LFMAHUSAY

CV-**/**/****

Nationality Filipino

Profession Civil Engineering

Specialization Quantity Surveying, Claims, Estimation & Project Management

Present Address Doha, Qatar

Visa Status Residency Visa - under husband sponsor OBJECTIVE

To join a professional organization dedicated to high standard client service, share professional skills, and gain additional professional advancement for mutual benefit with the company and myself. KEY QUALIFICATIONS

Over 20 year experience in Engineering-Architecture-Construction, works within consultancy and construction industry, working on pre-contract and post contract of various projects such as high rise buildings like condominiums, office buildings, condotel, hotels, school buildings, gymnasium, sports complex, coliseum, commercial centers, public markets, slaughter house, horse pavilion, horse racing track, warehouse, industrial plant, power plant, Caltex gas station, network station, satellite towers, airport

(runways and administration building & etc.) roads, highways, bridge, viaduct, skywalk, fly over/overpass, port (jetty, administration buildings, etc.) metro/railways, utilities, reclamation, resort, subdivision development, residential, clinics/hospitals, chapel/church, mosque, full precast building system, pre- fabrication steel structure and feasibility studies of rural and urban planning. Project scheduling, budgeting, controlling, monitoring and supervision are plus factor skills including specifications writing for building, procurement, tendering, contracts and office administration. Software skills

– MS Office (Excel, Word, Outlook, PowerPoint)

– AutoCAD 2018, Revit and Navisworks

– BIM measure v16

– CATO Cost Planning v16

– STAAD Pro 2006

– Project Wise Explorer

– Project Information Management System (PIMS)

– SharePoint

– Lync and Skype for Business

Licenses

Dept. of Trade and Industry (Republic of the Philippines) - Registered Real Estate Saleswoman May 2009 to December 2011

Affiliations

University of the Visayas Alumni Association, Member Notable Achievements

Dean's Lister, 1994

LORY FUENTES MAHUSAY

Contact No. +974-******** & 55784760

Email: *************@*****.***

LFMAHUSAY

CV-15/05/2019

EDUCATIONAL ATTAINMENT

Master of Science in Management Engineering (MSME) Academic Requirements (completed)

Pass the Comprehensive Exam administered on March 04, 2008 with average of 82.5% UNIVERSITY OF THE VISAYAS

Cebu City-Philippines 6000

Bachelor of Science in Civil Engineering (BSCE)

Year Taken: 1990-1995 (March 1995-Graduated)

UNIVERSITY OF THE VISAYAS

Cebu City-Philippines 6000

SEMINARS & TRAININGS

Project Management Professional

(PMP)

Chicago Training & Consultancy

P.O. Box 20178, Doha, Qatar

Batch date: Sept. to Nov. 2013

Management Information System

Seminar

Cebu Business Hotel

Colon Street, Cebu City, Phils.

October 06, 2001 (5.0 hrs.)

BIMmeasure v16

Causeway Technologies Ltd.

Atkins Bldg, Doha, Qatar

June 19, 2013 (6.0 hrs.)

Evaluation of Site w/ respect to Soil

Condition

Cebu Trade Hall - SM City

North Reclamation, Cebu City, Phils.

June 06,1994 (5.0 hrs.)

CATO Cost Planning v16

Causeway Technologies Ltd.

Atkins Bldg, Doha, Qatar

June 18, 2013 (6.0 hrs.)

Project Scheduling/PERT CPM

Cebu Trade Hall - SM City

North Reclamation, Cebu City, Phils.

June 05,1994 (5.0 hrs.)

Construction Project Management

Launching

MICA Qatar & JCMS Inc.

Holiday Villa Hotel, Muntazah

Doha, Qatar

May 23, 2012 (2.0 hrs.)

Preparation of Cost Estimate using

Computers

Cebu Trade Hall - SM City

North Reclamation, Cebu City, Phils.

June 04,1994 (2.0 hrs.)

Advanced Cost Estimating Methods

CostOs3.8

Nomitech Software Launching

Holiday Villa Hotel, Muntazah

Doha, Qatar

December 14, 2010 (3.0 hrs.)

Preparation of Feasibility Study

Cebu Trade Hall - SM City

North Reclamation, Cebu City, Phils.

June 04,1994 (5.0 hrs.)

Summer Assembly of the Phils. Asso.

for Graduate Education (PAGE) -

Region VII

University of Southern Philippines-

Foundation

Salinas Drive, Lahug, Cebu City, Phils.

May 09, 2009 (8.0 hrs.)

Improvement of Soft & Subsiding

Ground & Seismic Design in the

Phils.

University of the Visayas-Audio Visual

Colon St. corner Jakosalem St.

Cebu City, Phils.

February 11, 1994 (5.0 hrs.)

STAAD Pro 2006 Training Course

Informatics Computer Institute

SM North Reclamation Area

Cebu City, Phils.

October 12-14, 2007 (3.0 days)

ATS Design Techtools ’93, an Info-Demo

Seminar on ATS CAD/CAE

University of the Visayas-Audio Visual

Colon St. corner Jakosalem St. C.C.,Phils.

August 16, 1993 (5.0 hrs.)

LFMAHUSAY

CV-15/05/2019

PROFESSIONAL EXPERIENCES

2018 – 2019

Northcroft Middle East – Doha, Qatar

Quantity Surveyor

Responsibilities included:

– Coordinate with the contractor’s design and commercial team relevant to the project contract requirements.

– Review contractor’s progress payment applications for any possible payment issues.

– Inspect site to collate information for monthly statement which includes but not limited to recommendation on interim payments, statement of claims from contractor’s anticipated claims and assessment of cost of works and expected final cost.

– Review & evaluate contractor’s claims and variations.

– Quantity survey and prepare take off spreadsheets from 2D/3D drawings based on software used, i.e. CADD / Revit, as to the project contract requirements, final design and constructed for substantiation of variations.

– Perform cost analysis and draw up reports on changes to works and contractor’s claims.

– Maintain recordings of chronological site instruction(s) and variation order(s) for final accounts reconciliation.

– Assist team in claims preparation for submission to the client. Project assisted:

Qatar Integrated Railway Project - Doha Metro Gold Line Underground - Doha, Qatar (Fit-out Works)

Design & Build of Light Industrial Logistic Units @ Qatar Economic Zone, State of Qatar

- Ras Bofuntas Plots

- Um Alhoul Plots

2017 – 2018

PETROSERV LIMITED – Doha, Qatar

Quantity Surveyor (Commercial Dept.)

Responsibilities included:

– In-charge of commercial quantity surveying including valuing construction progress accomplishment.

– Re-measurement of quantity changes and additional works.

– Checking rates and quotations.

– Monitoring and reporting of progress works.

– Site checking of works completed.

– Checking and certification of Subcontractor’s progress claims.

– VO checking and certification of Subcontractor’s VO’s.

– Liaise project team in preparation and compilation of attachments for the submission of interim payment application to the client.

– Liaising with Client on Payment Certification.

– Assist in commercial and non-commercial related issues.

– Assist and monitor site instruction for any revisions, additional works, and liaise with the Project Team/Engineer/Client for qualification of possible variation(s).

– Quantification, costing and compilation of documents for justification of quotation and seek approval for further processing of variation.

– Review / analyze cost inputs to ensure time, money and labor of a project needs within the right level of accuracy.

Projects undertaken: links

Construction of WOQOD BITUMEN TERMINAL EXPANSION – MIC, Qatar Project Cost: Original Contract is 65 Million Qatar Riyal 2012 – 2017

FAITHFUL + GOULD (WS Atkins Group of Companies) – Doha, Qatar Quantity Surveyor

LFMAHUSAY

CV-15/05/2019

Responsibilities included:

– Manage all cost for pre-contract & post contract project assignment related to building and landscaping, road and infrastructure (underground and interchange highways including drainage & sewerage, pumping station, utilities, street lighting & electrical substation, QP Fiber Optic Installation, CCTV, etc.), ports & harbor, mixed used development underground car park, railway underground & station, from the initial calculations to the final accounts.

– Assist in commercial and non-commercial related issues.

– Liaise Engineer/Architect/Client in any possible variations and raise site instruction.

– Checking of contractors’ rates and quotations.

– Re-measurement of quantity changes and additional works in the revise approved plans/shop drawings.

– Evaluate Contractor’s cost submissions for additional works and variations.

– Prepare compilation for variations and seek approval of variation order.

– Maintain recordings of chronological site instruction(s) and variation order(s) for final accounts reconciliation.

– Monitoring materials delivered onsite and ensure that the installed items are included in monthly interim progress certificate.

– Validate construction progress accomplishment and assist invoicing the interim payment application.

– Checking and assist in certification of contractors progress claims.

– Monitoring and reporting of progress works

– Site checking of contractor’s works completed.

– Scrutinize and negotiate any quantities/claims dispute that may arise.

– Review assign site instruction/variations final accounts and assist in close-out. Projects undertaken: Links

Post Contract

Qatar Primary Routes Dukhan Highway Central Package P004 Contract C2010/116, Qatar Project Cost: more or less 2.7 Billion Qatari Riyals (including variations and additional works) Pre-Contract

Roads and Infrastructure in Doha Industrial Area - Contract 2 Package, Qatar Infrastructure & Highway for Qetaifan Island, Commercial Boulevard, & Waterfront Commercial District; CP07B2 Lusail Plaza (Underground Car Park), Qatar Lusail Development Transit System; Underground Station PEA01, Qatar New Doha Port Projects, Qatar

KAAR Metro – King Abdullah Mosque Station, Saudi KSA 2011 – 2012

DEEMAHSTONE QATAR WLL – Doha, Qatar

Estimator / Administrator

Responsibilities included:

– Review the tender documentation and completion of tender schedules.

– Liaise with the Consulting Engineers, Building Certifier and Clients as required to coordinate tender inputs to ensure full scope coverage.

– Interpret Technical Specifications, Drawings and maintaining awareness of the different construction contracts, standard method of measurements in use and understanding the implications of health and safety regulations.

– Verify any technical report and always ask copies for any possible considerations.

– Quantity survey the received BOQ ensuring that the required fit-out materials corresponds the quantities required as per the plan and specifications.

– Seek and coordinate with the Client for any increase or decrease in quantities or any possible exclusions.

– Prepare quantity take-off as required for pricing.

– Make cost estimates and submit quotation.

– Follow-up quotations.

Additional work as Administrator:

– Coordinate and oversee all office activities.

LFMAHUSAY

CV-15/05/2019

– Ensure adherence to relevant company procedures and policies.

– Make travel arrangements for the manager and new hired workers.

– Handle phone calls and all related correspondence.

– Provide assistance with different budgeting and bookkeeping activities.

– Keep databases in check and update them regularly.

– Control the office supplies and make sure it is in accordance with office needs.

– Supervise cleaning crew and cleanliness of office space.

– Create and present reports for the manager.

– Coordinate and participate in office space planning, maintenance and renovations when necessary.

Projects undertaken: Links

Tendered/awarded

NDIA Consolidated Rental Car Facility, Qatar

Phase 1C Heart of Doha, Qatar

Ramada Hotel, Dubai, UAE

2011 – 2011

DOMOPAN QATAR WLL – Doha, Qatar

Quantity Surveyor

Responsibilities included:

– Review proposal specifications, drawings and attend pre-bid meeting to determine scope of work and required contents of estimate.

– Review and incorporate historical data from purchase orders, subcontracts, and productivity analysis reports into unit and man-hours figures.

– Provide complete conceptual or bid work and final estimating input.

– Provide technical support to personnel preparing discipline estimates for assigned bids.

– Track awarded contracts as required which may include estimating/pricing extra work items, change orders; procuring materials, preparing subcontracts, etc.

– Adept in handling Estimation & pre contract related activities involving cost planning & budgeting for Bids.

– Evaluation of tenders and BOQ, Review contract, commercial terms and asses’ risks, Prepare and submit accurate cost estimation and competitive techno-commercial offers.

– Correspondence with client, consultant and contractor in getting the tender and project Estimation of budget cost of project considering the drawings and soil conditions of construction site.

– Liaison with consultant and attending progress meetings, Study tenders from start to finalize with client/consultant including follow up with suppliers, subcontractors quotations & finalizing with them & propose engineering value for some activities to assure quality of work & to select alternative materials without effecting of quality & assure that the material used must be durable

& within the specification.

– Follow material from stage of enquiry, submittals, negotiation for price, delivery, payment issues.

– Setup kickoff, status calls, meetings and ensured bid management progression.

– Create the bid plan, coordinate deliverables from internal and external contributors, set up calls and organized bid reviews, ensure systems and databases are maintained. Projects undertaken: links

Construction of Al Khor Housing Compound Zone 13, 14 & 15 - Al Khor, Doha, Qatar Project Cost: 130 Million Qatar Riyal

2010 – 2010

UNITED PRECAST CONCRETE COMPANY WLL - MIC Doha, Qatar Estimator (Estimation & Sales Dept.)

Responsibilities included:

– Registering sales inquiries.

– Handling sales correspondence.

– Clarifying client's requirements for project specifications and etc.

– Defining project and product requirements clearly.

– Tendering the project in co-coordination with sales manager. LFMAHUSAY

CV-15/05/2019

– Prepare initial startup meeting.

– Distributing order information sheet and preliminary specification from sales to other departments.

– Creating jobs in CIPS and CIHS Software.

– Preparing documents for handling over checklist to projects department.

– Providing estimation-quotations to the sales engineers/sales executive for preparation of proposal and other related project concerns.

– Preparing estimates/tender and construction work preliminary schedule for projects such as full precast building system, cladding panels, boundary walls, beams, columns, HCS (hollow core slabs).

– Attending co-ordination meeting with clients/consultant. Projects undertaken:

AL JAZEERA NETWORK HEADQUARTERS - Full Precast Building System, Precast Boundary Wall and Precast Concrete Bollard & Barriers

2009 – 2009

NATURE WORKS LANDSCAPING INC. - Phils.

Project Manager

Responsibilities included:

– Attending co-ordination meeting with clients/consultant.

– Supervise and coordinate all the activities of the project and see to it that each task is performed to the fullest efficiency.

– Plan organizational structure to bring out ease and flow in the task.

– Develop project plan and direct resources for the purpose of production.

– Monitor and manage the project schedule, budget, risk and deal with the operational issues.

– Suggest new policies and modifications in order to reform the nature of work.

– Participate in meetings, discussions, project site visits, workshops and hearings.

– Prepare project status reports and presenting it to the higher managing authority for scrutinizing.

– Be able to lead a team and bring out the best in them.

– Responsible for establishing easy communication between the employees and the higher authority.

Projects undertaken: Links

Tendered/awarded

Seascape Resort Town (Filinvest signature Crimson Resort & Spa Mactan) - Phils. Contract Package: Softscape & Hardscape Landscaping 2008 – 2009

BEC CONSTRUCTION EQUIPTMENT INC. - Phils.

Project Engineer / Project Manager

Responsibilities included:

– Supervise and coordinate all the activities of the project and see to it that each task is performed to the fullest efficiency.

– Plan organizational structure to bring out ease and flow in the task.

– Develop project plan and direct resources for the purpose of production.

– Monitor and manage the project schedule, budget, risk and deal with the operational issues.

– Suggest new policies and modifications in order to reform the nature of work.

– Participate in meetings, discussions, project site visits, workshops and hearings.

– Prepare bids and proposals for the prospective clients to expand business operations.

– Provide full information to the accounts departments and auditors and assist them when in difficulty.

– Prepare project status reports and presenting it to the higher managing authority for scrutinizing.

– Be able to lead a team and bring out the best in them.

– Responsible for establishing easy communication between the employees and the higher authority.

LFMAHUSAY

CV-15/05/2019

Other functions

– Prepare Cost Estimates for internal bidding for interested subcontractors.

– Evaluates qualified subcontractors for a certain intended project based on each submitted company profile where evaluation highlighted the actual experiences and expertise of any interested subcontractor.

– Prepare construction sub-contract(s) for subcontractor(s)/contract(s) administration.

– Evaluates subcontractor’s billing per actual percentage of progress accomplishment.

– Close coordination with the subcontractor on any changes of the project, on site detailing & interpretation of plans, and implementation of the actual materials needed.

– Manage project budgets and procurement.

– Variation management and cost control.

– Manage the Project Financial Reports including forecasting requirements, progressing payment claims and invoicing.

– Review and vetting of sub-contractor agreements ensuring compliance with the Scope of Works and Contract Terms and Conditions.

– Over-all project supervision including project communication, billings, claims, and responsible for the completion of the project.

Projects undertaken: Links

Construction of Roro Ramp (Jetty), Naga Power Plant Complex, Cebu, Phils. 68 m Grouted Riprap Works, Naga Power Plant Complex, Cebu, Phils. Seashore Line Protection Works, Naga Power Plant Complex, Cebu, Phils. Doosan Heavy Industries & Construction Co. Ltd. Temporary Facilities Naga Power Plant Complex, Cebu, Phils.

- Site Warehouse

- Site Office Extension

- Site Canteen

- Water System with Overhead Water Tank

- Perimeter Fence with Main Gate, Guard House and Concrete Pavement @ main gate area

Construction of Shiloh International Corp. Temporary Office Facility, Naga Power Plant Complex, Cebu, Phils.

2007 – 2007

NORTHCON CONSTRUCTION & MANAGEMENT CORP. - Phils.

Project Engineer

Responsibilities included:

– Attending co-ordination meeting with clients/consultant.

– Assist in preparation and authentication of design plans for building permit application and construction purposes.

– Interpret design plans.

– Specs writing for building permit application and construction purposes.

– Verify any technical report and always ask copies for any possible considerations.

– Sourcing of materials, light & heavy equipment rentals, and manpower rates for realistic price data base.

– Establish the cost of installation, materials and workmanships and to come out with a well- planned quotation.

– Liaise with approved suppliers/alternative suppliers for price quotation and availability of materials.

– Prepare Bill of Quantities for building permit application and construction material purchase.

– Procurement and processing of building permit including managing fees at Office of the Building Official.

– Liaise with barangay official(s)/subdivision admin office for any requisition & use of access.

– Assist project supervision including managing subcontractor and suppliers. Projects undertaken:

Construction of Two Storey Residential House, Phils. LFMAHUSAY

CV-15/05/2019

2005 – 2006

BW HUDSON ENGINEERS AND ASSOCIATES, Texas - USA

Quantity Surveyor / Specs. Engineer

Responsibilities included:

– Verify any technical report and always ask copies for any possible considerations.

– Technical writing of Design and Build Construction Specifications.

– Prepare quantity take-off and provide timely and accurate estimates with clear delineation of project scope between material source and site works.

– Establish the cost of installation, materials and workmanships as per the design and specifications.

– Contact approved suppliers for availability of material supply and make complete vendors list.

– Preparation of tender and contract documents, including bills of quantities. Projects undertaken: Links

Design Package including project specification, tender and contract documentation and bills of quantities

Construction of Equine Pavilion, Hopkins County, Texas, U.S.A. Construction of Springhill Suites Marriott, Galveston, Texas, U.S.A. 2003 – 2005

RM STRUCTURE & SKETCH - Cebu City, Philippines

Quantity Surveyor / Estimator

Responsibilities included:

– Interpret Technical Specifications, Drawings and maintaining awareness of the different construction contracts, standard method of measurements in use and understanding the implications of health and safety regulations.

– Verify any technical report and always ask copies for any possible considerations.

– Technical writing of Design and Build Construction Specifications including submission for building permit purposes.

– Establish the cost of installation, materials and workmanships as per the design and specifications.

– Prepare quantity take-off and provide timely and accurate estimates with clear delineation of project scope between material source and site works.

– Contact approved suppliers for availability of material supply and make complete vendors list.

– Preparation of tender and contract documents, including bills of quantities.

– Assist in preparation and authentication of design plans for building permit application and construction purposes.

Projects undertaken:

Drafting Package including project specification, tender and contract documentation, bills of quantities, building permit procurement and completion certificate Construction of Gardose Residence, Phils.

Construction of Ontanillas Residential House, Phils. Construction of Ladaga Residential Apartment, Phils. Construction of Caltex Petrol Station, Phils.

Construction of Municipal Hall - Don Carlos Bukidnon, Phils. 2001 – 2002

ROWIE'S CONSTRUCTION - Cebu City Branch, Philippines Project Engineer

Responsibilities included:

– Penetrate Government Offices for possible project bidding and submit prequalification.

– Participate in tender meetings, discussions and project site visits.

– Procurement and representation in pre-bidding.

– Interpret bid plans, specifications and bid forms.

– Verify any technical report and always ask copies for any possible considerations.

– Sourcing of materials, light & heavy equipment rentals, and manpower rates for realistic price data base.

LFMAHUSAY

CV-15/05/2019

– Establish the cost of installation, materials and workmanships and to come out with a well- planned quotation.

– Liaise with approved suppliers/alternative suppliers for price quotation and availability of materials.

– Preparation of Cost Estimates of the bid project including PERT CPM, Bar Chart, Cash Flow, Manpower & Equipment Scheduling.

– Submit tender bid and attend opening of bids.

Projects undertaken:

Tendering government projects such as roads, school buildings, drainage & sewerage, civil works repair and maintenance.

2001 – 2001

PRECISION ENGINEERING INC. - Cebu City, Philippines Civil Engineer

Responsibilities included:

– Interpret Technical Specifications, Drawings and maintaining awareness of the different construction contracts, standard method of measurements in use and understanding the implications of health and safety regulations.

– Verify any technical report and always ask copies for any possible considerations.

– Contact approved suppliers from the vendors list and alternative suppliers for price quotation.

– Quantity survey the received BOQ ensuring that quantities and item of work required as per the plan and specifications.

– Seek and coordinate with the Client for any increase or decrease in quantities or any possible exclusions.

– Establish the cost of installation, materials and workmanships and to come out with a well- planned quotation.

– Manage project budgets and procurement.

– Project supervision including project communication, billings, claims, invoicing and collection of payments.

Projects undertaken:

Construction Subcontract with AVT Inc.

Gandara Relay Station of Smart Communication Inc., Phils. Paranas BTS of Smart Communication Inc., Phils.

Villareal 65m Tower of Smart Communication Inc., Phils. 1999 – 2000

E & L REYES CONSTRUCTION INC. - Cebu City, Philippines Project Engineer

Responsibilities included:

– Supervise and coordinate all the activities of the project and see to it that each task is performed to the fullest efficiency (i.e.; 1. Make daily logbook for all project undertaken, 2. Make purchase and coordinate deliveries, 3. Make payroll and distribute salaries if project requires, 4. Performs liaison with laboratory officer for all materials requires material testing, designers, building officials and department heads, planning officers, committee team; prequalification, bidding, and other parties involved with the projects, 5. Make weekly/bimonthly/monthly progress accomplishment report, 6. Secure and assist project inspection and commissioning, 7. Secure construction/occupation permit/permit to operate and clearance from the government, 8.) Make sure that the project site is clear and clean before turn over the project, etc.

– Participate in meetings, discussions, project site visits, workshops and hearings.

– Be able to lead a team and bring out the best in them. Projects undertaken:

Tendered/awarded/completed

Construction of Two Storey School Bldg., Canduman, Mandaue City, Phils. Construction of Lined Drainage System, Cebu City, Phils. LFMAHUSAY

CV-15/05/2019

1994 – 1998

SCHEMA KONSULT, INC. - Cebu City Branch, Philippines Quantity Surveyor/Asst. Specs. Engineer

Responsibilities included:

Design Package including project specification, tender and contract documentation and bills of quantities

– Verify any technical report and always ask copies for any possible considerations.

– Technical writing of Design and Build Construction Specifications including submission for building permit purposes.

– Establish the cost of installation, materials and workmanships as per the design and specifications.

– Prepare quantity take-off and provide timely and accurate estimates with clear delineation of project scope between material source and site works.

– Contact approved suppliers for availability of material supply and make complete vendors list.

– Preparation of tender and contract documents, including bills of quantities. Project Design and Supervision

– Assist on-going project(s) site instructions, variation order, claims, invoicing and interim payments.

– Assist on-going project(s) progress monthly reporting including preparation of cash flow, manpower schedule, project S-curve and progress work documentation.

– Assist structural engineer’s shear and moment calculations when needed.

– Assist geodetic engineer when in need of survey calculations.

– Assist company lawyer in any encoding and printing urgent matters. Road widening

– Assist survey team in field calculations.

– Assist in preparation of lot plan and technical description.

– Make assessment of affected structure in road widening for payment/non-payment evaluation. Master plan

– Perform research on assign task and coordinate respondents.

– Make record on all gathered information and populate factual evaluation.

– Liaise with concern government agencies as required to coordinate inputs to ensure full scope coverage.

– Assist in preparation of the cities master plan. Projects undertaken: Links

Second Mandaue-Mactan Bridge Project (now Marcelo Fernan Bridge), Phils. Balamban Circumferencial Road, Phils.

Tayasan Water Supply Distribution System, Phils.

Mahanagdong, Malitbog & Tongonan Geothermal Power Plant, PNOC-Phils. Cebu Public School Teachers Association (CPSTA) Subdivision, Phils. CRAMDELLS Subdivision & Housing Dev’t. Phils.

Ormoc Super Dome, Phils.

San Francisco Slaughterhouse, Phils.

UNIWIDE Mall Sales Warehouse, Phils.

Asian Motors Showroom Building, Butuan City, Phils. Asian Motors Showroom Building, Mandaue City, Phils. ABS-CBN Cebu Network Station Building, Mandaue City, Phils. Maasin Public Market & Commercial Center, Phils.

Panabo Multi-Purpose & Tourism Center, Phils.

Sto. Tomas Public Market, Phils.

SMISLE Office Buildings, Phils.

YY Commercial Building, Phils.

HDMF-WTCI Tower Building, Phils.

Apocemco Guest House (now Cemex), Phils.

Metro Cebu Development Project (MCDP III-Road widening), Phils. Carcar Master Plan (Municipality of Carcar, Cebu, Phils.) Talisay Master Plan (Talisay City Gov’t., Cebu, Phils.) Lapu-lapu Master Plan (Lapu-lapu City Gov’t., Cebu, Phils.) Cebu City Master Plan (Cebu City Gov’t., Phils.)