A Primavera proficient planning engineer, holding Master’s degree in the field of Construction Project Management having 6 years of work experience in the field of Construction Planning of Residential towers and Luxurious Hotel is seeking for job opportunity as a Planning engineer, to pursue a career in the field of Construction Project Planning along with a progressive organization that gives scope to enhance my knowledge, skills and to reach the pinnacle in the field of Construction Project Management with sheer determination, dedication and hard work. WORK EXPERIENCE – 6 YEARS
PROJECTS
Company Name Time Period Experience Location
MS Construction LLC
Planning Engineer
Mar 2018 - Ongoing 1.4 Year Dubai, UAE
ALEC
Planning Engineer
Sep 2015 - Mar 2018 2.6 Years Dubai, UAE
B.M.Patel Contrcating LLC
Jnr. Planner
Jun 2013 - Jun 2015 2 Years
Ahmedabad,
India
SKILLS
Primavera P6 EOT Claims MS Office
Proficient Advanced Proficient
Project Name SAFA - A SAFA - B Bluewater Tamweel Tower Shyam Elegance Project Type Residential & Commerical Residential & Commerical Retail Area & Luxurious Hotel Residential & Commerical Residential & Commerical Scope of Work
2 Plots & 4 Buildings
(B+GF+4+LR+UR)
2 Plots & 7 Buildings
(2B+GF+14+LR+UR)
Retail Area, Luxurious
Hotel, Conference Center
& Beach Club
Rectification work of Fire
Damaged Tower
(2B+G+34+R)
6 Buildings
(B+GF+7+R)
Client Meydan Developer Meydan Developer Merras Developer Orient Insuranse LLC Vrundavan Infrastructure Contractor MS Construction LLC MS Construction LLC ALEC ALEC B.M.Patel Contracting Project Value 255 Million (AED) 670 Million (AED) 1.8 Billion (AED) 145 Million (AED) 150 Million (AED) Project Location Nr. Dubai Water Canal
Nr. SAFA Park &
Dubai Water Canal
Bluewater Island
Nr. Jumeirah Beach
Jumeirah Lake Towers,
Cluster U
Ahmedabad, Gujarat, India
Project Duration 14 Months 20 Months 36 Months 9 Months 20 Months RESPONSIBILITY
As a Planning Engineer, I have Performed following Major Tasks: Planning:
• Prepare the Resource & Cost loaded Baseline Program, based on scope of work. Monitoring & Controlling:
• Update the Baseline Schedule on Weekly basis and Analyze the Project Progress.
• Analyze the Actual Progress against the Plan and if required Change the Sequence of Work and maintain the Change log.
• Highlight Project Manager if any Slippage in Project Completion Date and give the list of Critical Activities Delaying the Project End Date.
• Discuss the Critical issues of the Site with Project Manager & with Site Operation Team in Weekly Progress Meetings.
• Prepare Look Ahead Schedules, S Curves, and KPIs for Engineering and Construction Activities.
• Maintain the Logs for Delay Events, Engineer’s Instruction & Variation Order to Track the Delay Events & to Prepare the EOT Claims.
• Present Recovery Plans to Mitigate the Delays and follow it up with the Site Team and Subcontractors to Achieve the Agreed Targets.
• Prepare Progress Tracking sheet for Major Trades of the Project.
• Prepare and Send Delay Notification Letter to Sub-Contractors & Client.
• Measure the Productivities and Prepare reports for Forecast completion date of the Project based on Productivity rate on site.
• Site walk with Client’s representative and Inform him about the Progress on Site. Management & Client Reports:
• Prepare & Present the Project progress Presentation in Client & Management meetings.
• Prepare Daily, Weekly and Monthly Reports for Client Submission.
• Prepare Delay events reports using Time Impact Analysis method for Additional work and notify the client and submit the EOT Claims.
• Present Recovery Plans to mitigate the delays and follow it up with the Subcontractors.
• Prepare and present a Dashboard for Management meeting covering KPI’s for all the engineering and construction activities. Sub-Contractor Management:
• Review and Formally Approve the Subcontractor’s Baseline schedule.
• Review Subcontractor’s Updated Schedule and Check the Actual Progress with Master project schedule.
• Prepare and Send Notice of Delay Letters to Sub-contractors, in case Subcontractor is delaying the project. THESIS WORK
Thesis work was done on “Study of Construction Disputes & its Resolution through Arbitration for Ahmedabad city of Gujarat state of India” during Post graduation.
Prepared a project on “Application & Comparison of different Formwork system used within Indian Construction Industry” during graduation.