Seeking Managerial positions at the field of handling in Project & Mechanical Engineering with an organization of repute.
SYNOPSIS
An astute professional with 16 Years of experience in the field of Mechanical Engineering with Greenfield project.
Currently working with M/S Bhushan Power &Steel Limited, Odisha as Manager.
Successfully completed M.B.A. (Production & Marketing) from Allahabad Agricultural Institute-dem., Allahabad, U.P.
Well versed with Master CAM, Windows, MS Office and Internet Applications.
Ability to manage and complete projects to the highest standards meticulously and within the given specified deadlines.
A versatile, analytical and hardworking person with practical hands-on approach.
Possess excellent communication skills to present points precisely and clearly.
CAREER CONTOUR
Since Aug’04 M/S Bhushan Power &Steel Limited, Orissa Manager
Responsibilities:
Responsible for Project work (structural), Erection & Fabrication of Industrial Structural Shed of SMS-I & II (Capacity – 75 Cubic Meter x 2 EAF and LF), 500 TPD Kiln, 130x4Power Plant, 3.8 MTPA Pellet & 6.5 MTPA Beneficiation Plant, 1 MTPA Coke Oven By-Product, 2.47 MTPY Sinter Plant, 0.5 MTPA WRM, 0.25 MTPA Billet & Conditioning Line, 0.15 Black Bar Inspection Line, SMS-I (Capacity- 90 Cubic Meter x 4 EAF and LF) & CRM Plant, Canopy Hood, Dedusting Duct and Billings.
Key Result Areas:
1.Fabrication, Erection of Shed Structures and Technological Structure.
2.Lead and Regular co-ordination with the erection teams.
3.Co-ordinate with the Contractors.
4.Leading a team of Project Engineers for Efficient Planning.
5.Preparing BOQ, Checking and Signing of BOM of Contractors Bills.
6.Inspection of Quality Work (Welding & Painting) using NDT, DPT, UT and RT etc., Dealing with 3rd Party (BVIL & SGS) for smooth execution of Project.
7.Material and Manpower management.
Project Planning & Management
Handling project activities involving working out various requirements with respect to utilities, machines, manpower & monitoring overall project operations for ensuring timely completion.
Developing financial projections, preparing budgets and performing extensive project costing; managing resources to perform project activities in cost effective manner.
Installation & Commissioning
Managing the installation & commissioning of equipment, conducting tests & inspections to ensure operational effectiveness of plant & utilities.
Reviewing engineering drawings, layouts, diagrams, technicals for commissioning of the plant.
Spares Management/ Procurement
Designing, implementing and monitoring effective procurement schedules along with finalizing the specifications of the spare parts and establishing the quality & quantity limits.
Overseeing the procurement of equipment spares & services and store related issue; controlling the inventory to minimize downtime and maximize equipment availability.
Accomplishments
Pivotal in managing the maintenance and troubleshooting of gear boxes, centrifugal pumps, cooling tower, compressors.
Successfully managed all types of installation & maintenance work of vibrating screens, magnetic separators, roller crusher, jaw crusher etc.
Efficiently managed the maintenance work of
oESP pneumatic ash conveying systems, Pug mill etc.
oBucket Elevators, Rotary Feeder.
oAll Belt Conveyor Systems.
Distinction of single handedly managing Belt Conveyor (50 mtr) 2nos projects that improved operational efficiency and reduced maintenance cost.
Instrumental in managing installation and erection by own self for vibrating screen - 126 tones and magnetic separator - 100 tones.
Played a key role in handling major labor issues and vendor issues in consultation with the HOD.
Preparing monthly report and analysis of breakdown to find out problem & solution. Planning of preventive & corrective maintenance.
Preparing critical spare list and maintaining their availability through SAP.
Handled the erection & commissioning and maintenance work of rotary sponge iron kilns & coolers of capacities 500TPD (4 No s) supplied by LURGI technology and Raw material circuit.
May’03 to Jul’04 M/S Jyoty Structures Ltd., Mumbai Engineer
Responsibilities:
,
,
Responsible for Fabrication, Erection of H.T. Tower, Erection of H.T. Transformer and Installation of H.T. Tower.
Jan’01 to May’03 M/S. Suburban – Ply & Panel Pvt. Ltd., Khurda Trainee Engineer
Responsibilities:
Looking after the maintenance and operation of the following equipments :Hydraulic press M/c, Boiler, Dry, M/c, Clipping M/c .
ACADEMIC
2006 M.B.A. (Production & Marketing) from Allahabad Agricultural Institute-dem., Allahabad, U.P with 75.65%
2001 B.E. (Mechanical) from C.V. Raman College of Engineering, Orissa, Utkal University with 64%
TRAININGS UNDERGONE
Company Name: Paradeep Port Trust, Paradeep, Orissa
Duration: 05’1999 to 06’1999
Company Name: Paradeep Phosphate Ltd, Paradeep, Orissa
Duration: 05’2000 to 06’2000
IT FORTE
Well versed with Master CAM, Windows, MS Office and Internet Applications.
PERSONAL SNPPETS
Date of Birth: 5th May 1976
Father’s Name Sri Bhagaban Samantray
Religion Hinduism
Nationality Indian
Marital Status Married
Languages Known: English, Hindi and Oriya
Present Address: C/O. R. Ch. Gupta,
Cox colony, Near convent school,
PO/Dist.- Jharsuguda-768203, Odisha
Permanent Address: Plot No. 928/932 (Canal Road),
Nigamananda Nagar, Lane -2,
Bomikhal-751010, Bhubaneswar
Notice Period 1 Month
SIGNATURE