RESUME
Name : Santosh S. Mankar
Contact Number : Primary +91-882*******
Alternate +91-988*******
Email Address : **************@**********.***
Date Of Birth : 02-Oct-1968
Present Address : Flat No. 702, B Building, MSX Alpha Homes, Sector Alpha-1, Greater Noida - 201306
Uttar Pradesh (India)
Permanent Address : Flat No. A-09, Shree Moraya Gosavi Raj Park, Phase-III, Keshavnagar, Chinchwad – 411033
Pune, Maharashtra (India)
Qualifications : 1. B.E. (Mechanical Engineering) from Govt. College of Engg., Karad 2. Qualified PMP from IPMA
3. Advance Diploma in Piping Design & Engg. from MIT, Pune
Work Experience : 1. Total 27 Years of hard core experience in Project Management, including Construction & Commissioning.
2. Successfully executed 35 Projects (29 Domestic & 6 Overseas) 3. Executed EPC / Turnkey Projects of Water Treatment Plants, Power Plant, Boilers and Sugar Plants.
4. Executed 4 Water Treatment Plants in Petrochemical and Oil & Gas Sector.
Software Used : MS Project, Primavera and MS Office ERPs Operated : SAP and BaaN
Job Responsibilities : 1. Support to sales and marketing in bidding process. 2. Project Execution, managing Cost, Time, Quality and HSE. 3. Scope Management, Change Management and Claim Settlements. 4. Assessing and Managing Risk and Opportunities.
5. Satisfying Customer by fulfilling all Contractual Obligations. 6. Planning, Monitoring and Controlling Cost, Time and Quality. 7. Communication & Coordination with Customer, Consultant, Contractors, Vendors and Team Members.
8. Progress Review and Reporting Achievements, Plan Vs Actuals, Projections, bottlenecks, Path Forwards and Recovery Plan. 9. Managing Engineering, Procurement, Delivery, Construction and Commissioning to fulfill the contractual obligations. 10. Liaison with Client and Local Authorities.
11. Billing, Receivable and Cash Flow Management.
12. Technical and Commercial Closure of the Contract.
2 of 3
Special Achievements:
1. Implementation of Assessment of Risk and opportunities, planning mitigations and progress reporting process in SMD Projects, while working with ISGEC Heavy Engineering Limited.
2. Managed profitability in wrongly estimated Project (Amal 1B, Oman) by presenting case in front of Customer (Worley Parsons / PDO) while working with Aquatech Systems Asia Pvt Ltd.
3. Got repeat order from Oil & Gas Client Worley Parsons / PDO, Oman, by gaining confidence with the successful execution of one high spec project. 4. Successfully handled changes and settled claims with overseas Clients in Oman, Kuwait and Egypt.
5. Got repeat order from two clients M/s Shalivahana Group at M/s Singhal Enterprises, while working with Thermax Limited.
6. Managed progress reporting of 5 Boiler Project with one excel sheet (A3 Size Paper) while working with Thermax Limited. The formatting was appreciated by Customer as well as Company.
7. Appeared and Qualified PMP exam in first attempt while working with Thermax Limited. 8. As Contractor left site in between, to manage the budgets, I have successfully handled construction & commissioning of One 10 TPH Travagrate Boiler with the help of local fitter and helpers at Madhukar SSK, Faizpur, while working with M/s Lipi Boilers Ltd. 9. While working with M/s Lipi Boilers Limited, as I was actively participating in Commissioning and Trouble Shooting of Projects, many times Customer called me directly for spare orders.
10. Handled multiple products and variety of Clients successfully with the help of good Project Management Practices.
Detailed Work Experience:
A. M/s ISGEC Heavy Engineering Limited, Noida – General Manager – Projects Working From 09-Mar-2017
Projects Executed:
1. Commissioned and handed over 3500 TCD Sugar Plant with 22MW Cogeneration Power Plant – At Bhima Shankar SSK, Karnataka State. (INR 1,290,000,000) 2. Under execution, 6000 TCD Sugar and refining Plant with 22MW Cogeneration Power Plant – At PT MSM, Indonesia (USD 31,000,000)
3. Under execution, 6000 TCD Sugar and refining Plant with 22MW Cogeneration Power Plant – At PT PNS, Indonesia (USD 31,000,000)
B. M/s Aquatech Systems Asia Pvt. Ltd., Pune – Sr. Project Manager Worked from 03/08/2009 to 08-Mar-2017
Projects Executed:
1. Waste Water Recovery Plant (HERO) - At Tyco Sanmar, Egypt. (USD 4,500,000) 2. Waste Water Recovery Plant (UF-RO) – At Tyco Sanmar Egypt (USD 3,500,000) 3. Waste Water Recovery Plant (UF-RO) & Storm Water Recovery Plant (ACF) - At Equate Petrochemicals, Kuwait. Project Value: 4,000,000 USD 4. Water Treatment Plant (SAC-SAC-WAC) – For Amal Steam Surface Facilities, Phase 1B, PDO, Oman (USD 8,500,000)
5. Waste Water Treatment Plant (HERO) – At Shenhua Xinjiang, China (USD 9,000,000) 6. Water Treatment Plant – For Amal Steam Surface Facilities, Phase 1C, PDO, Oman
(USD 18,500,000)
3 of 3
C. M/s Alstom Projects India Limited, Noida – Sr. Project Manager Worked from 07/05/2008 to 31/07/2009
Projects Executed:
1. Job executed is 1 x 36 MW Power Plant with 1 x 300 TPH CFBC Boiler at Bokaro Power Supply Company Limited (INR 2.000,000,000)
D. M/s Thermax Limited – Associate Manager Projects Worked from 15th November 2004 to 05th May 2008
Projects Executed:
1. 1 x 120 TPH TG Boiler – M/s GMR Industries Ltd, Haliyal. 2. 2 x 80 TPH AFBC Boiler – M/s Ambuja Cement Ltd, Bhatapara (CG). 3. 1 x 50 TPH AFBC Boiler – M/s Dev Priya Papers, Meerut. 4. 1 x 45 TPH AFBC Boiler – M/s Shalivahana Projects Ltd., Hyderabad. 5. 1 x 45 TPH AFBC – M/s Rake Power Ltd, Ramtek, Nagpur. 6. 4 x 10.5 TPH WHRB on 100 TPD Kiln – At M/s Singhal Enterprises, Raigarh 7. 1 x 50 TPH AFBC Boiler – At M/s Singhal Enterprises, Raigarh 8. 1 x 38 TPH WHRB on 350 TPD Kiln – At M/s Viraj Steel, Jharsuguda E. M/s Deccan Mechanical & Chemical Industries Ltd., Pune – Project Coordinator Worked from April, 2004 to October, 2004
F. LIPI BOILERS LTD. Pune – Project Engineer
Worked from July 1994 to April 2004
Projects Executed:
1. 10 TPH TG Bagasse cum Bio gas fired Boiler at Madhukar SSK Ltd., Faizpur(MS). 2. 10 TPH TG Rice husk cum Bagasse fired Boiler at K.M.Sugars Ltd. Faizabad (UP). 3. 35 TPH TG Bagasse fired Boiler at Naraingarh Sugar Factory Ltd.,(Haryana). 4. 35 TPH TG Bagasse fired Boiler at Varalakshmi Sugars Ltd., Shrikakulam (AP) 5. 40 TPH TG Bagasse fired Boiler at NCS Gayatri Sugars Ltd., Kamareddy (AP). 6. 40 TPH Dumping Grate Bagasse fired Boiler, Kisan Sahakari Chini Mills, Nanauta (UP). 7. 40 TPH Dumping Grate Bagasse fired Boiler at Bhima SSK Ltd., Solapur (MS). 8. 44 TPH TG Bagasse fired Boiler at Shree Renuka Sugars Ltd., Belgaum (KS). 9. Revamping of 65 TPH Boiler at Harinagar Sugar Mills Ltd., (Bihar). 10. 35 TPH Dumping Grate Bagasse fired Boiler @ Davangere Sugar Mills Ltd., (KS). 11. 90 TPH TG Bagasse fired Boiler at Jawahar SSSK Ltd., Hupari (MS). 12. 80 TPH TG Bagasse fired Boiler at Naranja SSK Ltd., Bidar (Karnataka). 13. 35 TPH Dumping Grate Bagasse fired Boiler at Priyadarshini SSK Ltd., Latur (MS). 14. 45 TPH TG Bagasse fired Boiler at Uttam Sugars Ltd., Roorkee (UA). 15. 50 TPH TG Bagasse fired Boiler at Shree Renuka Sugars Ltd., Belgaum (KS). G. SITSON INDIA Limited, Dombivali, Thane – Junior Engineer Projects Worked for 2 1 2 Years from Dec 1991 to June 1994
Projects Executed:
1. Manjra SSK Ltd., Latur, M.S. - 10 TPH Dumping Grate Boiler. 2. Yashwant SSK Ltd. Theur, Pune - 10 TPH TG Boiler. 3. Manganga SSK. Ltd. Atpadi, M.S. - 10 TPH Dumping Grate Boiler. 4. Dnyaneshwar SSK. Ltd., Akluj, Solapur - 10 TPH Dumping Grate Boiler. 5. Batala Co-op. Sugars, Batala (Panjab) - 20 TPH Dumping Grate Boiler.