SUJIT KUMAR DEY (Large Infrastructural & Building Surveyor)
Present Address:- Mumbai
Permanent address: Village & PO –Kaikala,District-Hooghly,Pin Code-712405,WB. India. Email: *********@*****.***
Whatsapp No +918*********
Mobile No- +918*********
Profile
Thorough understanding with hands on exposure of various survey methods, executed several projects for clients including Rail, Road,, Building, Infra,Tunnel,PowerPlant,Refinery,etc.
In conjunction with quality control & safety measures, handled efficiently the office work and Site Surveying work through effective Sketches, Reports and Documentation with the help of Auto Cad,MS Office,various survey programmes and latest Surveying Machines in an way of latest Industrial trends/practices.
Experience
Over 15 years of rich experience in executing engineering survey operations for construction of Large Building Infrastructural Project,PowerPlant,Refinery, Railway, Highways, Tunnel & Topographical Survey Project.
BAHRAIN
Employer:-Crown Electromechanical Services WLL
1) EAST HIDD HOUSING DEVELOPMENT, PHASE-I
Large infrastructure work for 572 Villas including Road work and Landscaping.
Designation:-Seneior Land Surveyor Responsibilities:-
Calculates FRL and others data as needs for all service construction as per the approved shop drawing.
Prepare Asbuilt Survey Data,Report.
Processes survey Data to utilize in different type of Total Station.
Responsible for all type of documentation such as equipments calibration for the client, internal & external audit
Involved in planning for the daily & monthly survey work & resources.
K.S.A
Employer:-Nesma & Partners Contracting Co LLC, Jubail
(1) SADARA PROJECT at JUBAIL
The company was engaged in executing power plant, drainage,linkroad,ductbank,sewerage,Substation Building and other sub structure for an oil refinery construction project.
Designation: - Sr.Land Surveyor
Responsibilities:-
All over geometric control to the project specially for power plant
Geometry control for the sub structure & super structure e.g.substation building no 101,102,103,104,105
Documentation for the client i.e.making survey reports.
Involved in planning for the daily & monthly survey work & resource
Successfully completed on time without any problems.
QATAR
Employer:- National Property Development (Al Ijarah Group)
(1) LUSAIL DEVELOPMENT PROJECT (NRV+WWF) AT DOHA,QATAR
Construction of building infrastructure & villa Project
Designation: - Land Surveyor
Responsibilities:
Recording of IR from contractor.
Geometry control as per the IR of contractor,s surveyor and made required comments.
As-built data control and site inspection.
Responsible for documentation such as equipments calibration for the client, internal & external audit
Involved in planning for the daily & monthly survey work & resource.
Successfully completed the daily inspection task on time without any problems.
U.A.E.
Employer:-Aldar Laying O,RourkeLlc, Abu Dhabi
(1)AL RAHA BEACH DEVELOPMENT PROJECT at Abu Dhabi,UAE.
G+12 Building Projects with associated infrastructure.
Designation: - Senior Land Surveyor
Zone of Work: Al Zeina.
Responsibilities:
Involved in fixing control points, monthly traversing & T.B.M checking
Studied drawing and calculated require data
Setting out &leveling job done for G+12 BUILDING, NOS 8.
Responsible for night shift leading of surveyors.
Prepared as built drawings by using Auto Cad LT 2007,leica total station & software.
Liaised with consultant.
Successfully completed on time without any problems.
Employer:-Al FuttaimCarrillion LLC
(2)NAPTHA HYDROTREATER REFORMER (Dubai,UAE)
Type of Work: Extension of Oil Refinery i.e. filtration units,piperacs,substationbuilding,etc..
Designation: - Surveyor
Responsibilities:
Involved in traversing and calculating require data
Centre line marking of Pipe Racs,duct banks,,lincroad,SubstationBuildings,etc.
Maintained the earthwork as per designed geometry at site.
Liaised with consultant,prepared as-built data.
Successfully completed on time without any problems.
(3)GREEN COMMUNITY WEST. (Jebel Ali,Dubai,UAE)
THE Project was in execution of laege building infrastructure project i.e. underground utilities such as Sewer line,stormwater,telecom,gas,potablewater,electricity,etc.
Designation: - Surveyor
Responsibilities:
Involved in traversing and calculating require data with total station and GPS.
Centre line marking of UNDERGROUND UTILITIES
Maintained the earthwork as per designed geometry at site.with Auto Level & Total Station.
Liaised with consultant,prepared as-built data.
Successfully completed on time without any problems.
INDIA
Employer:- Simplex Concrete Piles India Limited
(1) VAL ALUMINA REFINERY PROJECT (Langigarh,Orissa,India)
The Project was for laegeAluminium Refinery & infrastructure project .
Designation: - Surveyor
Responsibilities:
Involved in traversing and calculating require data with total station & Theodolites.
Centre line marking of Siloes, Substations,PanFilter,Boxite handling plant,etc.
Maintained the earthwork as per designed geometry at site.with Auto Level & Total Station.
Liaised with consultant,prepared as-built data,handled auto cad 2000.
Successfully completed on time without any problems.
PERSONAL DETAILS
DATE OF BIRTH:-1st October 1979 AGE:- 39 RELIGION:-Hindu
LANGUAGE KNOWN:-English,Hindi,Bengali. ACADEMIC QUALIFICATION:- 10+2
TECHNICAL QUALIFICATION:-I.T.I-SURVEYOR (1998- 2000)
T Engg (Membership: Eqv. to Diploma in civil engineering-ICE) 2011-2013
BAHRAIN CAR DRIVING LICENSE(VALIED UPTO Oct_2022)
Current &PreferedLocation: ANY
Current Co.: N/A
Yrs of Exp in last Co.: 18 MONTHS
Last Profile: Sr. Land Surveyor
Total Yrs of Exp: 15years +8 MONTHS
Marital Status: Married
Profiles Preferred: Sr. Land Surveyor/Land Surveyor.
Expected CTC: Negotiable
Tentative Notice Period: Immediate.
EMPLOYERS
1.Crown Electromechanical Services WLL( Bahrain-From March 2017 to Oct-18) Reason of leaving:-Manpower Redundancy Policy of Employer as work scope reduced.
2.Nesma& Partners-KSA(2013-2015)
Reason of leaving:-Complicated medical treatment. 3.National Property Developement, Doha.(2010.- 2012)
Reason of leaving:-Family Problem.
4. ALDAR LAING O ROURKE LLC, ABU DHABI(2008-2009).
eason of leaving:-Global recession affected.
Survey Equipment Operate:-
GPS : Trimble,leica GS 18 and hand GPS GARMIN
Total Stations: Trimble 5500, Leica-TC-307, TC-405, TCR-1201, TCRA-1201, TC805L, TC905L 1203, TC- 1800, Leica Viva, Topcon (211D, 701,225), SOKKIA-1003, 1103, Set 500, Set1030R.
Auto Level :Leica (NA2/NAK2), SOKKIA (B20 with micrometer, C220).Carl zice, Wild, Pentax etc. Digital Level : Trimble
Others:- Roughby (Slab Concreting), Optical Plumb, Compass, Plane Table,Piper,etc.
: I.T. Skill:
Auto Cad-2016, Auto Cad Civil 3D 2016 & MS office. Prepared asbuilt drawing from field data,
Produced required data from drawing to utilize in Total Station. Calculated quantity of Materials from topographic survey data . Prepared contour map in Civil 3d.
Prepared cross section in civil 3d.
Day to day use of Auto cad and record keeping in excel along with overall data management with various other survey programmes.
I hereby declaring that all the information furnished above are true and to the best of my knowledge.
Regards….
(SUJIT KUMAR DEY) DATE: 02/06/2019
Dubai,UAE