Post Job Free

Resume

Sign in

Engineer Project

Location:
Kolkata, West Bengal, India
Posted:
June 28, 2019

Contact this candidate

Resume:

PRIYANKO MUKHERJI

SENIOR PIPING ENGINEER

Email : ac9pre@r.postjobfree.com

Phone No.: +91-967*******

D.O.B:11.09.1977

Address: Flat No.24, Superway Estate, 108/6 Maniktala Main Road, Kolkata-700054.

LinkedIn Profile : linkedin.com/in/priyankomukherji

SUMMARY

Total experience of 14 years(Oil & Gas+ After Sales Service), worked on design and detail engineering activities of Petrochemical, Oil & Gas, Refineries and Chemical Plant designing major in Layout division involving basic scope review, P&ID review, preparation of equipment & piping layouts, 3D modelling (PDS/PDMS/SP3D), model review (SPR,NAVIS WORK, AVIVA), clash resolution, isometric generation with Iso-gen or manually, then checking, BOM, Stress Analysis, piping material specification, pipe wall thickness calculation, preparation of material requisitions as well as construction scope of work, technical bid review and evaluation, to support Marian software utility documents, vendor drawing review of equipment(TBE) and vendor interface meetings, model review, support schedule and standards preparation etc. Worked on both Brown Field and Green Field projects likewise. Tie in list; tie in package development including sketching and associated MTO, also undertaken. Have exposure to Pipeline projects as well, AHMEDABAD-MEHSANA pipeline project executed.

Conversant with International codes such as the American Society of Mechanical Engineers (ASME), American National Standards Institute (ANSI) and Saudi Aramco standards.

Overseas exposure to Singapore, Italy, Middle East, IRAQ on various project deputation work.

EXPERIENCE

FROM– FEB 2017 –TO MAY 2017

PIPING ENGINEER (CONT.4 MONTHS), FOSTER WHEELER KENTZ (DUBAI), UAE

Supervising isometric generation, checking supporting of GRE pipes used for construction of Fresh Water Plant, under third party stress marking. Plot plan development and checking based on site mark-ups. Tie in study and sketch development along with existing brownfield pipeline for sea water distribution network. Tie in scheduling in accordance to shut down brownfield facility. Section Layouts, model, MTO and isometrics for 6” bypass line. Checking of 3D model generated by PDS, using Smart Plant software. Checking Plot plans to match line numbers, flow, support marks, title block etc. as per check lists. Consult PDS admin and resolve hold points identified by designers also those identified while checking.

Package handled was Sea Water Distillation.

FROM JUNE 2015 – TO JULY 2016

SR. PIPING ENGINEER, PETROFAC, SHARJAH, UAE

Worked in Proposal job for PDO (Lead Estimator, Oman SNDC & KDC Projects). Man-hour estimation, specification generation and materials are major activities being performed. Various proposal and estimation activities. MTO generation from P&IDs using in-house PPMS software. Costing, RFQ and TBE, PO generation to vendors. Estimation mostly for Green field jobs. Scope study and risk assessment to support post engineering activities. Load calculation reports and support count for CIVIL interface were produced for estimation. Other disciplines like HSE, electrical, instrumentation, construction were supported with information gathered. DOQOOM project estimation activity also done.

Shell DEPs were handled from Shell DEP version 32(feb, 2011), which specifies exact manufacture criteria for materials and specifications acceptable to Shell related Projects concerning vendor supply, manufacturing techniques, construction respectively acceptable for Shell projects. Piping material, valve material/specifications are governed by these DEPs. Similar trend for SAUDI ARAMCO projects. All vendor’s supply that meets DEP criteria were selected from AVL (available vendor list) that were provided for project being executed. For MTO of materials (piping), requisitions and costing down the line these specifications were mandatory along with AVL to appear with correct POs (purchase orders).As a part of proposal and estimation Shell DEPs played a vital role.

Packages handled were Chemical Injection, Nitrogen, Plant Water, Instrument Air, SRU (by third party), Effluent treatment and TEG packages as specified and developed on process requirements.

FROM JUNE 2014 – TO MARCH 2015

SR. PIPING ENGINEER, WORLEY PARSONS, ABUDHABI, UAE

As Senior Piping Engineer worked for Shell, Rehabilitation of West Qurna Project CS6, 7 & 8, Basrah, Iraq. Scope of work included, Construction BOQ as per tie-in requirements, Specification preparation, Pipe wall thickness calculation, sketches, Material Requisition, Piping Bulk MTO, Piping support specification preparation, tie-in schedule and isometrics, respectively. Plot Plan, GA, guide engineers for modelling using PDS, further reviewing in SPR, followed by isometric development for new scope of work. As reference photogrammetry /raster site images from existing plants were used. Included IRAQ site visit frequently.

Attend various Client Interface and HAZOP, model review meetings. Handling a team of three designers or two modelers varying on Project demand. Maintain schedules to match Project milestones, inter-disciplinary checking and commenting as necessary. Tie in location identification, matching sketches at Brownfield plant during site visits and capturing feasibility of providing tie-ups at proposed locations were checked.

Chemical Injection and TEG packages were handled.

Shell DEPs were followed for MTO derivation of materials, followed by estimation, requisition procurement respectively.

Most UAE based projects related to materials widely call for Shell DEP or Saudi Aramco specifications.

FROM SEPT 2012 – TO MAY 2014

LEAD PIPING ENGINEER. PIPING ENGINEER II, FLUOR DANIEL, DELHI, INDIA

Besides actively being involved with FEED job for an LNG Project coming up PETRONET, Dahej in India, also involved with estimation and associated engineering efforts for a revamp project for an existing plant in central India CYTEC Nagpur, specially a paint/aromatic industry. Undergone training in SP3D. Interdisciplinary communications, vendor interface, layout development, MTO preparation, model checking are prime mode of work performed. Provide suitable and support MTO activities from other disciplines. Attend weekly meetings to review schedule and track progress reports by planning.

Projects handled:

1)Petronet L5NG, Dahej, Gujrat

2)Cytec Project, Nagpur

3)ODOPTU, Russia

Experienced in handling 3 designers, 1-4 modelers, based on Project Requirements

FROM JULY 2011 – TO JULY 2012

SR. PIPING ENGINEER, MOTT MAC DONALD, KOLKATA, INDIA

As Senior Engineer Piping was involved with various Oil and Gas, Pipeline and Chemical Projects mainly Greenfield.

Main Projects Executed:

1) Phillips Carbon Black

2) Himadri Chemicals

3) ONGC Pipeline expansion Project.

4) Haldia Petrochemicals

5) Bridge and Roof Corporation

Key scope of work include detailed scope study, P&ID review, Isometric checking, Pre-bid estimations and Layout study at different phase, specification and requisitions.

OTHER RESPONSIBILITIES:

– Review and check status for various deliverables and tracking of work flow process

– Assist discipline head in various engineering activities of this project

– Understanding scope for the Project and technical aspects.

– Inter departmental co-ordination for obtaining inputs to specification

–Review of reference drawings wherever available

–Isometric checking and BOM

–Assist in stress analysis activities

–Generation of Specifications and requisitions

–Studying P&IDs, PFDs and other scope documents

–Client interface

–Handling Pre-bid Pipeline projects under ONGC.

–Assisting designers in their work.

FROM SEPT.2010 – TO APRIL 2011

SR. PIPING ENGINEER, FOSTER WHEELER, KOLKATA, INDIA

IOCL Project, Paradeep – Responsibilities:

–Participate in Design and detail engineering activities using PDS software.

- Model review and check for correctness of model, attend Model review sessions at Client’s location

- Vendor drawing commenting, vendor interactions

- Interdisciplinary communications

- Coordinating a team of 4 members associated with SRU portion of the Project

- Isometric generation and checking

Mostly green field projects handled.

FROM DEC.2008 – TO AUG.2010

SR. PIPING ENGINEER, TECHNIP INDIA LTD-CHENNAI, INDIA

Projects:

–Motor Oil Project

–Neste Oil Project-Rotterdam

–Al Jubail Project-UAE

Responsibilities:

– Design, detail engineering and review engineering documents, P&IDs, client standards etc.

– Checking layout drawings, equipment specifications according to clients’ requirements and piping and instrumentation diagrams; review piping/equipment drawings and check fouling

– Project designed on PDS platform, reviewing and checking for clashes in model review using SPR

– Isometric extraction, checking and issue for construction

– Co-ordinate with vendor/client over technical issues and approval of vendor drawings

– Assist Lead Engineer in detail engineering and drawing/document review

– Review general arrangement drawings based on equipment drawings and check locational feasibility, interdisciplinary communications.

– Co-ordination with a team of designers and evaluate schedule target and quality

-On-job modelling activities using PDS.

- Deputed in Rome, Italy for 7 months for IFC activities of Neste Oil- Rotterdam Bio-diesel Project, FRANCE.

FROM APRIL 2007 – TO NOV.2008

PIPING ENGINEER, JACOBS ENGINEERING PTE LTD, SINGAPORE

Projects:

–Lonza Project, Singapore-Bouvis Lease(Pharmaceutical)

–Neste Oil Project- Singapore

Responsibilities:

–Checking and review of scope documents and final deliverables like isometrics, piping layout drawings etc.

–Pre-Bid estimation

–Vendor interaction and material selection for GRP material (heat traced)

– Preparing bill of quantities, vendor document review, check technical correctness of purchase requisitions and orders (TBA)

–Interdisciplinary communication and client interface meetings

–Coordination with team members to produce deliverables within schedule.

FROM OCT.2005 – TO MARCH.2007

PIPING ENGINEER, TECHNIP INDIA LTD-CHENNAI, INDIA

Project:

–Khursaniyah Project, Saudi Aramco-UAE

Responsibilities:

– Design, detail engineering and review engineering documents, P&IDs, client standards etc.

– Checking layout drawings, equipment specifications according to clients’ requirements and piping and instrumentation diagrams; review piping/equipment drawings and check fouling

– Project designed on PDS platform, reviewing and checking for clashes in model review

– Isometric extraction, checking and issue for construction

– Co-ordinate with vendor/client over technical issues and approval of vendor drawings

– Assist Lead Engineer in detail engineering and drawing/document review

– Review general arrangement drawings based on equipment drawings and check locational feasibility, interdisciplinary communication.

– Co-ordination with a team of designers and evaluate schedule target and quality.

-Deputed in Rome, Italy for 3 months for basic design activities of Khursaniyah Project.

FROM JUNE 2003 – TO SEP.2005

PIPING ENGINEER, QUOTIENT ENGINEERING PTE LTD-KOLKATA, INDIA

Projects:

–Nine Tank Expansion Project-Stolthaven-US

–Kaneka Project-US

–Chevron Phillips-US

–Motiva Project-US

–Pre-bid Projects

Responsibilities:

–Checking and review of scope documents and final deliverables like isometrics, piping layout drawings etc.

–Pre-Bid estimation

– Interdisciplinary communication and client interface meetings

–Coordination with team members to produce deliverables within schedule.

EDUCATION

FROM AUG 1997-TO APRIL 2001

B.E.MECHANICAL, P.V.P.I.T budhgaon, sangli, kolhapur, maharashtra, india.

Distinction 71% 1st Class.

MAY 2015

CERTIFICATES, UCI university of california, IRVINE

Initiating and Planning Projects

Budgeting and Scheduling Projects

Managing Project Risks and Changes.

APRIL 2015 -ONGOING

MBA OIL AND GAS, CCE-UPES, DEHRADUN, INDIA

SKILLS

Conversant with Microsoft Office

PDS

PDMS,

SP3D

Auto CAD,

Micro-station

Smart Plant Review (SPR)

NAVIS WORKS

CAESAR II basics

PPMS(in-house Petrofac software)

3D Plant LINx, Regeneration of Scanned files.

LANGUAGES

English (Fluent, speaking, reading and writing)

Hindi (Fluent, speaking, reading and writing)

Bengali (Fluent, speaking, reading and writing)

ACTIVITIES

Passion for drawing, painting, sculpture

Socializing and net surfing.

ACHIEVEMENTS

1)Appreciation by Project Manager Technip Italy for successful, timely and qualitative completion of Construction Packages.

2)Flour Management offers Increment and Promotion based on merit shown at work, within 4months of joining.



Contact this candidate