Rabih M. Samarji
ربيع محمود سمرجي
Senior Architect Engineer
Lebanese, +16 years of experience
Objectives
Ready to demonstrate my capabilities for success and able to communicate at all Levels within proper management, and looking forward to gain more experience to reach an utmost professional level.
Contact Details
Tripoli – Lebanon
***********@*******.***
**************@*****.***
linkedin.com/in/rabihsamarji
Personal Data
DOB: 30 Oct, 1977
POB: Tripoli-Lebanon
March 2018 IELTS International English Language Testing System – Band 7
June 2002 Certificate of participation in design (Rehabilitation of Tyr Coast)
Marital status:
Married with two kids
Hobbies
Music
Reading
Educational Qualification
1997-2003Bachelor degree in Architectural Engineering from Beirut Arab University
1995-1996 Experimental Science (Lebanese Bac II) Tripoli Evangelical School.
Language Skills
Language
Speaking
Writing
Arabic
Native
Excellent
English
Excellent
Excellent
French
Basic
Basic
Romanian
Basic
Basic
Computer Skills
Operating systems
MS Windows
Desktop Applications
MS Word
MS Excel
MS Access
MS PowerPoint
MS Outlook
Adobe Acrobat DC
Graphic & Visual
Adobe Photoshop CS6
Adobe Illustrator CS6
3D Studio Max
Drafting Software
AutoCAD 2D
AutoCAD 3D
Personal and Technical Skills
Senior Architect with over 16 years of work experience, within the contracting/consulting field.
Dynamic and Ambitious person.
Gained diverse knowledge within Previous Consulting/Contracting companies.
Self-motivated, energetic individual.
Advanced Knowledge of: AutoCAD, Microsoft Office, Adobe, and other graphics communication programs.
Attention to detail and excellent problem-solving skills.
Skilled communicator and coordinator with all other Trades, and Related Specialties.
Team Leader Reflecting a Comfortable Supportive Working Atmosphere.
Managerial and Interpersonal Skills
Ability to manage individuals, groups and teams in order to achieve short-term & long-term tasks.
Ability to evaluate individual work performance and advised on career development.
Ability to deploy and develop plans, procedures & workflows.
Strong presentation and interpersonal skills.
Awards
June 2002 Certificate of participation in design (Rehabilitation of Tyr Coast)
Work Experience
NKY Engineering & Constructing Comp
May 2015 - Present
Senior Architect / Landscape Team Leader
NKY Architects & Engineers
Apr 2016 – Apr 2019
Riyadh –KSA
Project: (KAP2) King Abdullah Bin Abdul-Aziz Project-Phase 2
Project Scope: 94 sites All over the Kingdom, KSA
Client: MOI – Ministry of Interior
Responsibilities:
Follow up the Design and Shop drawings phase (Training Cities, Emergency Camps, Medical centers, Housing sites, and Institutes “Civil defense, Passport, and Drug Institutes).
Making sure that the project is being as per standards, codes, and complying with contractual documents.
Reviewing material submittals and assuring compliance with the project specifications.
Studying all External Light poles and lighting fixtures distributions.
Replying to all sites’ requests for information and being totally involved in problem solving.
Reviewing Site grading including hardscape and softscape leveling.
Participating in weekly and Monthly coordination meetings.
Making sure that the project is being as per standards, codes, and complying with contractual documents.
Gulf I & Reinsurance Brokers Co. (GIB)
July 2013 – January 2015
Saudi Oger Ltd.
Landscape Section Head
30/03/2013 – 30/03/2016
Senior Architect
29/05/2008 – 30/03/2013
Riyadh-KSA
Project
Scope
PNU
Princess Noura University, Riyadh
2008-2009
1,000, 000 m2
BOQ
Architectural Drawings
Engineering coordination
KACWC
King Abdullah Cultural World Center, Dhahran,
2009-2010
4,000, 000 m2
Material Finishes
Architectural Drawings
Engineering coordination
King Abdullah Projects-Phase Phase 1&2
All over the Kingdom
2010-2012
KAP 01
(305 Sites)
KAP 02
(23 Sites)
Site Adaptation and Development
KAFD
King Abdullah Financial District, Riyadh
2012-2013
Wyndham Grand Hotel
Landscape (Hardscape)
Softscape
Package: Plans, Details, Green Wall, and Plant List) - Execution Drawings. 2015
SANG
Saudi National Guard
2014-2015
Material Finishes
Architectural Drawings
Engineering
Design Criteria for landscape, external areas, and paved walkways.
Studying the Spine, Neighborhoods, Districts, and Clusters plan layouts.
Reviewing areas for levelling and visual impact on the street signs with the trees locations.
Preparing Traffic signage and road marking drawings.
Preparing external softscape layouts for plantation and paved areas.
Studying vehicular and pedestrian circulation to provide access ramps and parking lots.
KAP 01
King Abdullah Projects
Phase 1
2012-2014
KAP 01
(305 Sites)
Site Adaptation (Master Plan Layouts)
Building Development
Signage
Road Markings
Soft & Hard Scape Package
MOE
Ministry of Education
2013-2014
Site Adaptation
Building Development
Execution Drawings
Prince Faisal Bin Bandar private Police Quarter
2013
BOQ
Landscape Drawings
Landscaping 2015
HRH Prince Khaled Bin Salman private Residence
2015
BOQ
Landscape
Drawings
Landscaping 2015
Private projects as Zen Gardens and outdoor Landscaping in Royal Palaces.
2016
Preliminary Concept preparation
Design Drawings preparation
Shop Drawings preparation
Responsibilities:
Preparation of tender, Design and Execution-Shop drawings
Cross checking BOQ's, Tender Documents, and Specifications.
Solving technical problems
Coordinating with various trades: (Structural / HVAC / Plumbing / High-Low Current / Architectural / External Services and Networks)
Ensuring to have all Projects in Hand, submitted on Time as per scheduled.
Emphasizing all the used Information is being as per Codes, Standards and complying with the Client’s requests.
Supporting and Coordinating with Oger Philippines & Oger International (France) for all Received Packages for Correction and Checkup
Attending Meetings and Workshops with the Consultants and client's representatives.
Monitoring and reporting progress of work
Raising RFI's for complicated technical issues
Design and development of buildings and Site Adaptation layouts (Master Plan Layouts).
Dealing with external works (Buildings, fences, gates, guard rooms, road blockers, barriers, parking layout, tanks' locations, SCECO, etc Signage, and softscape/hardscape)
Complying property limits to survey and as Built files
Using UTM coordinates for locating projects Based on the WGS84 Datum
Implementing leveling studies for site layouts for rain water surface discharge
Producing grading plans for master plan layouts by connecting to the existing road levels.
Architect
Downtown – Beirut
25/03/2007 – 01/05/2008
Riyadh-KSA
Project:
Down Town Markets Of Beirut – Hard scape (Walkways/elevations), Execution Shop Drawings (external tiling layout).
Architect
01/05/2005 – 23/03/2007
Bucharest – Romania
Projects:
Turturele -Residential Projects, (Two Blocks, 95 apt.)
Hotel Odei, (250 rooms), Bucharest
Aerogeri Residential Buildings, (Two Blocks, 95 apt.)
Sisest Villa Complex, (90 Vilas)
Architect / Interior Designer
Beruit – Lebanon
01/04/2004 – 01/04/2005
Projects:
Metropolitan City Center five stars Hotel, Sin-El Fil, Beirut, Lebanon
Architect / Interior Designer
20/12/2003 – 20/03/2004
Abu Dhabi – UAE
Projects:
Metropolitan Abu Dhabi Conference Palace Hotel (Second 7 stars hotel in the world rulers Package), Abu Dhabi UAE 850,000 sqm.
References
Arch. Adel Koleilat
Senior Architect-Beirut
Project Manager-EMAAR
Eng. Hasan Eissa
Civil Engineer
Head of Planning Department
Eng. Chadi Chehade
Infra Structure Senior Engineer
Head Of Infrastructure Department
Eng. Mohamed Al-Ghobashy
Civil Engineer
Senior Q.S
Other references for each job could be available upon request