TOM MORRICE
* ****** ******, *****, ** N*L *A* (H) 519-***-**** (C) 226-***-**** ********@******.***
PROFESSIONAL SUMMARY
Skilled Quality Control Measurement Technician with extensive experience in the Automotive
Manufacturing industry.
Proficient with Portable CMM and software, problem analysis and countermeasure development.
Data collection and Analysis, determine root cause of problems, feedback to Engineering/Design and Supplier
APQP, PPAP and FMEA activities
Extensive training and experience in Toyota Production System.
Safety and Quality minded with excellent communication and interpersonal skills.
SKILLS and EXPERIENCE
Vectoron portable CMM, Perceptron laser scanner, FARO portable CMM, DEA Bravo CMM, ATOS
as well as conventional hand measurement tools and Check Fixtures
Data analysis to decide best countermeasure to return to standard.
Develop and monitor QC tasks, checksheets, track data, feedback to affected groups for countermeasures
From source documents, develop QA/QC standards for in-house documentation
Prepare inspections for change points at model change or line modification
Stamping/Welding measurement
Weld NDT and cut check, penetrant
Received Parts confirmation
Weld and Complete Auto Body Accuracy
Automotive Water leak FMEA & evaluation
Root Cause Analysis and Countermeasure development
ISO 9001
WORK HISTORY
Feb 2019- present
Quality Control KONSTANT Manufacturing, Brantford ON
Inspection and audit of complete welded warehouse racking
JULY 1988-Aug 2018
Quality Control Pilot Team Leader Toyota Motor Manufacturing Canada Cambridge/Woodstock, ON
Set up and perform test activities for automotive manufacturing.
Ensure safety in processes.
Provide technical training to co-workers and new staff.
Continuous Kaizen resulting in elimination of waste, reductions in process times and cost reduction.
Capture data for problem analysis, identify level up areas, work along Engineering and Suppliers for countermeasure.
Perform complex part alignments and calibration of equipment to quality standards.
PPAP:
-Ensure smooth launch of new model production by early identification and elimination
of quality and production concern areas.
-Evaluate new model production parts by fixture measurement, cross check to auto body, identifying
Concern areas for quality and production and eliminating before product launch
-Evaluation and level-up design of new model packaging to maximize PPU and reduce cost
-FMEA for vehicle water leak and wind noise by vehicle adjustment to 2x tolerance and evaluate by standard testing
APQP:
-Identify Production and Quality focus areas by studying Warranty, affiliate and in-house data to understand product
Characteristics and develop inspections to monitor control points
-Evaluate new model parts at drawing stage, prototype level, pre and post production
-Develop QC checks on raw materials, parts, in-house stamping and weld sub assemblies
-Project scheduling to ensure quick evaluation and feedback
-Quality Circle trained and experienced to develop Quality, Production and Cost improvements
-Kone Crane certification, CAD drawing training, SPC
May 1984 -June 1988
Quality Control Inspector, Borg-Warner, Simcoe, On
EDUCATION
Machine Tool Setter Operator, CMM programming Conestoga College
Goderich District Collegiate Institute, Grade 12 Diploma
Toyota Japan training in CMM, Vehicle evaluations, TPS, 5S, Genchi Gembutsu, Kanban, Standardized Work etc.
ACCOMPLISHMENTS
Chosen as member of several New Model project teams responsible for ensuring Quality In-process and
evaluation of completed product. (All New model projects at TMMC from 1990-2018 )
Quality Circle conference presenter in US and Japan
Involved in the planning and start up of three greenfield automotive plants in Ontario Canada
Consistently achieved cost cutting targets using Kaizen and eliminating waste
Helped to maintain TMMC's JD Power Gold and Platinum scores by quick problem identification and countermeasures
and ensuring quality in each process.
References immediately upon request
( all New model projects at TMMC from 1990-2019)
TPS, 5S, Genchi Gembutsu, Kanban, etc