Post Job Free
Sign in

Manager Engineer

Location:
Evans, GA
Posted:
July 30, 2019

Contact this candidate

Resume:

RICHARD JOHN KILLIEN

***** ** ******* ***

Port St. Lucie, FL. 34987

706-***-**** cell

***************@*****.***

EXPERIENCE & SKILL SUMMARY

Experience in Supervision and Management of major construction projects including Extended Power Uprate, Steam Generator Replacement Projects and Reactor Vessel Head Replacement, Liquid Natural Gas Refinery, DOE Nuclear Facilities/TVA, FEMA Disaster Relief Project. I have expertise and skills as a Carpenter, Project/Personnel Manager, Quality Assurance Manager, Task Manager, Subcontract Management Specialist, Materials Specialist, Quality Assurance Engineer, Quality Control Engineer/Supervisor, Training Coordinator/Course Developer/Trainer, and Facilities.

EDUCATION/CERTIFICATIONS

●Journeyman Carpenter thru Apprentice Program.

●Bachelor of Science in Education; Bemidji State University, Bemidji, MN.

●QA Certificate, Quality Assurance Management.; Aiken Technical College, Aiken, SC

●Graduate School, Education & Administration; University of California, Irvine, CA

●Graduate School, Education & Administration; Pepperdine University, Los Angeles, CA

●Project Management Professional, Project Management Institute Training/not certified

●ASME Code Class BPV, Section III, Rules for Construction of Nuclear Facilities 2014

●QC Material Receiving, Supplier Quality Certifications and Lead Auditor for SNC-Lavalin

●Total Quality Management Certification on line training 5/2014

●Implementing ISO9001/2015 Certification on line training 12/2017

●Certificate of Completion 10 and 30 Hour OSHA Hazard Recognition Training on 1 and 2/2019

●Certificate of Completion EM 385-1-1 USACE Safety & Health Training on 3/2019

●Certificate of Completion Basic First Aid and Adult/Child/Infant CPR on 2/2019

●Construction Quality Management for Contractors Certification sponsored by the USA Army Corp of Engineers April/2019

PROFESSIONAL EXPERIENCE

Alphastaffing/M & R Technology

Matt Radford Administration & Foreman

Bartow, FL. 33830 10/18 to 12/18

Prattville, AL. James Hardie Site

Responsible for the jobsite personnel, safety, pre job brief, confined space program, housekeeping and general day to day operations.

Purpose to fabricate 7 steel process tanks on site and place. Approximate staff of 18 performed, layout & fitting, welding & grinding, final plumb/level/dimensional. Fabricate bottom hopper and pipe flanges, man ways and attach/weld to tank.

Final grinding and clean up and coal tar inside and industrial coat the exteriors.

Evergent Group/Zempleo for Duke Power Robbie Armstrong Construction Specialist/Turnover

Crystal River, FL. 3/2018 to 10/2018

Largest US Combined Cycle Gas Power Project. Interface with Contractors and Subcontractors regarding earthwork, mechanical systems/piping, welding, electrical, and instrumentation systems. Ensure adherence to specifications, codes, drawings and owner requirements as well as oversight of the contractors QC Program. Perform walkdowns for validation of work completion and initiate/validate punch lists, ensure safe work practices (rigging practices, fall protection, confined space, etc.) as well as performance against schedule.

Black Diamond Services Project Quality Task Manager. Greg Smith

V.C. Summer Nuclear Station SCE&G, Jenkinsville, SC. 6/14 to 6/17

Develop and maintain an effective project quality program that supports the specific tasks,

Objectives, and goals of the Reactor Vessel Closure Head Replacement Project with Integrated Head Assembly, Reactor Building Cooling Project, the RF 22 Fuel Outage Head Inspection/Repair, and Old Head and Old Steam Generator Disposal. Develop staffing, project quality plan, surveillance oversight plan, Project Plans and coordinate all audits, supplier quality oversight, installation surveillances, and other activities including HAB NQA-1 requirements, nonconformance processing, corrective actions and project documentation. Review procurement specifications from client engineering and subcontractors, perform oversight of material receipt inspection, material control in storage, and material verification at supplier shops.

SNC-Lavalin Nuclear Inc. Project Quality Assurance Manager

Richard Stephens

Vi Linc Solutions Prairie Island Plant Northern States Power Red Wing, MN. 5/13 to 6/14

Quality Assurance Manager providing assurance to the client and contractor for the implementation of the two piece steam generator replacement ensuring compliance to the Construction, Engineering, Procurement and Quality Program requirements during the SGR outage. 10CFR50, Appendix B, NQA-1, ISO9001 and owner QA Program implementation per audit, oversight surveillances, material receipt/issue and storage control, supplier oversight, work package & procedure review and implementation, and quality records control. Act as Procurement point of contact at jobsite, QC Qualification as Material Receipt to assist with inspection on back shift, Supplier Quality Certification in Mechanical and Electrical disciplines. Work Package and calibration record review for SGR work packages.

Bechtel Power Corporation

Project Quality Assurance Manager

Joe Cowhill

Extended Power Uprate Project, St. Lucie Nuclear Plant, St. Lucie, Florida. 12/08 to 12/12

Provided quality assurance and management expertise in the development, coordination

and site implementation of 10CFR50 Appendix B, NQA-1, ISO9001 Criteria and Bechtel Power Corporations Nuclear Quality Assurance Program for Florida Power & Light. Performed numerous vendor oversight surveillances of suppliers and contractors, coordinate Corrective Action Programs, oversight of engineering group, oversight of Quality Control and Construction (work Package implementation), procurement POs, expediting, material receiving, storage control, and material release. Perform procurement oversight at the supplier shops for Steam Generators, Feedwater Heaters, Moisture Separators, pumps, and valves prior to shipment to jobsite. Performed audits for Bechtel during this 4 year contract at Pt. Beach. St. Lucie and Turkey Point facilities.

Southern California Edison

Project Management Specialist

Dan Todd. Steam Generator Replacement / ISFSI Project; Southern California Edison; California 12/07 to 12/08. Provided project management, organizational planning, oversight and implementation expertise to 10CFR50 Appendix B, NQA-1 Criteria and Bechtel Power Corporations Nuclear Quality Assurance Program at the San Onofre Nuclear Generating Station. Developed material receipt checklists for the two steam generators upon arrival at jobsite per codes and specifications. Performed QA Oversight during the N-1 outage for SCE.

Bechtel Power Corporation

Project Quality Assurance Manager

Steam Generator Replacement Project; Arizona Power Service; Palo Verde, Arizona 6/07 to 11/07. Project Quality Assurance Manager responsible for the implementation of the Bechtel Construction, Engineering and Quality Program requirements during their NSSS outage. Develop oversight program to assure compliance to engineering and procurement code requirements, specifications and compliance to NQA-1 material control requirements. Performed audit prior to SGR implementation. Provide expertise for development, coordination and implementation of the Project QA/QC and Corrective Action Program. Work Package and final document review of SGR records.

Bechtel Power Corporation

Project Quality Assurance Manager

Comanche Peak Steam Electric Station, Texas Utilities Glen Rose, Texas 2/07 to 6/07

Quality Assurance Manager providing assurance to the client for the implementation of the Bechtel Construction, Engineering and Quality Program requirements during their NSSS SGR outage. Establish the material oversight program to Bechtel and client requirements (NQA-1, specifications, codes, standards, engineering and procurement requirements and Construction QC requirements). Perform procurement oversight at the supplier shops for Steam Generators, Feedwater Heaters, Moisture Separators, pumps, and valves prior to shipment to jobsite. Assisted the new reactor licensing team with quality requirements and doc reviews. Work Package and final document review of SGR records.

Bechtel Power Corporation

Project Quality Assurance Manager

Ft. Calhoun Nuclear Plant, Omaha Power, Blair, Nebraska 8/2006 to 1/2007 Quality Assurance Manager on the backshift providing assurance to the OPPD client, Ft. Calhoun, of the implementation of the Bechtel Construction, Engineering and Quality Program requirements for Engineering, construction and Procurement during their NSSS outage (Steam Generators/Head Replacement/Transformer/etc.) Work Package and final document review of SGR records.

Bechtel-FEMA

Subcontract Management Specialist

Bechtel FEMA Disaster Relief Team; First Responder; Pass Christian, MS. 8/05 to 8/06

Main point of contact for disaster housing relief, responsible for the development, implementation and maintenance of the FEMA Housing Program after Hurricane Katrina. Developed trailer park installations including water, sewer, electrical systems and trailer set-ups; also responsible for all field procurement issuing POs and Field Material Requisitions, material storage and release requirements. Assure all maintenance contracts for all subcontractors meet the requirements of the project documents. Supervised subcontractor Technical Representatives and Inspectors. Assisted project management with Public Relations coordination involving issues with the housing relief program implemented by Bechtel/FEMA.

Bechtel Savannah River, Inc.

Principal QA Engineer A / MGT

Savannah River Project, Aiken, SC. 1/1989 to 5/2005

Responsible for planning, developing and administering Technical and Quality Engineering Programs for Operations. Skills and experience in developing effective quality solutions to problems. Quality Engineer A for B and F/H Area, Analytical Labs. Assist F Canyon, FB Line, H Canyon and HB Line (Nuclear Material Processing) with Quality Program compliance requirements, engineering and procurement and Operations work processes.

Bechtel Savannah River, Inc.

Principal QA Engineer A / MGT

Savannah River Project, Aiken, SC. 1/1989 to 5/2005

Shift Quality Assurance Supervisor responsible for the oversight and management of Quality Functions supporting the Operations, Maintenance, Waste Processing and Safety Departments in the Nuclear Processing Facilities. Some planning/oversight for decommissioning of the DOE nuclear facilities (Naval Fuels/F Canyon & B Line).

Bechtel Savannah River, Inc.

Senior QC Engineer

Savannah River Project, Aiken, SC. 1/1989 to 5/2005

Work Planner Lead - Supervising craft and engineering personnel in the development of electrical, mechanical, instrumentation, welding, and B31.3 piping work package

Instruction, including Design Change Notices, DCFs, etc., for field installations. Issue Field Material Requisitions per requirements of work Packages and other specified requirements/documents.

Bechtel Savannah River, Inc Trainer

Savannah River Project, Aiken, SC. 1/1989 5/2005

Continuous Improvement trainer utilizing (Juran & Demming Quality Concepts) for the evaluation of processes and programs, teaching team building and techniques to encourage and facilitate the continuous improvement model of thinking/behavior from Craft through Management.

Bechtel Savannah River, Inc.

Senior Quality Control Engineer

Savannah River Project, Aiken, SC. 1/1989 to 5/2005

Supervisor of Non-Conformance and Corrective Action Request programs providing cradle to grave administration, evaluation, resolutions, trending and site distribution ensuring quality expectations were met. During Operations and Maintenance oversight, assure correct material to be installed per procedure and work package, matches engineering and procurement requirements, as well as codes and standards.

Document all oversight operations on surveillance form and checklist, if used. Perform required audits and self-assessments per schedule.

Bechtel Power Corporation/TVA Brown Ferry Nuclear Senior QC Engineer

6/86 to 12/88 Develop material receipt and storage procedures, set up material receipt and storage/laydown area, set up material withdrawal program, disposal of unsat item process, and develop program for Preventive Maintenance. Provide training and technology transfer to TVA Employees in procurement/materials arena.

Perform verification walk downs in plant of as-built cable and conduit runs from mod package configuration and sketch ISO results for Electrical Engineers.

Supervisor on night shift for mod package closure group. Take final modification packages and verify field conditions by system walkdown for match to mod package documentation before final turnover to client.

REFERENCES

Jim Andrews 352-***-**** Component Engineer

Rick Garrison 772-***-**** Project Manager

Anthony Smith 864-***-**** Project Manager

Greg Smith 803-***-**** Project Manager

Richard Stephens 425-***-**** VP of Project Execution

MISCELLANEOUS

Run 5K & 10K Races for Charity

Work with Nonprofit ‘One Love Services.org’ to help less fortunate

Habitat for Humanity

Collect Classic Cars

Gardening

Golf



Contact this candidate