SYED KHALEELULLA (B.Tech, Mechanical)
House. No.: 18-12-418/D1/63, Hafez Baba Nagar, Kanchanbagh, Hyderabad- 500058, Andhra Pradesh, India.
Mobile: +974- 70554436 Email: ******@*****.***
APPLICATION FOR THE POST - LEAD ENGINEER / PROJECT CO-ORDINATOR / CONST. MGR.
PROFESSIONAL SYNOPSIS
Over 15 years’ experience in Project Execution (Construction), Pre-commissioning & Commissioning of Piping / Pipeline systems, currently working with M/s. BlackCat Engineering & Construction Co. (EPIC), QATAR as “Senior Mechanical Engineer”. A proactive engineer looking forward to participate in the challenging field of Mechanical Industry and be a successful Engineer. Broadly Exploring views / knowledge, willing to work as a key player in a creative environment where there are opportunities for professional and personal growth.
Skills
Management of Construction Activities @ Mechanical / Pipeline & Piping works – Chemical, Bulk Drugs, & Oil & Gas Industries.
Pre-Commissioning & Commissioning of Pipeline & Piping Works.
SHUTDOWN job works
Structural & Equipment Erection works.
Co-ordination & execution of following specialized works:
oPigging, Intelligent Pigging (Caliper, MFL).
oPipeline Lowering works
oMicro-tunneling works
oThermal Metal Spraying
oShell & Tube Heat Exchanger - Nozzle Leak Seal clamp installation (Furmanite)
oHigh Pressure Water Jetting and IRIS inspection of FIN FAN cooler tube internals.
oFin Fan cooler – Internal Header Box - Plug welding
AutoCAD -2D & 2D Isometrics.
Knowledge of Primavera (P6).
Safety Exposure
SHELL - E-Vision ( Permit Requester & Permit Holder)
PTW (PERMIT TO WORK) training from various clients.
RLIC - eCPW Holder (Electronic Consolidated Permit to Work).
Attended Training on – Hazard Identification and Risk Assesment.
Attended Training on Construction Safety.
Attended Training on Environmental Complaince.
Affiliate Member of “WORLD SAFETY ORGANIZATION”.
ADDITIONAL TRAINING
Boroscopy Inspection
Siemens PLC programming
GEOGRAPHICAL AREAS OF WORK
QATAR, YEMEN, POLAND & INDIA
ORGANIZATIONAL EXPERIENCE
Blackcat Engg. & Const. Co., QATAR Senior Mech. Engineer from 10-03-11 to Till Date
Industry: EPC & M Co. - Petrochemical, Oil & Gas Industries
PROJECTS EXPERIENCE
1.PROJECT : HPC AIC PROJECT (UNIT SHUTDOWN PROJECT) ( CURRENT PROJECT)
FIN FAN COOLER – DE-PLUGGING, HIGH PRESSURE WATER JETTING, IRIS INSPECTION, TUBE CUTTING AND REMOVAL, HEADER BOX INTERNAL PLUG WELDING USING ORBITAL WELDING MACHINE.
DOUBLE BLOCK AND BLEED VALVE FABRICATION & INSTALLATION ON INLET & OUTLET LINE OF FIN FAN COOLER.
CLIENT : SHELL “ QSGTL”
POSITION : AREA ENGINEER (WITH DOOSAN BABCOCK)
2.PROJECT : EPIC OF CNG STATIONS AT RLIC AND MIC
CLIENT : QATAR PETROLEUM
SCOPE : CONSTRUCTION OF 8” X 13.6 KM PIPELINE, 2 CNG DELIVERY STATIONS,
STATION PIPING WORKS AND COMMISSIONING WORKS.
POSITION : LEAD MECHANICAL ENGINEER
3.PROJECT : CARBONYL PIPING REPLACEMENT PROJECT
(MAJOR TURNAROUND SHUTDOWN PROJECT)
CLIENT : SHELL “ QSGTL”
SCOPE : FABRICATION, CONSTRCUTION, INSTALLATION & DE-MOLITION OF
CARBONYL PIPING, WORK INVOLVES PIPING OF SIZE RANGING 36”, 30”,
24”, 16” HEAVY SCHEDULE PIPING WITH MAX. THICKNESS 48MM.
REACTOR PIPING RE-PLACEMENT
SINGLE SPOOL WITH MULTIPLE BRANCHES WEIGHING 24.0 TONNE, SHIFITNG THE SAME BY SPMT .
COMPLEX MANUAL LIFITNG (I.E. DEMOLITION & ERECTION OF 36” PIPESPOOLS FROM EXISITNG PIPERACK WITH NO CRANE ACCESS).
HEAT EXCHANGER – REPLACEMENT WORK
EXTERNAL THERMAL SPRAYING ON HEAT EXCHANGER
DIA 70” X 24” LEAK SEAL CLAMP INSTALLATION
POSITION : AREA ENGINEER (WITH DOOSAN BABCOCK)
4.PROJECT : ETHANE EXPORT PIPELINE PROJECT
CLIENT : SHELL “ QSGTL”
SCOPE : CONSTRCUTION & PRE-COMMISSIONING OF 2.5 KM PIPELINE.
POSITION : LEAD ENGINEER / DY. CONST. MANAGER
5.PROJECT : HELIUM 3 OSBL FACILITIES AND CONSTRUCTION OF HELIUM3
-RECOVERYFACILITIES (HELIUM 3 PROJECT)
CLIENT : RAS GAS (BARZAN) / CHIYODA ALMANA
SCOPE : INSTALLATION AND CONSTRUCTION OF NEW HELIUM FACILITIES AT
THE NORTH SIDE OF BARZAN FUTURE TRAIN 3 AT RAS LAFFAN.
(PIPING - 34500 INCH DIA, 1070 TONS OF STRUCTURE + EQUIPMENT ERECTION, CRYOGENIC AND SUPER CRYOGENIC)
POSITION : PROJECT ENGINEER
6.PROJECT : BLATCHFORD PRESTON COMPLEX – III, CONSTRUCTION WORKS
CLIENT : AMEC FOSTER WHEELER
SCOPE : MECHANICAL & ELECTRICAL WORKS AT BLATCHFORD PRESTON
COMPLEX
POSITION : CONSTRUCTION MANAGER/ LEAD MECHANICAL ENGINEER
7.PROJECT : EPIC OF SWEET FUEL GAS SUPPLY TO DUKHAN CONSUMERS
(WORKED FOR ~4 YRS.)
CLIENT : QATAR PETROLEUM, DUKHAN FIELDS
SCOPE : 59 KM PIPELINE PROJECT (18 PIPELINES) WITH 35 STATIONS & ITS
RESPECTIVE PIPING (PIPELINE DIA INVOLVED – 36”, 18”, 12”, 6”
& 4”) + 17.1 KM (ABANDONED PIPELINE DEMOLITION)
POSITION : SENIOR MECHANICAL ENGINEER
RESPONSIBILITY
Overall co-ordination & execution of pipeline construction activities.
Resource planning / arrangement and management.
Implementing and establishing execution plans for effective construction management.
INTERFACE management with various asset holders.
Co-ordination with subcontractors.
Co-ordination with client for work clearances and approvals.
Daily / Weekly progress updating and meetings with clients.
Co-ordination with inter departments for SIMOPS, Releases and requirements.
Co-ordination with planning for 3 week look ahead and work priorities.
Fabrication and Erection of Pipeline, Piping and Structural works as per ASME standards / Client
Specifications.
Hydro testing and Pre-commissioning (Drying, purging / Nitrogen Inerting) of Pipeline / Piping
Works.
Shutdown / Tie-in Works.
Piping / pipeline - Demolition works
Pipeline Installation works (PQR/WPS qualifications, Stringing, Main line / Tie-in welding works,
etc.).
Co-ordination & execution of Pigging works, Intelligent Pigging, and Mothballing of UG / AG –
Pipeline works
Pre-Commissioning and Commissioning of Pipeline / Piping works.
Major Plant shutdown – area incharge – execution and co-ordination of activities (fabrication,
construction, installation & de-molition of carbonyl piping, work involves piping of size ranging 36”, 30”, 24”, 16” heavy schedule piping with max. Thickness 48mm.
Single spool with multiple branches weighing 24.0 tonne, shifitng the same by SPMT .
Complex manual lifitng (i.e. demolition & erection of 36” pipespools from exisitng piperack with no crane access).
Heat exchanger – replacement work, External thermal spraying on heat exchanger
Dia 70” x 24” leak seal clamp installation
Unit shutdown – area incharge – execution and co-ordination of activities, for fIN fAN cOOLER – DE-PLUGGING, HIGH PRESSURE WATER JETTING, IRIS INSPECTION, TUBE CUTTING AND REMOVAL, HEADER BOX INTERNAL PLUG WELDING USING ORBITAL WELDING MACHINE.
DOUBLE BLOCK AND BLEED VALVE fabrication & INSTALLATION ON INLET & OUTLET LINE OF FIN FAN COOLER.
Co-ordination with QC dept. for Joints Coating Release, Pipeline Segment - Lowering Release, Trench Releases etc. for Front availability.
Co-Ordination & Execution of FBE Coating @ Girth weld joints.
Preparation of Pipeline Lowering Method Statement and getting approval from QP STI dept.
Execution of PIPELINE LOWERING with Side Booms.
Co-Ordination & Execution of MICRO-TUNNELING WORKS (TRENCH LESS CROSSING)
Punch List Close-out works.
Documentation works.
Responsible for Overall project – Piping Tie-in works
Weekly Meetings with Higher Ups for Progress / Problems / Support @ Site Requirement.
Preparation of Method Statements, JSA, and Critical Lifting Plans & Getting Approval from QP STI Dept.
Raising FEQ / SQ / TQ @ Engg. Dept. for any deviations / changes required.
Co-ordination with Fab. Shops / RT Yard & Painting yard for Spool Releases.
Hawk IFC, Yemen Mechanical Engineer from 14-05-10 to 04-01-2011
Industry: EPC Co. - Petrochemical, Oil & Gas Industries
PROJECTS EXPERIENCE
1.Project : Upstream Facility – CPU Phase II - Cryogenic Plant
Client : Yemen LNG
Consultant : SEPOC (Technip, CBI & GE)
RESPONSIBILITY
Site Planning & Execution of UG/ AG Piping.
Fabrication, Erection and Testing of entire piping. (CS, LTCS, GRE).
Raising (RIT- Request for Inspection & Testing) as per QC – ITP for various Inspections @ Piping.
Co-Ordination with Civil & QC for releases / Clearance – for Front Availability.
Co-ordination with Fab. Shops / RT Yard & Painting yard for Spool Releases.
Co-ordination with Material Dept. for Material Issuance @ Site Work.
Arrangement of Resources (Men/ Machine & Equipments) to Site Personnel for Execution of site Activities.
Weekly & Weekly Meetings with Higher Ups for Progress / Problems / Support @ Site Requirement.
Attending Weekly Meetings with Client.
Preparation & Execution of the Hydrostatic, Pneumatic, Service test of the Piping with respect to Test Packs.Pre-Commissioning of Piping Systems.
Targets Achievement.
To look after the FCR (Field Change Request) issued from site to amend the drawings and prepare the As-Built Drawings & also raising TQ’s (Technical Queries) for a change in the system.
Neela India Pvt. Ltd. Sr. Site Engineer from 03-03-06 to 30-04-10
INDUSTRY : Engineering & Construction Company - Providing services in Installation & Commissioning of Process piping, Utility Distribution Systems, Water Treatment Plants, Tanks & Reactors - Installation & Commissioning - Chemical, Bulk Drug & Pharmaceuticals Industries
RESPONSIBILITY
Site Planning & Execution (Implementing the project as per the Project Bar Chart) - ensuring safe work practices & quality at Job site.
Responsible for Overall safety of men, Machinery and Environment.
Mark up of all the Isometric drawings of piping and issue them for construction.
Co-Ordination & Organizing Equipments, Tools, Tackles & Consumable Materials at site.
Fabrication and Erection and Testing of entire piping as per AFC drawings.
Installation & Commissioning of MEDS & Pure Steam Generator Plant.
Raising the TQ’s (Technical Queries) for any change / correction required in the system with
Supporting documents.
Preparation of the Hydrostatic, Pneumatic, Service test packs for the entire piping of plant.
Co-Ordination of Material/ Preparation of MIS (Material Issue Slips) & Issuance to Site / Fabshop.
Co-Ordination of Spools Material/ Preparation of MIS (Material Issue Slips) & Issuance to Site / Fabshop.
Pre-Commissioning of Piping Systems (i.e. – Steam Blowing, Flushing & Passivation).
Installation & Commissioning of Water Treatment Plant (MGF, Softener, MCF & RO Plants).
Co-ordination with QC Dept. & Completion of Punch List for balance work or Hydo-Testing & Pre –
Commissioning Activities & Handing Over.
Providing inputs for CE certification of Equipments.
Project Documentation & Control - Daily, Weekly & Monthly reporting to the internal officials for day-to-day project progress, problems, solutions & optimization for achieving the targets.
PROJECTS EXPERIENCE
1.Client : EISAI (JAPAN)
Consultant : B.Mehtalia Consultants
Project : Turnkey Project: Installaton of MSGL Vessels, Process / Utility
Piping & Installation of Structures – FORMULATION BLOCK, API –
PILOT & API COMMERCIAL BLOCK
2.Client : Strides Arcolab, Bangalore
Project : Turnkey Project: Installaton & Commissioning of Modular Skids,
Heat Exchangers, Commissioning of Media Transfer System –
Media Vessels & Inst.panel & Process Piping & Structure
Errection works - STERILE PRODUCTION FACILITY
3.Client : Strides Arcolab, Polska (Daniezsewska, POLAND)
Consultant : CSV, Italy
Project : Process Piping, Tanks, Reactors, Water Treatment, MEDS & PSG -
Installation & Commissioning
Nishotech Systems.BE Pvt. Ltd. Site Engineer from 13.12.03 to 28.02.06
Industry: Construction Co. providing services in Installation of Process piping, Utility Distribution Systems, Water Treatment Plants - Installation & Commissioning – Chemical, Bulk Drug & Pharmaceuticals Industries
RESPONSIBILITY
Site Planning & Execution (Implementing the project as per the Project Bar Chart) - ensuring safe work practices & quality at Job site.
Responsible for Overall safety of men, Machinery and Environment.
Developing piping Isometric drawings from General Arrangement drawings as per designing cell of client.
Preparing MODIFICATION DRAWINGS (As Built).
RATE ANALYSIS for Modification (AS BUILT) works of Piping.
Timely Co-ordination with Materials department to achieve the Production.
Time study and work measurement based on the job allotted.
Coordination with SUBCONTRACTORS regarding WORK DISTRIBUTION & EXECUTION.
Co-ordination with QC Dept. & Completion of Punch List for balance work in Line’s handing over.
Facilitate for target achieving, Quality maintaining.
Responsible for Overall safety of men, Machinery and Environment.
Projects Experience
1.Client : BIOCON, Bangalore
Project : Process Piping at Block A, B & Mammalian Facility.
2.Client : Divis Laboratories, Vishakhapatnam
Consultant : P & G, India
Project : RAM Project
3.Client : Aurobindo Limited, Borapatla, Andhra Pradesh.
Project : Process Piping – ETA Block, New Facility Instrument panel
Commissioning Works @ Aurobindo – unit VIII.
4.Client : Shreya Life Sciences
Consultant : DOSHI Consultants
Project : Process Piping, Tanks & Reactors – Installations, I & C of D.W
Water, R.O Water Plant for Utilities – DPI Block, LL - Block
& Formulation Block
COMPUTER SKILLS
Software Known : MS-Office, AutoCAD –2004/2008 &
Primavera (P6)
ACADEMIA
B.Tech (Mechanical Engg.) N.C.E.T, JNTU Hyderabad 61.71%
Name of school/college Board/ University Degree Result Remarks
Defence Labs School C.B.S.E Xth 60.8% First Class
Lab Qtr’s, Kanchan Bagh Central Board,
Hyderabad. New Delhi
Q.Q.G.P.T College, O.U University Diploma 62.47% First Class
Hyderabad. Hyderabad (Mechanical Engg.)
N.C.E.T, Shadnagar J.N.T.U University, B.Tech. 61.71% First Class
Hyderabad, Hyderabad, (Mechanical Engg.)
A.P – India. A.P – India.
PERSONAL DETAILS
Father Name : Syed Hameedulla
Date of Birth : 05th Jan 1985
Passport No. : K - 215 5958
Date of Expiry : 20.07.2023
Nationality : Indian
Religion : Islam
Languages Known : English, Hindi & Telugu
Hobbies / Interests : Playing Chess, Technical Discussions
SALARY EXPECTATIONS
Expected CTC – negotiable.
Notice Period – Once Selected would join in after completion of 2 Months at present company.
Reference: Can be given on demand.
I hereby declare that the details furnished above are true to the best of my knowledge.
Date: 25.05.2019 Yours Faithfully,
Place: Qatar (Syed Khaleelulla)