AGBOKUTAYE JUDE EFETCHA
* ***** ******** ****** *** Interlocking Road, Iriebe
Port Harcourt, Rivers State.
e-mail: ****.**********@*****.**.** ; **********@*****.***
GSM: 080******** ; 080********
PROFILE
JUDE EFE AGBOKUTAYE is a registered engineer with COREN and NSE bodies. I am a civil engineer by career but have wide field experience in both mechanical piping, Installation works, Structural / fabrication and electrical works/construction. I also have Project managerial skills and I am presently pursuing managerial certifications to enhance my project management skills for huge projects both in offshore and onshore construction activities.
Professional Affiliation and Certifications:
-(MNSE) - Member, Nigerian Society of Engineers
-(COREN) - Member
-Project and Contracts Management Certification Training (PTI-Warri)
-Project Management Professional Certification - PMP (in-view)
-Permit to Work Holder Certification by SPDC
-Institute of Safety Professionals of Nigeria (ISPON) – LEVEL 3
Proficiency:
Auto-cad, Microsoft Excel, Microsoft Word, Microsoft Projects, Primavera, Power Point.
EDUCATION AND QUALIFICATION
2004 Ambrose ALLI University, Ekpoma, Edo State, Nigeria
B. Eng. Civil Engineering
1993 Nana College, Warri
Senior Secondary Certificate Examination (SSCE)
1987 Olodi Primary School ‘B’ Warri
First School Leaving Certificate
WORKING EXPERIENCE
March 2018 till date: STERLING OIL EXPLORATION & ENERGY PRODUCTION
CO. LIMITED - LAGOS
POSITION: Project Manager (Nigerian)
PROJECT: OML-13 Oil Exploration / Construction
Early Production Facility and Standard Flow Station
WBS development for Early Production Facility (EPF)
Work force coordination
Pipeline tie-in and fabrication from well head to vessels and trucking point.
Budget and Cost Effective management
Coordinate Procurement of Mechanical long lead items
July 2017 – Dec 2017: EVOMEC Global Services Limited
Base Assignment
Position: Project Manager
Project/ Job-Duties: ODIDI PLAFORM ELPS/CPF MODIFICATION/FABRICATION FOR DESICON/SPDC
Coordinate personnel, materials and equipment’s for the fabrication works
Review MTO’s, Engineering shop drawing, procurement processes, project deliverables
Plan and review of project schedule
Project cost analysis and budgeting
Interface with SPDC and DESION on technical, quality and financial issues.
July 2016 : EVOMEC Global Services Limited
Headquarter Assignment
Position: Project Services / Engineering Manager
Project/ Job-Duties: Coordinate as Project/Engineering Manager for
EVOMEC for the below duties:
Manages Subcontractor and Contractor Interphase, Contracting and Contract Management.
Manages Engineering Design output/clarification as Subcontractor with Other Main Contractors/CLIENTS (DESICON ENGINEERING, SAIPEM, NLNG, SPDC, etc)
Coordinate preparation of cost, schedule and methodologies for Tenders and proposed PO/Job offer by CLIENTS and other Main Contractors
Coordinate Resources for the execution of projects and invoicing
Coordinate with Procurement to ensure compliance with company QMS and MDS system
Communications arrangements.
Review and Coordinate technical meetings, work schedule/methods and sequences in collaboration with technical and engineering teams.
Project Manager – Fabrication of Galvanized Structural support beams for NLNG PLANT 33KVa SWITCHGEARS
Project Manager – Fabrication/Modification and supply of structural frames for ODIDI ELPS/CPF PLATFORM MODIFICATION AND EXTENSION
Jan 2016 – July 2016: Alcon Contracting Nigeria Limited
Client: NLNG-BONNY
Project: IA ADMINISTRATION BUILDING EXTENSION AND
LEARNING CENTER PROJECT; RA TYPE-3 APARTMENT
BLOCKS PHASE 1; IA WORKSHOP REFURBISHMENT &
EXTERNAL BUILDING
Position: Project Service Manager
Project/ Job-Duties: Coordinate as Project Service Manager for
ALCON Nig. Ltd for the:
Manages Subcontractor and Contractor Interphase, Contracting and Contract Management.
Manages Nigerian Content
Coordinate Land, Water and Air Logistics
Coordinate accommodation Maintenance and Supplies
Protocols/Travels
Communications arrangements.
Review and Coordinate in absence of Project Manager(s) technical meetings, work schedule/methods and sequences in collaboration with construction teams.
Sept 2015 – March 2016: Alcon Contracting Nigeria Limited
Client: NLNG-BONNY
Project: IA ADMINISTRATION BUILDING EXTENSION AND
LEARNING CENTER PROJECT.
Position: Project Engineer
Project/ Job-Duties: Coordinate as Project Engineer for ALCON
Nig. Ltd for the building and commissioning of New IA Administration
Building, Refurbishment of existing Learning center, building of New
Chiller plant New LV Substation 39 and Upgrade of power Substation
33 & 37.
Review of departmental method statements required for the execution of different works for the project
Assist Engineering manager in coordinating engineering design deliverables
Review and Coordinate in absence of construction manager work schedule/methods and sequences in collaboration with construction superintendents.
Jun 2014 – Aug 2015: Alcon Contracting Nigeria Limited.
Client: Gbaran Security of Supplies Project-
SPDC)
Position: Project Engineer
Project/ Job-Duties: Coordinate as Project Engineer for ALCON NIG. LTD on the actualization of an uninterrupted gas supply form
GBARAN CPF to Nigeria LNG Company by providing for CLIENT alternative route for evacuating produced Condensate. Manage personnel’s and materials as for the completion of remaining phase of project for ALCON NIG. LTD to actualize spiking of
Condensate pumps.
Commissioning of 4Nos. Reciprocating pumps for the spiking of condensate to NLNG and Gbaran Infield SOS project in general comprising of civil works, mechanical Fabrication, piping and equipment installation works, electrical and instrumentation works.
Supervise and coordinate with departmental heads on civil works, mechanical Fabrication and installations works, electrical and instrumentation works.
Interpretation of drawings and Auto CAD operator.
Daily and Monthly Technical Reporting to SPDC on activities.
Material Take Off reconciliation with client
General works coordination and HSE’s.
Coordinate PO’s in absence of Project manager for supply of instrument, Mechanical equipment’s and control devices via SPDC approved vendors
Schedule the project in logical steps and budget time required to meet deadline in conjunction with Project Manager and construction manager
Coordinate with site HSE’s (ALCON & SPDC) to obtain all necessary permits, certification and licenses before commencement of scheduled works.
Assist construction manager in coordinating workforce and detailing/assigning activities to workers and supervisors at site.
Managing Cost control and Project Milestone targeting
Manage community related issues on site
Feb 2009 – 2014: Alcon Contracting Nigeria Limited.
Client: Akwa- Ibom State Government
Position: Project Engineer
Project/ Job-Duties: Construction of AKWA IBOM International Airport. Construction and design of Air Traffic Control Facility, Interim Domestic Terminal, Fire Suppression Pump Facility, Maintenance Repair and Overhauling Facility, Layout of Fire Water line, portable water line and testing.
Ensuring that quality control measures put in place is followed.
Auditing, supervision work, scheduling for Sub-contractors/contracting works, B.O.Q and cost preparation for civil and mechanical works.
Preparation of technical reports, queries, Modification of Drawings & Data simulation.
Auto Cad operator/Design
Supervision and Quality assurance of Structural and mechanical works.
Structural design and detailing of structures and Architectural works
Scheduling of work details in excel spreadsheets and Microsoft projects.
General supervision of piping works
Technical reconciliation of drawings and engineering/survey data’s representation.
Feb 2008 – Dec 2008 Desko Marine Nig. Ltd
Position: Project Engineer
Project/Job Duties: Proposer for the Design and Construction of 400,000 Metric-Tons Tank Farm, 2500 Housing units and a Deep sea Port with its marine Facilities
Auto-Cad Design Engineer
Power point presentation of engineering and architectural details in meetings
Mar 2006 –Feb 2008: Shell Pet. Dev. Coy (S.P.D.C, Location Service, West)
Position: Site Engineer
Project/Job Duties: Civil Upgrade and Routine Maintenance
Cost preparation & review, B.O.Q preparation.
Supervision of civil upgrades of facilities and surface/underground utilities
H.S.E Coordination and reviews.
Mar 2005 –Feb 2006: Gingiya Memorial Sec. Sch, Sokoto (NYSC)
Position: Tutor
Project/Job Duties: Compulsory Service Year for Graduates
Mathematics and Physics Teacher
Corper’s Liaison Officer, Sokoto South district
Site Engineer, Construction of extra-large four-bedroom bungalow for Catholic Corper’s at the Bishops court.
OTHER WORK ACTIIVITIES
•Architectural and Structural Design of a Two Storied Church Complex with Gallery for the Redeemed Church, Port Harcourt, --2010
References: 1. Engr. Dale Francis
Tel: 080********; 081********
2. Dr (Mr) Aduba
Tel: 080********
3. Rev. Fr. Mordi
Tel: 080********; 080********
4. Rev. Fr. Tagwaii Cornelius
Tel: 080********
5. Mr. Benni Rubinstein (ALCON Construction Manager)
Tel: 080********; 081********; 080********
6. Engr. Alfred Mrakpor (GENERAL MANAGER - EVOMEC)