CURRICULUM VITAE
Post Applied For: Senior Surveyor.
PERSONAL INFORMATION:
Name: Muhammad Aamir
Date of Birth: February 1, 1986.
Religion: Islam
Nationality: Pakistani
Passport No: BR1220743
Marital status: Married.
Postal: Address: Muhammad Aamir P/O kamar Mushani Tehsil Essa khel District Mianwali,Punjab.pakistan
E:mail:Address: ************@*****.***
********.*******@******.***
Cell :
Saudi Arabia :+966*********
Pakistan :+923*********
WhatsApp :+923*********
Skype : amksyr
Academic Resume:
HSSC (under BISE Sargodha). Diploma of Technical Education in Surveying. Certificate in computer Education MS Word, Excel, AutoCAD
EMPOLYMENT HISTORY: 12 YEARS EXPERIENCE:
Have 12+ YEARS EXPERIENCE in the field of Civil Engineering Like Construction of Multistory Building, design survey, pipe lines infrastructure, Highways, Bridges & Piling work as “Sr. Land Surveyor, Site Engineer“.
Vast experience of Total Stations Leica Ts 12,Sokkia Dx- 103,Topcon & GPS & AutoCAD, AutoCAD Civil 3D
Page 2 of 3
Page 2 of 3
Company: Azmeel Contracting Company in Kingdom of Saudi Arabia Position: Senior Surveyor
Project: Temporary Construction Facilities
for Saudi Aramco TCF-3 Haradh K.S.A
Responsibilities: Prepare daily survey activities based on construction work and RFI follows up such as Survey Reports, As built, Topographic Prepare Data on AutoCAD and AutoCAD Civil 3D to Complete Layout by Co-ordinate for Setting out of Roads, Grading & Leveling For Aramco Office, Camp Area, and Helipad Area. Responsible for all kind of survey work such as setting out of sewer line, Fire Water Line, Potable Water Line, Irrigation Line, power Cables, Grounding Cables Fire Alarm. fixing of horizontal and vertical controls. Topographic Survey from March 2018 to till Date.
Company: Azmeel Contracting Company in Kingdom of Saudi Arabia Position: Senior Surveyor
Project: Royal Commission for Jubail & Yanbu
Jubail University Collage K.S.A.
Responsibilities: Prepare daily survey activities based on construction work and RFI follows up.
Making Data on AutoCAD and AutoCAD Civil 3D. Complete Layout by Co-ordinate for Setting out of Columns, Grid beams, Shear walls and Core walls. Responsible for all kind of survey work such as setting out of center line, fixing of horizontal and vertical controls. Topographic Survey from June 2014 to till Date.
Company: Muhammad Ramzan & Company (MRC) Pakistan. Position: Sr. Surveyor.
Project: Provincial Highway Project. Pakistan
Responsibilities:
Rehabilitation and Extension of 42 KM SCTM road Including 5 KM New Alignment. Setting out of Centre line, Grade & Profile Layout of Bridges and Culverts Setting Out & fixing of Sensor line for lying of surface courses like sub base wearing course and Asphalt. Responsible for Traversing, Geometric Alignment, Super elevation, Circular and Spiral Curves .Sep, 2014 to 30 June, 2015. Page 3 of 3
Page 3 of 3
Company: Tahir Builder (Pvt) Ltd. Pakistan.
Position: Sr. Surveyor.
Project: Pakistan Airbase Shehbaz (Building)
Responsibilities: Responsible for Layouts of Buildings Columns, Grid beams, Structural and Architectural works. From Jan 2014 to Sep 2014 Company: Waseem Traders Engineering & Road Works Pakistan. Project: Construction of 50 MW FWEL Wind Power Plant. Position: Senior Land Surveyor.
Responsibilities
Checking of Centerline, grade and profile layout and all kinds of Survey Works, Vertical, horizontal Alignment of infrastructure, Crane Pads from Oct 2012 to July 2013.
Company: DESCON engineering (Pvt) Ltd. United Arab Emirates. Projects: IGD Habshan-5 Gas Plant, (UAE).
Position: Land Surveyor.
Responsibilities: Setting out of Mechanical Structure layouts, Plumpness, Anchor Bolts Orientation Leveling of Shim plates. Construction of Evaporation pond to hold treated water for Sewage treatment plant, Responsible for layouts of underground facilities, e.g. Electrical cables tunnels, Duct Banks, manholes and Mechanical pipes branches from June 2009 to May 2012.
Company: SKB Engineering Construction Pakistan.
Projects: Bahria Town Lahore Pakistan.
Position: Assistant Surveyor.
Responsibilities: Setting out of Lightening pole Foundations Responsible for Infrastructural work. 10 July, 2006 to 17 March, 2009. Reference would be furnished upon request.