Resume

Sign in

Electrical Engineer Project

Location:
Gurgaon, Haryana, India
Posted:
June 08, 2019

Contact this candidate

Resume:

Career Summary

I am a Registered Electrical Engineer with a twelve plus years of experience in Electrical Engineering and Project Management with a proven track records in construction industry both contracting and consultant . A very good team player with analytical thinking and ability. Such projects handled include International Airport, High-rise buildings, infrastructure, High Voltage, Medium voltage, low voltage, automation, and Government & commercial buildings and familiar with international codes and standards.

Position Applied: ELECTRICAL ENGINEER

Professional Experiences

1) Reviews of shop drawings related and ensure its compliance with designs, contract requirement and properly coordinated with other discipline. 2) Analysing Material submittal for approval in accordance with all requirements of project technical specification.

3) Review equipment selection including, transformers, switchgear, distribution panel boards, cabling and termination units for power and lighting loads, Data & Telephone System, Closed Circuit Television, Fire Alarm & Fire Protection, Public Address System, Access Control System, Master Clock System, CUPPS and CUSS, Airport information display system, Baggage Handling System, signage, Passenger Boarding bridge, Distributed Antenna System, Trunk mobile radio system, HVAC, Smoke Management System, Pressurized stair Case, BMS Irrigation System, Landscaping, Water Treatment Plant, Sewage Treatment Plan. 4) Review all procedures of testing and commissioning performed by the Contractor. 5) Review and evaluate contractor’s monthly progress through all our Site Area Managers and report to the area manager.

6) Evaluating & approving Electrical inspector work for day-by-day inspecting of material delivered onsite/stockyard according to MIR (Material inspection request) provided by the contractor in compliance to the approved material by the designer/client.

7) Review & approving Electrical inspector works for day-to-day inspecting of Electrical work according to IR (inspection request) provided by contractor. 8) Review and initial monthly invoices related to my discipline. 9) Ensures that all the works done are in accordance with the approved electrical drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards. 10) Issuing SWI’s (site work instruction) and NCR’s (Non-Conformity Report) for any discrepancy in quality of installations.

11) Confident in viewing contractors work method of statement and material submittals.

12) Ensure quality of work complies with contract requirements, good practice and only approved materials are used.

13) Make sure that all site inspections are carried out as per intervention points marked in the approved Inspection and Test Plan.

Name : Syed Nivas Syed Ibrahim

Address : Pune

Contact no : +916*********

Email Id : ac9j4d@r.postjobfree.com

14) Attend weekly meetings as directed by Project Manager. 15) Attend all activities on site and ensure their compliance with QA/QC procedure in respect of the format signed off by Contractor’s QA/QC Manager. Feb 2018 to Till Now

Electrical Engineer

Egis India Pvt Ltd

Pune

India

Web site: www.egis-india.com

Project : PMC concept to commissioning for New Integrated Terminal Building Pune Airport, Pune. An estimated cost of Rs 382.97 Crores USD 5.5 Million The objective of this project is to deliver a world class passenger terminal building and associated infrastructure which has the following components: New terminal building area to be constructed is (35000+7000) = 42000 sqm. Centrally air-conditioned integrated terminal Building. The designed peak hour shall be 600 International passengers and 1700 Domestic passengers for an integrated passenger terminal building area of 57300 sqm as per IMG Norms, 3,000 Sqm of retail area. The Green Building concept shall be adopted to achieve GRIHA 4 Star rating, Solar Power Generation Viz. Solar Power lighting, Solar Roofing System, Sub- station internal & External Electrical, UPS, HSD System, and ELV system etc.. Maintenance Friendly roofing and building façade system Egis will provide services from concept to commissioning i.e. design the passenger terminal concept, prepare tender documents, assist Airport Authority of India in selection of contractor and carry out construction project management and supervision.

March 2011 – November 2017

Electrical Engineer

Dar-Al Riyadh

Rafha

KSA

Web site: www.Daralriyadh.com

Project: King Abdullah Financial District (KAFD).

Project from April 2014 to November 2017

Actual Value: 14. bn US $ and total built up area: around 1,977,611 in’ Scope of work: Construction supervision of the 46 towers of the King Abdullah Financial District. Situated in the Asahafa area of Riyadh, The King Abdullah Financial District (KAFD) is one of the largest construction sites anywhere in the world. This development is being undertaken by the Riyadh Investment Corporation, the investment arm of the Pension Authority of Saudi Arabia, and will include fifty- nine high-rise towers for both residential and commercial occupation. This self- contained 1.6 million square meter district will house retail, entertainment and hospitality offerings as well as 62,000 parking spaces, all surrounded by lush, landscaped public open spaces all serviced by an ultramodern light rail link. Project: MOI integrated strategic project (ISP)–

KAP0 from March 2011 to April 2014

Actual Value: 4.3 bn SR USD 1.14billon

Integrated strategic (ISP) is one of the most prestigious projects for Ministry of Interior. This project will be undertaken on different sites all over the Kingdom of Saudi Arabia. The project will provide more than 574,000 sq.m of built up area on 900,000 sq.m of developed areas. Cost of the project is around 4,300,000,000 SR.ISP consists of 182 buildings, 142 of which are considered ‘small buildings’ such as Regional Police Station, Civil Defense Building, Police Station, High Way Security Centre etc. The buildings construction values varies between 15 million and 45 million. The remaining 42 buildings are considered medium to large and include Administration building, Governorate Building, Attorney Building, Drug enforcement building etc.

Consultant Electrical engineer (Dar al-Riyadh) for Makkah and Najran Area (KAP 0)

ISP - ministry of interior (MOI), Projects:

1- Area Command of Border Guard (Najran Area 2110). 2- District Police Directorate (Najran Area 1010). 3- Governorate building category A-3 (Makkah Area 3030) 4- Drug enforcement administration (Makkah area 1150). 5- Civil defence center (Makkah area 2070).

6- Central defence section (Makkah area 2060).

7- Highway patrol dispatch center (Makkah area1100). 8- Security patrol dispatch center (Makkah area1100A). 9- External police department (Makkah area 1080)

Aug 2009 – Feb. 2011 Site Electrical Engineer

Al-Najdain East for Contracting

Company Riyadh, KSA

Project: High Rising and Commercial.

Web site:http://alnajdainest.com

The scope of work included all Electro-Mechanical activities such as Power House, transformer, medium voltage, low voltage Chillers, Lighting System and Power Distribution, Fire Alarm System, MATV system, CCTV system Data/Telephone system, Access Control system, Public address System, portable water Supply, irrigation system, Water treatment plant, Drainage and Storm Water, HVAC, Chilled Water System, Split AC, Fire Fighting System, 12 Elevators and BMS. Roles and Responsibilities:

a) Installed and Tested systems are Earthing system, Lightning system, Lighting system, Power outlets,Main Distribution panel(MDP),Emergency Main Distribution Panel(EMDP) and Sub-Panel Boards.

b) Installed and tested system are fire alarm system, DATA/Telephone system, Clock System, Public Address System, Centralized CCTV System and MATV System, Access Control System, Master Clock System, Security System and B.M.S, Elevators

c) Smoke Management System, Pressurized stair Case, Water Treatment System, Portable Water System, Irrigation System, Chiller units, Fire Fighting System and related interface with required systems.

d) Installation of Package substation it consists of Ring Main Unit(RMU), Distribution transformer(500 KVA,1000 KVA),and Low voltage distribution panel.

e) Installation and testing of SF6 (Sulfur Hexafluoride) circuit breaker. f) Continually find solutions to conflicts

structural/architectural/mechanical/electrical drawings and specifications by conferring with the Consultants.

g) Installation of sewage line, portable line, irrigation line and firefighting system. h) As a member of the Project Site Team, my duties include being able to perform layout work competently, accurately and efficiently i) Coordinate inspections with consultants and authorities as required by the contract.

j) Submit SCR (site clarification request) to Consultant if it needed. k) Monitor installation of all electrical Systems According to the latest revision of IFC drawings or Shop Drawings.

l) Assist Project Superintendent by enforcing quality control, expediting subcontractors

m) Continually update drawings with changes as issued by Consultants n) Review shop drawings for conformance with the contract and ensure information is communicated to Foreman and Superintendent o) Management all subcontractors and following up implementations. p) Inspect and test all material submitted by all subcontractors to be comply with the specification of the project

q) Present oneself as a candidate for promotion by learning and understanding construction methods and developing good construction management skill. Company Address: Riyadh

Sep 2008 – May. 2009 Electrical Engineer

Terminal 3

Siemens Dimatic Middle East LLC

Dubai,UAE

Web site: www.siemens.com

Roles and Responsibilities:

a) Making program Siemens 300 serious Modules, SCADA, and HMI b) Maintenances Siemens PLC, SCADA, HMI, Servo Motor, variable Frequency Drives, Inverter, PID Controller, Encoder, Relay, Sensors and Circuit Breakers. c) Electrical Supervision of Testing and Commissioning. d) Preparation of work history sheets according to site condition, type of work and materials involved.

e) Daily work schedule and instructions give to Site Electrical Supervisor. f) Updates SAP with actual Man power for each work request executed by the Reliability Supervisor and Technicians.

g) Preparing of reports and sending recommendations to Reliability Senior Engineer Project.

h) Punch List Clearing and Line Checking.

i) Maintaining Manpower Shift duties.

j) Preparation of Bill of Materials.

k) Involved in the Work of Quality Assurance/Quality Control Engineering. l) Maintaining of Safety and Quality aspects.

Company: Umm Hurair Road, Dubai

June 2007 – Aug. 2008 Design Site Engineer

Dowa High Temp Furnace Ltd, (India)

Bangalore, India.

Web site: http://www.hightemp-furnaces.com

Roles and Responsibilities:

a) In the field of industrial Automation which includes programming, testing, Commissioning, and servicing responsibilities.

b) Hardware configuration and programming of PLC systems: Siemens S6- series,Mitsubishi PLC and LG PLC(XG5000 SERIES,MASTER K120 SRIES) c) Programming of SCADA systems: (MOVICON, I conics and Spec view- Honeywell) and Wide practical experience with communication protocols MODBUS SERIAL, MODBUS TCP/IP, Profibus and Ethernet.

d) Hardware configuration and programming of HMI systems REDLION (G304, G306, G308, G310) and Proface HMI.

e) Preparation of I/O List, Flow Chart, Sequence of operation, Project schedule, Ladder Logic and panel testing

f) Preparation of Project Report and Documentation. g) Designing Electrical diagram with using AutoCAD. h) Drives Programming and Various Braking Method.

i) Support for PC hardware and software. Knowledge of operating systems: Windows NT/2000/XP, Windows95/98 & Vista

j) Maintaining of Safety and Quality aspects.

Company: 1C, 2nd phase Peenya Industrial Area Bangalore, June 2006 – May. 2007 Assistant Electrical Engineer Sand Fits Unit II

Coimbatore, India

Roles and Responsibilities:

a) Installing and Testing systems are Earthing system, Lightning system, Lighting system, Power outlets, Main Distribution panel(MDP),Emergency Main Distribution Panel(EMDP) and Sub-Panel Boards. b) Installation and testing of 3 numbers 11KV/440V substation compressing of 1000KVA Transformer substations.

c) Installation and testing of 3 number Vacuum Circuit breaker, and 2 number of Air Circuit breaker.

d) Installation and testing of MV cable and Low voltage cable in entire plant. e) Planning and execution of scheduled Preparation like maintenance programs scheduled preparation, Erection team preparation, Commissioning team preparation, Material purchases list preparation.

f) Responsibility included but not limited to the overall Electrical and Electronics maintenances of the plant 66/11KV Transformers and substation, Inter locking system, motor from 0.1 hp to 400hp, Eddy Current and VFD (variable Frequency drivers), induction motors, Diesel generator, Relays etc... g) Monitoring the QA/QC Documentation of the subcontractors and ensure that all the activities are incorporated to their system on daily basis and can be traced according to our requirement, and also reviewing radiographic films. h) Supervision and Implementation of maintenances and Erection. i) Responsible for the maintenances PLC and HMI.

j) Maintaining Manpower Shift Duties.

k) Preparation of Bill of Materials.

l) Maintaining of Safety and Quality aspects.

EDUCATION

April 2006 Anna university,

M.Kumarasamy Collage of Engineering, Karur city, India. Bachelor of Engineering in Electrical and Electronics Engineering Registered Electrical Engineer

Indian Govt.Lr.no4689/09

May 2004 Variable large scale integration

Brain in Chip Technologies

Coimbatore city, India.

May 2007 PLC/SCADA/MMI

Arris-Vashist Institute for industrial automation

Coimbatore City, India.

Personal Information

Father’s Name :M. Syed Ibrahim.

Date of Birth :04-07-1984.

Nationality :Indian.

Marital Status :Married.

Passport No :R8230211.

Languages Known :English, Arabic, Urdu, Hindi and Tamil. I hereby certify that the above facts are true and correct to the best of my knowledge and belief

Syed Nivas.S

Applicant



Contact this candidate