Post Job Free
Sign in

Engineer Mechanical

Location:
Rawdat Al Khail, Qatar
Posted:
July 28, 2019

Contact this candidate

Resume:

Page * of *

Radha Krishnan. S. Pillai

P.O BOX-**250, Doha, QATAR

Contact +974-********

ac9w18@r.postjobfree.com

Current Job

CQCC -DOHA QATAR.

Position: - Sr.QA/QC Engineer.T&C

Tenure:-From JULY 2014 till date

Major Projects: - Qatar steel 220kv-66kv substation Maiseed. Qatar M/F class room bldg. at Qatar University.

2B+M+34 office bldg.

B+M+5 res. Bldg. at Lusail. City Doha- Qatar

Job responsibilities:

MEP-Test and commissioning activities coordination, prepare-record Test data sheets, O&m Manuals, Hand over documentations, Warranty letters, spare parts, maintenance coordination, Correspondences, attending meetings,

FAT, SAT, and functional tests of MEP –HVAC/pumping equipment.

Prepare ITP-Check lists, Test data sheets, Inspection requests, Third party NDT tests,

Review/submission of -Schematic/Design/IFC drawings, Method statements, material submissions /Equipment selections, Schedule etc.

Liaising with M.E.P Sub contractor/ consultant/ client/Third party inspection representatives for Design- co-ordination /construction- Quality/progress evaluations,

Review/approvals of installations, quality standards- Coordinate installation Onsite Inspections, (RFIT) with consultant /QC departments.

Issue NCR-Nonconformance reports, Punch list/snag list preparations- follow up, technical evaluations for installed equipment actual performance data/noise-vibration/electrical characteristics. Dec 2009 to July 2014

Contrack Cyprus ltd. P.O BOX-22042 DOHA QATAR,

Position: - Sr.Hvac/Qc mech Engineer.

Tenure:-From Dec 2009 till date

Project: - Qatar Foundation Sidra Medical and Research Centre “(SMRC)” Education city Doha- Qatar

Project Highlights: - Design- Built

Central district cooling plants, Multi storey Hospital &Clinic, Infrastructures, Duties:

Review /submission of design IFC drgs, mep coordination, submittals& various system calculations for the conformity with project’s specifications/QCS.

Career of Interest

Pr.Mgr.

Sr.Engineer/manager,

Mep coordinator,

Design/Cons. Engr

Sr. QA/QC engineer,

inspection engineer,

Career summary

Over 21+years GCC

Design/estimation/coordinati

on/Construction project

management/testing

commssioning/ Experience

in MEP/HVAC, District

cooling chiller plants,

Airport, High rise res/comm.

buildings, Hospital,

Villas/townships

Education

Mech. Engg.diploma 89

Certificate in Auto cad-

Revit3D, MS Office

Application,

+2(Math/physics stream)

NATIONALITY

Indian

LANGUAGES

English, Hindi/Urdu,

Malayalam

Page 2 of 4

Review/submission of -Schematic/Design/IFC drawings, Method statements, material submissions /Equipment selections, Schedule etc.

Liaising with M.E.P Sub contractor/ consultant/ client/Third party inspection representatives for Design- co-ordination /construction- Quality/progress evaluations,

Review/approvals of installations, quality standards- Coordinate installation Onsite Inspections, (RFIT) with consultant /QC departments.

Review/prepare/submissions ITP/ NDT test reports, Prepare Non Conformance Reports, record, Lead &schedule activities with project construction-planning departments to achieve set mile stones.

District cooling plant, centrifugal chiller cooling tower, primary-tertiary pumping network, LPG, steam, fire protection piping installations,

Supply return/extract duct works, including

laminar/HEPA/FAV/VAV/MD etc, BMS SCADA, control interfaces, Chemical injection, sand filtration systems,

Chilled water, condenser water, low temp hot water, potable and fire protections system flushing/chemical treatments, disinfection process .

Pre-commissioning /Commissioning, T&C Test pack preparations, submission, client training& maintenance activities Hand over.

Reports to Projects manager/Sen. Const. Manager/Mech. Design Manager

Dec 2008 to Dec 2009

Worked as Mechanical QA-QC ENGINEER/Co-coordinator With District cooling EPC Company

M/s ADC Energy systems LLC. for their Centrifugal chiller plants ranging 60-80,000T Dubai / Abu Dhabi. UAE

Responsible for QA/QC (material/installation) inspections, preparation of RFI/Method statements, Design/prepare/review of Design/shop drawings, documentation submittals & site mep co- ordinations with various contractors/client/Third party representatives, attending progress- co-ordination meetings, monitoring delivery schedule, witness& conduct NDT, radiography, ultra sound, Die penetration tests(DPT) for weld joints, prepare ITP/IR, Non Conformance Reports, As Built redline drawings, snag/punch lists, preparing test reports, and monitoring third-party commissioning

Reports to QA /QC manager/Construction manager.

coordinate with subcontractors for implementing quality policy

Test pack documentation O&M submission, records. Oct 2005 to Nov 2008

With Consultant and Project Management

M/s DAR AL-HANDASAH

Dubai International Air Port Expansion PH II- C 2 Terminal-3 Mechanical engineer/Inspector

Page 3 of 4

MECHANICAL/HVAC installations of terminal/concourse-3 Inspections progress/quality monitoring and follow up of MEP sub contractor’s works; ensure co-ordination between services.

Review/comment/approval of schematic/IFC shop/DD Submittals material/equipment selections for mechanical- HVAC, fire and plumbing-drainage systems., method statements, ITP’S

Safety reviews follow up and adherence to project specifications.

Assessments for site clarification requests, contract variation/change requests Material inspections, technical coordination.

Preparing snag lists, Supervision of testing and commissioning, project O&M manuals, client training parts, acc. submittals. Jan 2002 to Oct 2005

M/s Samara Engg. est., Abu Dhabi, UAE

Building services engineer.

Various projects consisting of Hotel & residential/office Towers and Commercial Business Centers.

HVAC HAP/E20 system Calculations, design/proposals tendering, Quantity take offs, draughting, review, Technical evaluation/comparisons of materials and equipment for value engg. Conformance with the specification.

Onsite Supervision of mechanical installation (HVAC, Plumbing, Fire Protection, plant room equipment connection details, MEP coordination Shop and As- built drawings.

Assessments of contract variations and change requests.

Leading and manage construction team for the installation of equipment, piping, ducting & all relevant accessories like control systems, with coordination among different subcontractors and different disciplines.

Supervision of testing and commissioning team for air and water balancing authority inspection, BAS controls.

Preparing project method statements, compliance statements and O&M manuals.

Leading maintenance team for annual maint. Contracts. Feb 2001 to Jan 2002

M/s Bureau Veritas Quality InternationalAbudhabi, UAE. Mechanical engineer/Inspector (Third party QA/QC Division) Project 3000 Centralized flats and infrastructure for ADNOC Ruwais Housing society at Ruwais, Consult:- DMJM INTL, Abu Dhabi.

Third party Inspections of ADNOC project mechanical works inclusive of HVAC, Plumbing, and Fire Protection, pumping stations, inspections coordination and Control.

Preparing schematic layouts and reviews of shop drawings for MEP Central Chilled water secondary pumping networks pre-insulated U/G piping, treated Fresh air/heat recovery systems & plumbing (drainage, Domestic water, solar heaters etc.

Page 4 of 4

Design review including pressure drop calculations for duct/pipe work, Pump Head calculations Plant and AHU selection details.

Review of Material selection and technical submittals for client’s approval comparison report preparation against project specification and international codes and standards.

Nov96 to Feb 2001

M/s Built Middle East..

A/C Site Engineer

Major projects

B+g+3 at satwa, Consult:- WSP, Dubai

28 Villas at satwa Consult/client :-SPP/Arenco, Dubai. 2B+g+7 at Al-Kiffaf, Dubai consult:-Arif and Bintoak

Quantity take off- sending enquiries Pricing, Design& Draughting Duct/piping, Review and procurement of material/equipment by conforming suitability.

Ensuring quality mechanical installation, piping Duct supports-fire barriers and coordinating with testing and commissioning by equipment manufacturer, Installation of Underground pre-insulated piping/cladding works for chilled water Operation/maintenance of Chillers, pumps Packaged /DX-units, fans, etc.

Dec 93 to Oct 96

M/s Galadhari Electromechanical co.LLC Dubai.

Mechanical Site Engineer

36 class PWD Schools at Rashidiya, Khawaneej & Sharjah.

Supervision of Installations, duct work, chilled water piping, HVAC/dx- equipment, fire protection system, & plumbing system.

Erection of all equipment and its commissioning. Computer knowledge:

Proficient in M.S WORD & EXCEL, Primavera

AUTOCAD –Revit3D,

COMPUTER HARD WARE MAINTENANCE.

Mobility

Holds valid UAE&Qatar Driving License.

References

Testimonials available on demand



Contact this candidate