Post Job Free
Sign in

Maintenance Supervisor -Logistic Support, Traffic Control, Work Force

Location:
Chennai, Tamil Nadu, India
Salary:
2000$
Posted:
May 19, 2019

Contact this candidate

Resume:

Industry Preference:

Maintenance Supervisor

Transportation

Traffic Control

MHE Equipment’s

Personal Details

Date of Birth: 25th June 1970

Languages Known: English, Arabic, Hindi, Urdu, Tamil, Malayalam and Telugu

Address: 11/14 Hari Krishna St.Ambattur.Chennai-53 Tamilnadu,India

Passport Details: K3847606

(Valid Up to 29/05/2022)

Nationality: Indian

Valid Driving Licence

India & Saudi Arabia

Profile Summary

A result-oriented professional offering 14 Years of a successful career with diverse roles distinguished by commended performance in Traffic Management & Heavy Equipment & Heavy Vehicles Operation at various places like Saudi Arabia, UAE and Afghanistan

Experience of managing a team comprises of 17 members with 2 Traffic Foreman working directly under supervision for Lane 6 of Saudi Riyadh Metro Project of total 21kms project (includes Via Duct (Flyover) 17 km, Cut & Cover (underground) train 3 km, and road level train 6 kms)

Skilled in ensuring that all policies, procedures and controls are followed and that all reports are completed accurately and submitted on time

Steered maintenance of entire line 6-21 km and provided proper visibility through line 6 (Signage’s Boards and barrier lighting, electric arrow sign board, street light and accident barrier rectifier -repair and rebuilding projects, specifically in areas of painting, signage, and road )

An enterprising leader with skills in leading personnel towards accomplishment of common goals

Career Timeline

Core Competencies

Traffic Management

Safety Audit

Safety Management

Traffic Signal Design

Transport Management

Training & Leadership

Organizational Experience

Since Oct’14 with Riyadh Metro Project, Location

As Team In-Charge (Traffic Department)

Key Result Areas:

Preparing new safe site to start construction activity; executed U turn for construction activity with crash barrier according to design and maintain construction site with proper lighting and proper signage

Supervising Under of Maintenance in 21 Kilo Meter

1.Generators & Street Lights & Security’s Hording Boards Ceramics Repainting

2.line 6 – 55 no’s (110 kVA) Diesel & Gasoline Generators

3.Make the Schedule for Re-Fill Gasoline and Diesel Services, Fault Generator Send to Warehouse for Repair and Re-Installing.

600 no’s Street Light is Cover by 21 Km of Our Projects. Get Issue of Street Lights

4.Immediate Take Action Inform to Maintenance Team to Solve Problem As Soon As Possible

5.Re-Painting Work Concrete Barriers 20,000 no’s Every Year

6. Installing & Remove Ceramic Stone in New Diversion Roads Under 21 Km.

7.Remove and Re Fix Damage Hording Boards in Between 21 Km

Administering security personnel-31nos in line 6 and defined work according to the daily site requirement

Coordinating with warehouse team for maintenance of small equipment’s & small gen-set

Ensuring that road pathways are well-maintained at all times and illuminated during night time, barriers bulbs in good working condition, checking generator running status periodically for power supply which all connected for illumination, street light maintenance any defective conditions are spotted

Supporting utility diversion team with police permission during the utility diversion work

Fixing all the issues if any kind of accident happens in construction alignment; informing and coordinating with maintenance team to rectify barrier as soon as possible

Highlights:

Started-off with barricading and dividing lane so that traffic are controlled systematically and later installed the electrical poles, also installation of sign boards such as electric arrow for 2 way direction, Information sign board such as speed limits, including taking left, taking right, taking U-turn, speed break retarders, speed limits with flash lights at various places

Supervised and controlled gasoline filling in the small and big gen-set

Sep’10-Sep’13

DynCorp International LLC, Afghanistan (LOGCAP- IV Project) as

MHE Foreman / First Line Construction Supervisor ( Fob-Dwyer)

Key Result Areas:

8.Worked as single point of contact for transportation team for all construction projects for Ramrod & Dwyer

9.Executed dispatching, routing and tracking transportation vehicles such Forklift, Dozer, Grader, Compact, Wheel Load and Skid Steer

10.Planned, organized and managed work of subordinate staff to ensure that work is accomplished in a manner consistent with organizational requirements

11.Investigated to verify and resolve customer or shipper complaints; implemented schedule and policy changes

12.Collaborated with other managers and staff members in order to formulate and implement policies, procedures, goals, and objectives

13.Monitored operations to ensure that staff members comply with administrative policies and procedures, safety rules, union contracts, and government regulations

14.Promoted safe work activities by conducting safety audits, attending company safety meetings, and meeting with individual staff members

15.Developed criteria, application instructions, procedural manuals, and contracts for federal and state public transportation programs

16.Directed activities of staff performing repairs and maintenance to equipment, vehicles, and facilities

17.Conducted:

oInvestigations in cooperation with government agencies to determine causes of transportation accidents and to improve safety procedures

oEmployee training sessions on subjects such as hazardous material handling, employee orientation, quality improvement and computer use

18.Analyzed expenditures and other financial information in order to develop plans, policies, and budgets for increasing profits and improving services

19.Negotiated and authorized contracts with equipment and materials suppliers, and monitor contract fulfillment

20.Supervised workers assigning tariff classifications and preparing billing

21.Recommended capital expenditures for acquisition of new equipment or property in order to increase efficiency and services of operations department

22.Prepared management recommendations such as proposed fee and tariff increases or schedule changes

23.Participated in union contract negotiations and settlements of grievances

24.Provided administrative and technical assistance to those receiving transportation-related grants

25.

Previous Experience

Work Fore Planner Employee & Vehicles and @ Equipment’s.

1. Determine work procedures, prepares work schedules/logs, and expedites work flow. Establish work zones and traffic control for employee and public safety

2. Prepare surveys and reports for roads maintenance recommendations

Change the Working Location of Employees it was Necessary

Planning to Work of Additional work on Friday

Arrange Team with Vehicle and Foods.

Apr’09-Jul’10 with DP World (Seaport Container Yard), Location

As Foreman of Container Truck

DP World One the Big Seaport in Middle East. More than 200 Trailer are Working the Seaport for 24 Hours. Follow the Driver to Working Sites.

MM’06-MM’08 with Mukluk Munif Al-Otaibi, Saudi Arabia

As Petrol Pump In-Charge

MM’93-MM’99 with Saudi Aramco Oil Refinery, Saudi Arabia as Co-Coordinator

Academic Details

Graduation from XX, Location in YYY

Certification’s

26.Received:

oRiyadh Metro Project Certificate

oLetter of Appreciation of Traffic Controlling of Riyadh Metro Project

oHeavy Equipment Lifting Signal Certificate

oCertificates from US Military

oLetter of Appreciation in Recognition out Standing Service

oOSHA Safety Training Class Certificate

Skill Set

AKBARKHAN AGAKHAN

Maintenance Supervisor

Logistic Support Traffic Control Work Force Planner

*********@*****.***

KSA+966-*********, 054******* India +91-988*******, 955*******

DP World (Seaport Container Yard), Location as Foreman of Container Truck

Apr’08-Jul’10

MM’06-MM’08

US Military Supporter in DynCorp International LLC, Afghanistan as Transportation & Traffic Supervisor

Sep’10- Sep 13 Sep’13

Saudi Aramco Oil Refinery, Saudi Arabia as Co-Coordinator

MM’93-MM’99

Oct’14-Till Date

Riyadh Metro Project, Location as Traffic Department Team In-Charge

Mukluk Munif Al-Otaibi, Saudi Arabia as Petrol Pump In-Charge

Thinker

Planner

Communicator

Collaborator

Change Agent



Contact this candidate