CURRICULUM VITAE
DIPAK YADAV
Add- Vill- Pagahin Post- Dhanapur
Distt- Chandauli Pin – 232105 U.P.
Mob- +919*********
Email- ******************@*****.***
Executive Summary:-
A dynamic professional with over 3+ years of extensive experience in Power Plant Maintenance Department (CFBC,AFBC & Whrb & Maintenance in BTG Area)
In 15 MW thermal Power Plant in Raipur Steel & Power LTD . As a Maintenance Engg.
2 x 30 MW SKS ISPAT & POWER LTD., Siltara Raipur (C.G.)
1 x 25 MW SKS ISPAT & POWER LTD., Siltara Raipur (C.G.) as a maintenance Engg. In
BTG .
Organizational Summary:-
Profile Summary :
Capacity : 85 mw thermal power plant Maintenance
Owner Company : SKS ISPAT & POWER LTD. Siltara, Raipur (C.G.)
BTG Description : 175 TPH CFBC Boiler (WUXI-CHINA ) Pr-64 Kg/cm2
&Temp. 485 C,
120TPH AFBC Boiler (Cethar Vessels Pvt. Ltd.)
100 TPH WHRB Thermax Limited
Working Duration : Since 22 Oct. 2018 to till date .
Designation : Maintenance engineer.
Job Description : Maintence of BTG Area.
Turbine :-
2 x 30 MW (HTC-CHINA), 3000 RPM, (64 Kg/cm2,Temp - 485 C)
1 x 25 MW (BHEL 7500 RPM, Pr-64 Kg/cm2, Temp – 485 C )
Job Profile :-
Supervising Mechanical maintenance and calibrations activityof Production area.
Preventive maintenance activity supervision and scheduling.
Reporting of maintenance calibrations, Breakdown and spare consumed in those
Activities
Actively participation modification and development of process and machine for
Better performance.
Profile Summary:-
Previous Experience :-
Work Experience :- (2.4 Years)
Capacity :- 15MW Thermal Power Plant.
Company Name :- Raipur Power ad steel ltd. Plot No. 75, and 76 Industrial growth canter, borai, Rasmada Dist. Durg (c.g.)
BTG Description :- 40 TPH AFBC Boiler (vision company) and 10 TPH 3 WHRB Boiler/64 KG./CM. 4850 C Boiler and 15 mw turbine (triveni)
Working Duration :- Since 14 June 2016 to 21.10.2018
Company Profile:-
Raipur Power and steel ltd. is setting up a fully integrated 2.5 million TPA steel plant with, stainless steel plant at Raipur in Chhattisgarh the facility includes a pig iron plant. Coke oven plant, ferro chrome plant, sponge iron plant, power plant and special and stainless steel plant.
Knowledge Purview
Working area in Boiler Pressure Part . & CHP Work:- crauser and screen etc.
WORKING AREA IN TURBINE:
Erection & alignment of static equipment such as
DE-AERATOR structure, dmcw, low pressure dosing tank, control fluid tank, main oil tank, erection and aligment high pressure heater erection and aligment, Low Pressure heater erection and aligment.
Seal oil system
Auxiliary Rotary such as Turbine Driven Boiler Feed Pump (TDBFP)
Professional Qualifications:-
B.Tech : Mechanical Engineering .Passed 2015-16 with 69.43%
From Sainath University Ranchi Jharkhand
Academic Qualificastions:-
High School from U.P. Board in 2006 with Science Stream.
Intermediate from U.P. Board in 2008 with PCM group.
Computer Proficiency:-
Programming Language Basic Knowledge of - C.
CCC from NIELIT
Personal Information:-
Date of birth : 13-07-1991
Father’s Name : Mr. SugrivYadav
Gender : Male
Nationality : Indian
Marital Status : Single
Language Known : English, Hindi
Height : 5 fit 8 inch
Declaration:-
I hereby declare that information finished above is true to the best of my knowledge and I bear the responsibility for the correctness of the above mentioned.
Date : Signature:
DipakYadav