Post Job Free
Sign in

Maintenance Technician Power Plant

Location:
Las Vegas, NV
Posted:
May 31, 2019

Contact this candidate

Resume:

Work Experience

Aircraft Maintenance Technician, Allegiant Travel Airlines

Las Vegas, NV

April 2016 - February 2019

MD80, B757 & Airbus 319 & 320 Experience; Airbus Run and Taxi qualified technician with clear understanding of Company information systems, Electronic Maintenance Manuals, Maintenance instructions. Used to comply with Engineering Orders, AD's, Task cards, etc. always emphasizing on safety and quality; OJT training qualified & always looking for new knowledge and training for personal development and performance. • All maintenance performed in accordance with company manuals and FAA regulations. • In regards to innovation and process improvement I have submitted and documented automation proposals as well as process improvements for the Reliability, Maintenance and Materials departments.

Reliability Analyst, Allegiant Travel Airlines

Las Vegas, NV

February 2014 - April 2016

Analyzed and evaluated all forms of data used to measure component, system, and aircraft performance for safety and economic impact as outlined in the Engineering Procedures Manual. • Serving as the primary focal point for data collection, analysis, research and reporting of the Boeing 757 fleet with respect to Maintenance program • Analyzed and evaluated post mechanical interruption reports (MIRs) and pilot reports (PIREPS). • Produced and compiled various reports to analyze and evaluate data and report findings and trends to Reliability management. • Build electronic presentations to include graphs, charts and data • Prepared and presented overview of statistical data as well as performance and analysis of trends and findings as required. Process improvements and automation documented with Reliability Manager. Examples (SDR electronic files batch for FAA submission and improvement project new tracking process).

Aircraft Maintenance Technician, Great Lakes Airlines

Denver, CO

May 2012 - February 2014

Performed preventive and corrective maintenance procedures as to Aircraft as well as trouble analyzed maintenance issues on Brasilia EMB120 aircraft; determined maintenance to be performed Utilizing proper parts, tools and test equipment in order to accomplish all scheduled and unscheduled maintenance; Used to follow tasks cards and Engineering Orders as required providing safe, reliable and on-time aircraft. • All maintenance in accordance with company manuals and accurate logbook sheet entries. • Ensured calibrated tools, test equipment or measuring devices being used are undamaged and have the proper calibration stickers. • Performed "OJT" training instructions, Completed shift turnover reports and performed aircraft run-up and taxi as well as towed aircraft. • Performed the duties of a lead mechanic when required, receiving inspection and tagged components properly.

Support Analyst, Bold Technologies LTD

Colorado Springs, CO

March 2010 - May 2012

Alarm monitoring software Development Company Application technical support, software analysis, test and implementation for US, Canada, Hawaii and Latin America. End user support and training for North America Alarm centrals.

Business Analyst / Purchasing Mgr, LEONI Wiring Systems

Tucson, AZ

October 2007 - March 2009

As a member of the IT support team I was responsible to support the business system network and applications. Developed reports, provided support, training and managed the Purchasing area and information system for 1.5 years bringing 60,000 usd savings every year driven from previous software replacement. Business Intelligence Server Administration, support and reporting, manufacturing systems analyst primary supporting implementation, test, documentation and support.

Manufacturing Systems Analyst / CAM Mgr, Motorola Inc

Nogales, Mexico

May 2004 - October 2007

CAM (Computer Assisted Manufacturing) Automation Supervisor Responsible for New projects, supporting automated controls for new production lines and interfaces between LCS (Line Control System) Applications and PLC equipment. Documented manufacturing processes and developed functional and design requirements documents, supported developers on the analysis, test, implementation and training of automation for production lines from start of process to packing.

Education

Redstone College

Associate degree

Apr 2009 - May 2011

Airframe and Power plant FAA Certificate.

Or expected graduation date. For high school, only provide a date if you have not yet graduated.

Nogales Institute of Technology Mexico

Bachelor degree in computer, Computer Science

Jun 1990 - May 1995

Computer Science / Software

Nogales Institute of Technology Mexico

High School, Minor in Electronics Technology

Jun 1985 - Jun 1987

Electronics Technician

Skills

Computer Skill

Expert

SQL

Intermediate

Computer Skill

SQL

Licenses and Certifications

A&P License

#3601587

Date Achieved: 10/11/2011

SQL Server 2008 Installation and Maintenance

Date Achieved: 02/01/2011

Renewal Date:

Hellerman Tyton Structured Cable installer

Date Achieved: 02/28/2001



Contact this candidate