FREDDERICK G. MENDOZA
Current Address : Al-Thumama, Doha Qatar
Contact Number : +974********
E-mail Address : **********@*****.***
Philippine Address : 440 San Pascual Obando Bulacan 3021 Philippine Number : +632-*******
Applying for Document Controller Position
SUMMARY OF QUALIFICATIONS
Over 10 years of Gulf experience and more than 5 years of local experience in the field of Inspection for visual welding, piping, mechanical materials, document control and other QA/QC related activities. Started working as a Quality Controller at the age of 19 in the Food Industry and since then had worked as a Quality Controller in different Industries like Manufacturing, Business Process Outsourcing (BPO), Fabrication and Construction Working in the fabrication and erection of piping components and steel structures for Power plants, Refineries, Petrochemical plants and other process-related facility. Well organize in the preparation of final Quality documentation and test packages. Involved in quality audit conducted by client and other third party auditors from ISO 9001 for review and recertification. Preparing final documentation that will be submitted to client handover. Ensures construction activities are performed in accordance with project specification and inspection and test plan. Conduct visual inspection of all completed welds. Inspect material received. Maintain and review welder’s qualification records and equipment calibration records. Check qualified welders, type size and conditions of electrodes and process used as per WPS. Check and verify installation of static, rotary equipment and steel structures. Coordinate with the key personnel involved in the project, pertaining to quality matters. Kept the records of all project relevant documents and reports. Initiate in raising nonconformance reports in case any nonconformity or deviation arises. Prepares and verifies quality control documents and test packages for final handover to the owner. Prepares for hydro test and pneumatic test for the test packages. Reporting to QA/QC Manager and to the lead/senior QA/QC.
PROFESSIONAL EXPERIENCES
Company : ALYSJ Joint Venture
Position : QUALITY CONTROL ENGINEER (MEP)
Client : Qatar Rail
Date : July 2015 to June 2019
Projects : Doha Metro Rail Project (Gold Line Underground Project) Project Description – The Doha Metro Gold Line, also known as the Historic Line, is designed to support the underground transportation system in Central Doha, Qatar. More specifically, the Line extends from Ras Bu Abboud Station in the east (near Hamad International Airport), crosses Musheireb Major Station and reaches Sport City in the west (near Aspire Zone). The Gold Line comprises of 10 stations, namely Ras Bu Abboud, Qatar National Museum, Souq Waqif, Bin Mahmoud, Al Sadd, Joaan, Al Sudan, Al Waab, Sport City and Al Aziziyah. The overall Doha Metro Gold Line route length is estimated at about 32 km. The Gold Line 'Design & Build' (D&B) Contract was assigned by Qatar Rail to the ALYSJ Joint Venture, which is led by AKTOR and includes L&T, Yapi Merkezi, STFA and Al Jaber Engineering’s participation. Company : AMEM Engineering QATAR W.l.l.
Position : QUALITY ASSURANCE / QUALITY CONTROL
INCOMING MATERIAL INSPECTOR
Client : PWA Asghal Infrastructure Affairs
Customer : Keppel Seghers Engineering Singapore PTe Ltd Date : June 2011 to May 2015
Projects : Doha North Sewage Treatment Works (DNSTW) Project Description – Doha North Sewage Treatment Works is ongoing construction of Qatar largest wastewater treatment and reuse facility and will have a peak capacity to treat wastewater of up to 439,000 cubic meters per day. AMEM scope is to complete the mechanical, electrical and instrumentation works which includes a wide range of activities such as erection of steel structures and pipe racks, installation of machineries, equipment and pumps, piping activities including GRP works, installations of panels, cable tray and support, terminations works including cable pulling and inspections. Project Cost 60,564,430.15 Million Dollars. Company : AMEM Engineering QATAR W.l.l.
Position : QA/QC INSPECTOR
Client : PWA Asghal Infrastructure Affairs
Customer : Keppel Seghers Engineering Singapore PTe Ltd Date : March 2010 to June 2011
Project : Domestic Solid Waste Management Centre (DSWMC) Project Description – Domestic Solid Waste Management Center (DSWMC) situated in Doha South is the first integrated solid waste treatment facility in the Middle East designed to treat an initial capacity of more than 1,550 tons of waste a day. The DSWMC comprise of waste sorting and recycling facilities, landfill, composting plant and a 1,000 tons per day Waste-to-Energy (WTE) incineration plant. AMEM scope is full mechanical erection of the plant including three heaters, danodrums and other equipment’s, steel structures, piping etc) and the electrical and instrumentation supply and installation.
Company : Nasser Al-Hajri Corporation (NSH)
Position : QA/QC INSPECTOR
SPOOLGEN V OPERATOR
Date : June 2007 to June 2009
Project : Nasser Al-Hajri Fabrication Division (Dammam KSA) Project Description – NSH provides meticulous construction and fabrication services to the full spectrum of the industrial and infrastructure work area including, but not limited to, commercial & heavy industrial buildings, oil, gas, refineries, petrochemicals, fertilizer, cement, power, desalination, aluminium, steel, and others. With a vast experience spanning over 3 Decades in Middle east and supported with a magnificent force of over 60,000 experienced and highly skilled employees coupled with two highly advanced and highly automated ASME approved fabrication shops. NSH work with all major international clients and the customer profile includes Saudi Aramco, SABIC & its affiliates, Qatar-Gas, Ras-Gas, ADNOC, Sipchem, Shell, Exxon Mobil, Total, Qatar Petroleum, Oryx- GTL, Dolphin Energy, Tasnee, Chemanol etc.. Recently NSH executed 2 major jobs for SABIC, simultaneously and achieved over 90 Million safe man hours. With its main headquarters based in Al - Khobar, Saudi Arabia, NSH has achieved a "GRADE A "rating as a general contractor by the Saudi Arabian Government. ACCOMPLISHMENTS / ACHIEVEMENTS
Part of ALYSJ QA/QC Team in the Doha Metro Gold Line Underground Project in 8 million Safe Man Hours, without any Lost Time Injuries (LTI)
Part of AMEM QA/QC Team under Keppel Seghers Doha North Sewage Treatment Woks (DNSTW) project in achieving 10 Million Man-hours without LTI.
Part of AMEM QA/QC Team under Keppel Seghers First Solid Waste Management Project in achieving 10 Million LTA Free Man hours.
Part of AMEM QA/QC Team under Keppel Seghers First Solid Waste Management Project in the Middle East in achieving Two Million Man-hours without LTI.
TRAINING / SEMINAR
Confined Space Safety Training: DISS Doha Qatar
ACONEX Basic Training and Workflow Training
AutoCad 2007 with Color Rendering Level I and Level II
Computer Troubleshooting; University of the East
Career Path Objectives and Orientation; PUP Sta. Mesa
Computer Ethics; University of the East
PERSONAL DETAILS
Date of Birth : June 30, 1980
Place of Birth : Manila, Philippines
Status : Married
Citizenship : Filipino
Religion : Christian
Sex : Male
Height : 5’8”
Weight : 107 Kgs.
Language Ability : English & Filipino
EDUCATIONAL ATTAINMENT
Bachelor of Science in Computer Engineering
University of the East (2003)
Manila, Philippines