Post Job Free
Sign in

Manager Project

Location:
Solano, Nueva Vizcaya, Philippines
Posted:
June 23, 2019

Contact this candidate

Resume:

CURRICULUM VITAE

APPLIED POSITION:

RESIDENT ENGINEER / CONSTRUCTION MANAGEMENT (CM)

NAME OF STAFF:

RUBEN B. SANTIAGO

PROFESSION:

Civil Engineer

DATE OF BIRTH:

October 27, 1958 NATIONALITY: Filipino

PLACE OF BIRTH:

MAKATI CITY

MEMBERSHIP IN

PROFESSIONAL SOCIETIES:

Professional Registration

Registered Civil Engineer, License No.54137

Member, Philippine Institute of Civil Engineers (PICE)

DETAILED TASK ASSIGNED:

Functioning as Project Consultant to implement as per plan and specification and assist Project Manager by being responsible for office administration and management of support staff, and conduct the following Services.

1.Construction Sites Supervision

2.Operational and Technical Support

3.Assist Environmental Management

4.Safety Pre cautions

5.Project Coordinator (weekly/monthly meetings)

KEY QUALIFICATIONS:

Mr. Santiago has more than 35 years of extensive experience in the field of civil engineering. He has been involved in both construction supervision and detailed engineering design of various infrastructures like roads, airports, utilities and buildings projects in the Philippines, Micronesia, Malaysia, and Kingdom of Saudi Arabia. Among his notable airport project involvement as a Civil Engineer include the Federated Aviation Administration’s Construction of Yap International Airport, Aircraft Rescues & Fire-Fighting Facility (ARFF) Building in Micronesia and the Kuala Lumpur International Airport UT01 & UT07 Infrastructure & Utilities Package (Roads, Water & Sewer, Power, & Telecom system) both located in Kuala Lumpur, Malaysia.

Training Courses and Seminars attended were:

(1)PICE-Baguio’s First Series of CPE Seminars for 1999 conducted on March 26-27, 1999 at Skyrise Hotel, Baguio City with the following topics:

a)Construction Contract Management

b)PD 1594 and Other PRC-Related Matters Affecting Civil Engineers

c)Strategic Planning

d)The Basic Essentials of High-Rise Building Construction

e)CONSTRUCTION OCCUPATION SAFETY AND HEALTH (COSH)

(2)Seismic Engineering (1988 Uniform Building Code) conducted by St. Louis University, College of Engineering and Architecture, Department of Civil/Geodetic Engineering, July 12, 1991

(3)EDPITAF Values Development Program conducted by Educational Development Projects Implementing Task Force, Department of Education held at Montevista Conference Center, Pansol, Laguna, November 21-23, 2001

(4)CONSTRUCTION OCCUPATION SAFETY AND HEALTH (COST) Held on June 17,18,24,25, 2017 at Marsk Building, Aurora Boulevard, Balete Drive, Quezon City.

EDUCATION:

Bachelor of Science in Civil Engineering, Manuel L. Quezon University, 1981

LANGUAGES:

Language Read Write Speak

English Good Good Good

Filipino Good Good Good

EMPLOYMENT RECORD:

Employment Record A (Position and Employment)

April 2017 to Present : Project Manager

Private Practice

Feb. 2016 – March 2017 : Project Consultant Philippine Science High School

Main Campus, Agham Road, Diliman Quezon City

Oct. 2013- Sept.2015 : Deputy Project Manager DCCD Engineering Corporation/Katahira Engineers International joint venture.

Mar. 2012 – July 2013 : Head of Engineering Department for BCS Group of Company

July 2011 – Mar. 2012 : Project Manager for IPADS Development Corporation

Sep. 2010 – June 2011 : Project Manager for New City Builder Inc.

Mar. 2009 – Jul. 2010 : Resident Engineer/Contracting Officer Project Management Unit (PMU) for Federate State of Micronesia

Jan. 2008 – Feb. 2009 : Project Manager for Penta-Ocean Construction Co., Ltd.

Jan. 2005- Sept. 2007 : Project Manager for Burgandy Asset Development Corporation

Oct. 2001 - Dec. 2004 : Department of Education Culture and Sports (EDPITAF)

Ultra, Pasig City

Aug. 1999 – Sept. 2001 : Resident Engineer for Syed Mohammad, Hooi and Bennie Sdn Bh

Kuala Lumpur, Malaysia.

Aug.1997 – July 1999 : Project Manager for AAY & TYRC Joint Venture

Kuala Lumpur, Malaysia

Jan. 1995 – Jul. 1997 : Sr. Site Engineer for PILECON Engineering BHD, Kuala Lumpur, Malaysia

Jan. 1991 – Dec. 1994 : Sr. Project Engineer for Rank Arabia Construction Company

Oct. 1985 – Dec. 1990 : Sr. Project Engineer for Abdullah Rashid Dosarry & Partner Co., KSA

Sep. 1983 – Aug. 1985 : Project Road/Bridge Engineer for IPI Engineering Consultant.

Jan. 1981 – Aug. 1983 : Project Engineer for Dai-Iche Realty Joint Venture

Employment Record B (Experience)

Design and Build 3rd Storey School Building and 2nd Storey School Building

Sta Cruz, Ilocos Sur.

Location : Philippines

Period : April 2017 to present

Position : Project Manager

Duties Rendered : SECURE BUILDING PERMIT

Review the plan and specification directly in charge of the day to day

Safety pre cautions during construction activities from excavation

Up to finish the project base on approved schedule. Attend weekly

coordination meeting with the client and submit weekly

Accomplishment report.

During construction for the installation of Rebars for Footings,

Beams, Columns, Stirrups are base on approved plan and spec.

Prepare check list of punchlist remaining

Corrective works and joint final inspection with the client after

The completion of works.

4th Storey Building 10 Class Rooms and Campus Road Concreting works Philippine Science High School Main Campus, Agham Road, Diliman, Quezon City

Location : Philippines

Period : Feb. 2016 to March 2017

Position : Project Consultant

Duties Rendered : Oversee the contractors responsibilities and ensuring that the works are being executed in accordance with the contract requirements. Reviewed all the submittals required under the construction contract, that include the materials and shop drawings for approval, insurance, various Requests for Information (RFI), etc. and submitted the same to the concerned persons designer or owner for approvals. Implemented the quality management systems and procedures being adopted on site. Attended coordination meetings with the owner, contractors, architects, design engineers and other consultants. Regularly reviewed the construction program submitted by the contractor based on his weekly accomplishment target. Conducted daily inspection of all ongoing works and issued inspection reports to the owner and inform the concerned contractors if non-complying items works are being implemented on site. Maintained index records of construction, drawings and various construction documents. Reviewed and evaluated all request for change order and payments prior to the approval of the owner. Prepared punchlist of construction defects, issue these to the concerned contractor for coordination and setting of deadlines when this defects are to be rectified. Conducted final inspection of the works and have all final punchlist are done the prior to turnover and acceptance of the project.

Time Spend : 13 Months

Project Cost : 30M

43- Sites The New Communication Navigation and Surveillance / Air Traffic Control Management (ATM/CNS) System Development projects.DOTC/CAAP.

Location : Philippines

Period : Oct. 2013 – Sept. 2015

Position : Deputy Project Manager

Duties Rendered : Oversee the contractors responsibilities and ensuring that the works are being executed in accordance with the contract requirements. Reviewed all the submittals required under the construction contract, that include the materials and shop drawings for approval, insurance, various Requests for Information (RFI), etc. and submitted the same to the concerned persons designer or owner for approvals. Implemented the quality management systems and procedures being adopted on site. Attended coordination meetings with the owner, contractors, architects, design engineers and other consultants. Regularly reviewed the construction program submitted by the contractor based on his weekly accomplishment target. Conducted daily inspection of all ongoing works and issued inspection reports to the owner and inform the concerned contractors if non-complying items works are being implemented on site. Maintained index records of construction, drawings and various construction documents. Reviewed and evaluated all request for change order and payments prior to the approval of the owner. Prepared punchlist of construction defects, issue these to the concerned contractor for coordination and setting of deadlines when this defects are to be rectified. Conducted final inspection of the works and have all final punchlist are done the prior to turnover and acceptance of the project.

Time Spent : 12 months

Project Cost : 9 Billion

3-Storey Building La Felicidad Hotel, Vigan,- Head of Engineering Dept.; Alta Mira subdivision Earthworks/ Road Concreting/Concrete Drainage Canal; Repair and maintenance the business establishment Jollibee Vigan, Batac; Chooking Vigan, Batac, San Nicolas, Red Ribbon Vigan, Candon, San Fernando, Teppeng Beach Resorts Sinait, Ilocos Sur

Location : Philippines

Period : Mar. 2012 – July 2013

Position : Head of Engineering Department

Duties Rendered : Review the plan and specification. Review all program of work estimate and recommend for approval to the owner. Coordinate with our purchaser regarding specs approve materials to be purchase. Attend Coordination meeting with the store managers regarding the repair and maintenance. Weekly meeting with my technical staff, for the weekend pending work load and taken action is necessary and update the status progress of construction, And review the Quantity Estimates prepared by my support technical engineers for final approval. To review the plans and specifications and review the changes of the construction drawings for the impact of additive and deductive change order. Review the bid of contractors and make recommendation assessment to the higher ups for final approval. Attend weekly coordination meeting to update the progress status of project. Coordinate with our structural and architectural designer for any changes of the plan and clarification of RFI request for information by the contractor. Site daily inspection for better work progress during day and night construction specially safety precaution for zero accident up to completion the project. Report to President regarding the status of projects

Time Spent : 16 months

Project Cost : 2 Billion

6-Storey Building, Dian Place

Location : Dian Street, Makati, Philippines

Period : July 2011 – Mar. 2012

Position : Project Manager

Duties Rendered : Weekly meeting with my technical staff, for the weekend pending work load and taken action is necessary and update the status progress of construction, and review the Quantity Estimates prepared by my support technical engineers for final approval. To review the plans and specifications and review the changes of the construction drawings for the impact of additive and deductive change order. Review the bid of contractors and make recommendation assessment to the higher ups for final approval. Attend weekly coordination meeting to update the progress status of project. Coordinate with our structural and architectural designer for any changes of the plan and clarification of RFI request for information by the contractor. Site daily inspection for better work progress during day and night construction specially safety precaution for zero accident up to completion of the project. Report to President regarding the status of project

Time Spent : 9 months

Project Cost : 40M

22-Storey Building Project in Celadon Park

Location : San Lazaro, Manila, Philippines

Period : Sep. 2010 – June 2011

Position : Project Manager

Duties Rendered : Over all in charge of the project.

Time Spent : 9 months

Project Cost : 120M

Construction of Weno Road and Utilities Project

Location : Palikir, Pohnpei State of Micronesia

Period : Mar. 2009 – July 2010

Position : Resident Engineer/Contracting Officer

Duties Rendered : Prepared a weekly report as per required PMU Director. Conducted weekly coordination meeting with contractor, sub-contractor and Public works Rep. Governor’s Office. Approved and recommend for payment billings of Contractor and Additional Variation Order & additive and deductive Variation Orders. Approval for the contractor shop drawings for construction and Materials Submittals based on Specification. Contractors Request for information (RFI) sent to designer for Clarification. Overall in-charge of the project as per contract schedule plan and specification. Attended meeting to the state Governors to update the progress of the project and discuss other issue regarding the right of way and other concern related to the project.

Time Spent : 16 months

Project Cost : 350 Million US Dollars

Federated Aviation Administration Construction of Yap International Airport, Aircraft Rescues & Fire-Fighting Facility (ARFF) Building

Location : Federated State of Micronesia

Period : Jan. 2008 – Feb. 2009

Position : Project Manager

Duties Rendered : Direct responsibilities to Project Director. Overall in charge of the project. Responsible for execution of the project in accordance with the owner’s requirements, schedule, quality & budget. Responsible for setting up and implement company quality system in the project to meet the company quality objection. Preparation and overall implementation of the project management plan, project safety and health management system. Liaised and negotiated with the owner, government authorities engineer, subcontractor on the other issue related to the project. Established good working relationship with those parties to insure the successful completion of the project. Defined rules and responsibilities of the project personnel as and when required to suit specific requirements and establish guidelines for subordinates for site activities. Reviewed progress of the project against the schedule and take remedial and preventive action to ensure that the project key dates are met. Attended progress meeting, Technical meeting, coordination meeting and chair monthly safety meeting. Established and monitored the project cost control system. Ensured timely submission of progress payment certificate to the (consultant) and owner. Handled owners complaints in an effective manner and solve disputes and conflicts. Ensured timely submission of extension of time and other project claims. Ensured proper hand over of the project to the owner at the end of project. Ensured handling over of all relevant documents and quality records at the end of the project for storage purpose in accordance with the quality procedure. Established and operated effective communication and reporting system with the branch office and other projects. Approved revision plan other documents issuance to the projects Staff and sub contractor for construction. Overall responsible for the public relations and associate issues.

Time Spent : 13 months

Project Cost : 35 Million US Dollars

Marquee Condominiums 40th, 47th Storey / AIC Empire Tower 38th Storey Building

Location : Makati City and Ortigas Center, Pasig City

Period : Jan. 2005 – Sept. 2007

Position : Project Manager

Duties Rendered : For Marquee Proj.: Consists of 3 condominium towers (1-47 storey & 2 of 40-storey) in Yakal, Makati. For AIC Proj.: Finishing works for the 38-storey office-condominium building in Ortigas Center.

Management, supervision and monitoring of the project activities from bidding, up to construction. Preparation of master schedules and budget costs, and maintain it updated, to ensure that the project is completed as scheduled, within the required quality and approved budget. Directing, coordinating and exercising functional authority for planning, organization, control, integration and completion of project. Exercised administrative control, over all personnel of the section in all matters pertaining to work performance, attendance, discipline and enforcement of company rules & regulations. Coordinated & supervised the construction of different items of works, including sub-contractors to ensure that the works are being done in the most efficient ways and in accordance with the approved plans & specifications and the required quality. Prepared documents for securing building permits. Conducted weekly coordination meeting with the contractors and workers to ensure that the safety measures are being followed. Conducted weekly coordination meeting with the contractors to discuss management and technical matters affecting the construction works. Prepared the weekly accomplishment and status report of the project and submit the same to the Sr. Project Manager. Reviewed, evaluated and recommended for payment the accomplishment of contractors, sub-contractors. Reviewed, and recommended for payment the payroll of direct hired workers

Time Spent : 23 months

Project Cost : 245 Million pesos

Department of Education Culture and Sports Construction of School buildings Region 1,2,3,4, Car projects under EDFITAF, ULTRA PASIG CITY.

Location : Department of Education Culture and Sport, Ultra, Pasig

Period : Oct. 2001 –Dec. 2004

Position : ENGINEER III

Duties Rendered : Management and supervision of all the construction activities for the project under contract. Liaison with the government authority regarding the relocations of utilities, such as water lines, and power lines that are affected by the on-going construction. Implemented the quality management systems and procedures being adopted on site. Attended coordination meetings with the, architects, design engineers and other consultants, SITE INSPECTION ALL ON GOING PROJECTS

Time Spend : 50 months

Projects Cost : 4 Billion pesos

Kuala Lumpur International Airport UT01 & UT07 Infrastructure & Utilities Package (Roads, Taxiway, Administration Building, Control Tower, Water Line & Sewer Line, Power 11KvA, 33KvA, &Fiber Optic Telecom Lines)

Location : SHED MOHAMMAD, HOOI AND BENNIE SDN.BHD. Kuala Lumpur, Malaysia

Period : Aug. 1999 – Sept. 2001

Position : Resident Engineer

Duties Rendered : Oversee the contractors responsibilities and ensuring that the works are being executed in accordance with the contract requirements. Reviewed all the submittals required under the construction contract, that include the materials and shop drawings for approval, insurance, various Requests for Information (RFI), etc. and submitted the same to the concerned persons designer or owner for approvals. Implemented the quality management systems and procedures being adopted on site. Attended coordination meetings with the owner, contractors, architects, design engineers and other consultants. Regularly reviewed the construction program submitted by the contractor based on his weekly accomplishment target. Conducted daily inspection of all ongoing works and issued inspection reports to the owner and inform the concerned contractors if non-complying items works are being implemented on site. Maintained index records of construction, drawings and various construction documents. Reviewed and evaluated all request for change order and payments prior to the approval of the owner. Prepared punchlist of construction defects, issue these to the concerned contractor for coordination and setting of deadlines when this defects are to be rectified. Conducted final inspection of the works and have all final punchlist are done the prior to turnover and acceptance of the project.

Time Spent : 25 months

Project Cost : 6 Billion Ringgit

Kuala Lumpur International Airport – UT01 Infrastructure & Utilities Package (Bored Piling Works, Underground Road Tunnel, Roads & Bridges, & Drainage Works)

Location : AAY& TRC JOINT VENTURE Kuala Lumpur, Malaysia

Period : Aug. 1997 – July 1999

Position : Project Manager

Duties Rendered :

Management and supervision of all the construction activities for the project under contract. Liaison with the government authority regarding the relocations of utilities, such as water lines, and power lines that are affected by the on-going construction. Implemented the quality management systems and procedures being adopted on site. Attended coordination meetings with the, architects, design engineers and other consultants. Conducted weekly meeting with the staff regarding the construction schedule and site management. Prepared the daily and weekly schedule of works to be done based on the overall contract schedule. Prepared the estimates and claims for variation orders to be submitted to the main contractor. Evaluated the bids of sub-contractors that will be used for the other construction packages. Conducted daily inspection of all ongoing works and see to it that the works are done in accordance with the approved plans and specifications. Prepared the weekly and monthly accomplishment reports to be submitted to the main contractor. Prepared the detailed monthly billings for submittal to the main contractor.

Time Spent : 32 months

Project Cost : 2.7 Billion Ringgit

Construction of Hyatt Hotel Duta / Construction of Petronas Twin Towers

Location : Pilecon Engineering Bhd.Kuala Lumpur, Malaysia

Period : Jan. 1995 – July 1997

Position : Sr. Site Engineer

Duties Rendered : Directly in-charge of the day to day construction activities. Conducted final inspection of the area to be concreted prior to the preparation of the concrete pouring request for approval of the construction manager. Prepared the weekly and monthly work program based on the master contract schedule. Reviewed and approved the request for construction supplies and materials to be delivered on site. Presided the coordination meeting with the sub-contractors to discuss the daily activities and target accomplishment. Reviewed and evaluated the accomplishment and billings of sub-contractors, and recommend the same for payment. Reported to the Sr. Project Manager any faulty works by the subcontractor. Attend weekly coordination meeting with the consultant for the progress of the work on site. Prepared site dairy for our daily bases submitted to consultant.

Time Spent : 30 months

Project Cost : 3.7 Billion Ringgit

Construction of 3-storey Shopping Mall with 1 Basement / Communication Tower / Various Residential Buildings / Roads Asphalt and Concrete Works / Drainage Works/Fences

Location : RAK ARABIA COMPANY (RAC)Dammam, Kingdom of Saudi Arabia

Period : Jan. 1991 – Dec. 1994

Position : Sr. Project Engineer

Duties Rendered : Directly in-charge of the day to day construction activities, from the laying out of the project limits until the project completion. Attended meetings with the owner and the consultants regarding the progress of works and safety measures being implemented. Prepared the weekly and monthly progress report for approval of the project manager. Prepared monthly progress billings. Assist the project manager in the preparation of claims for various variation orders.

Time Spent : 47 Months

Project Cost : 120 Billion Saudi Riyal

Construction of 3-storey Shopping Mall with 1 Basement / Various Residential Buildings / Road & Drainage Works / Two Hospitals with Communication Towers on Top

Location : ABDULLA RASHID DOSSARY and Partner Co. Khobar, Kingdom of Saudi Arabia

Period : Oct. 1985 – Dec. 1990

Position : Sr. Project Engineer

Duties Rendered : Directly in-charge of the day to day construction activities, from the laying out of the project limits until the project completion. Attended meetings with the owner and the consultants regarding the progress of works and safety measures being implemented. Prepared the weekly and monthly progress report for approval of the project manager. Prepared monthly progress billings. Assisted the project manager in the preparation of claims for various variation orders.

Time Spent : 60 Months

Project Cost : 150 Billion Saudi Riyal

ROAD,BRIDGES, DRAINAGE CONSTRUCTION –TAGAYTAY TO LEMERY BATANGAS

Location : IPI Engineering Consultant, Makati City

Period : Sept. 1983 – August 1985

Position : Project Road/Bridge Engineer Inspector

Duties Rendered : Oversee the contractors responsibilities and ensuring that the works are being executed in accordance with the contract requirements. Reviewed all the submittals required under the construction contract, that include the materials and shop drawings for approval, insurance, various Requests for Information (RFI), etc. and submitted the same to the concerned persons designer or owner for approvals. Implemented the quality management systems and procedures being adopted on site. Attended coordination meetings with the owner, contractors, architects, design engineers and other consultants. Regularly reviewed the construction program submitted by the contractor based on his weekly accomplishment target. Conducted daily inspection of all ongoing works and issued inspection reports to the owner and inform the concerned contractors if non-complying items works are being implemented on site. Maintained index records of construction, drawings and various construction documents. Reviewed and evaluated all request for change order and payments prior to the approval of the owner. Prepared punchlist of construction defects, issue these to the concerned contractor for coordination and setting of deadlines when this defects are to be rectified. Conducted final inspection of the works and have all final punchlist are done the prior to turnover and acceptance of the project.

Time Spend : 34 Months

Project Cost : 2.5B

Construction of Ten Storey Commercial Bldg., Seven Storey Condominium Bldg., & Four-Storey Apartment Building

Location : DAI-CHE Realty joint Venture, Mandaluyong City

Period : Jan. 1981 – Sept. 1983

Position : Project Engineer

Duties Rendered : Review of plans and drawings prepared by the designer. Preparation of detailed quantity and costs estimates for approval of the general manager & the owner. Assisted in the preparation of the master schedule of the project to be implemented. Prepared the various documents necessary to secure building permits. Coordinated & supervised the different construction activities on site, and see to it that the works being implemented are in accordance with the approved plans and specifications. Attended meetings with the owner and the consultants regarding the progress of works and safety measures being implemented. Prepared the weekly and monthly progress report for approval of the project manager. Advised the owner and consultants when the project is ready for final inspection or turnover.

Time Spent : 33 Months

Project Cost : 5M

CERTIFICATION:

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications, and my experience.

RUBEN B. SANTIAGO

Applicant

093********

August 24, 2018



Contact this candidate