsmith, Omron, Telemecanique, ABB, Schneider, Alen – Bradley, GE Electric, Siemens. Wiring and Termination of Control Panel, Distribution Board, Relay Panel, Switchgears, Low Voltage Panel, High Voltage Panel use in power Plant Substation. Do some wiring modification, test wires and cables for insulation Resistance by use of MeggerMit 510/2. Use Torqing tools for tightening bolts and nuts.

•Electrician UTS Kentz Co. LTD

Abu Dhabi UAE (Habshan)

February 9, 2008 – January 28, 2009

Job Description

IR Test of cable armored wire by used of MeggerMit 510/2 5KV-10KV/ insulation resistance test, for ground fault, check phase current by use of clamp meter model fluke 374 C/DC. Fabrication and installation of cable tray sixe 50,100,150mm. make wiring termination of electrical power and control panel board.

•Electrical Technician AL-RADDADI READY MIX CO.

Saudi Arabia (Madina)

November 21, 2005 – December 7, 2007

Job Description

Troubleshoot motor control ckt, such as DOL (direct on line), forward-reverse, jog control, wye-delta starter for open ckt. Change new contractors and overload, blown fuse and circuit breaker. Check grounded motors by use of multi tester model no. YX-360 TR. Change worn bearing of motor and install a new motor. Repair and installed automotive starter, solenoid relay, control relays, alternator and battery installation, wiring and troubleshoot automotive lighting crkt. Overhaul generator for cleaning and revarnish of windings.

Electrical Technician TOYO- INK COMPOUND CORP.

PHILIPPINES

November 25, 2001- August 30, 2005

JOB DESCRIPTION

Wiring and installation of motor control ckt. Like contactors, push buttons switch (start/stop) forward- reverse, wye- delta starter. Use phase sequences device to test correct phase, AC/DC clamp meter for reading phase current. Test insulation resistance of motors by use of megger. Make preventive maintenance of extruder machines, power tools in the plant by greasing of rotating parts, such as gear box, bearing tightening all electrical connection, cleaning motors, disassemble motor for repairs of bearings and replaced new one. Change battery and maintaining of good operation of generator. Received firefighting procedure and electrical safety from senior technician.

•Electrician Denki Technical Services, Inc

Philippines

July 11, 1996 – July 15, 2000

Job Description

Wiring and installation of lighting fixtures, power outlets, circuit breakers, motor control unit. Assembling and erection of electrical conduit, lay-out junction boxes based on electrical lay-out drawing. Bend Metal conduit size 1/2”, ”,1’1 ” in 90 degree bend and offset bend by use of hickey or pipe bender. Cable laying, cable termination by use of hydraulic crimper, wiring of three-way switch and fou-way switches. Wiring of single phase and three phase panels. Install seal off fittings like ESD, EYD for hazardous area like gasoline pump station.

I hereby certify that the above information is true and correct to the best of my knowledge and belief.

Romulo G. Maligalig

Applicant’s Signature



Contact this candidate