Post Job Free
Sign in

Senior Project Engineer

Location:
Qatar
Posted:
May 15, 2019

Contact this candidate

Resume:

RAMAN PUNYAM

Hilal, Doha, Qatar +974-****-**** ***********@*****.***

Professional Summary

Successful Engineer professional offering 8+ years of EPIC Oil & Gas Project experience specializing in Instrumentation and 5+ years of Control Panel design & assembling, wiring and Testing of Control panels for Oil & Gas fields.

Experienced Project Engineer accomplished in completing EPIC Oil & Gas construction projects quickly and cost-effectively. Experienced Construction Site Engineer able to manage multiple simultaneous responsibilities to keep construction running smoothly. Excellent planner and problem-solver versed in Site preparation and day-to-day management. Skills

Technical support

Construction management

Knowledgeable in construction safety

Subcontractor management

Multi-site operations

Interdepartmental coordination

Systems Installation, Configuration, and

Upgrading

Speak & write of multi Languages (English,

Hindi, Tamil & Telugu)

Site management

Permit applications and laws

Project management

EPIC Projects

Safety and compliance

Basic computer skills

Proficient in Auto CAD

Troubleshooting expert

Strong written and verbal communication

skills

Safety procedures knowledge

Construction practices

Cost analysis

Good multitasker

Self-motivated

Supervisory experience

Work History

Project Engineer (Instrumentation) 06/2018 to Current Mekdam Technology – Doha, Qatar

Consolidated Gulf Company (CGC) – Doha, Qatar (old name) 03/2013 to 05/2018 Clients: Qatar Petroleum (QP), Ashghal, Kahramaa.

Projects Handled at CGC & Mekdam Technology:

EPIC for Upgrade of Turbine Control Systems at PS-2 & PS-3 (QP offshore Platforms).

MPGs FT110, Fire & Gas Detection System and Vibration Upgrade at NFA - PS4.

EPIC for Implementation of Instrumentation PCRs at Halul Island, PS-2 & PS-3.

EPIC of New Desalination Plant and Potable Water Storage Tanks at Halul Islands.

EPIC for Miscellaneous Instrumentation PCRS within Dukhan Fields.

EPIC of Continuous Emission Monitor System (CEMS) at QP Refinery.

EPIC for Installation of Flammable and Toxic Gas detectors at RLIC buildings

Motor Control Centre (MCC) Spares 2014 – Supply/Installation (SC 2015/17 -PS-32A)

LTC - 903/2015 - Supply of SCADA Security Hardwares and Softwares.

EPIC for Replacement of Gas Chromatograph at Station A21, Gas operations, Raslaffan

EPIC for Conversion of Flow computers for Fiscal Metering of Naphtha in Terminal Operations, Mesaieed.

Responsibilities:

Experience in EPIC Projects, Project Execution, Project Co-ordination, Site Construction Supervision, Procurement follow-ups, Field Inspections and QA/QC Documentation.

Supervised the day-to-day activities of contractors to promote productivity and efficient use of resources, ensuring on-time and under-budget project delivery.

Managed and led multi-disciplinary design team throughout development and contract document phases for the project.

Directed day-to-day operational aspects of project and scope and monitored progress of construction activities.

Developed cost estimates, procured equipment and tracked construction progress to efficiently complete large scale projects.

Communicated daily with vendors to keep project fully operational.

Ensured projects were completed according to approved time, quality and cost estimates.

Increased customer satisfaction ratings by resolving all issues professionally and in a timely manner.

Handle RFPs, RFIs and RFQs to keep project planning moving in a smooth manner.

Edited project reports, specifications, plans, construction schedules, environmental impact studies, permits and designs.

Visited project sites during construction to monitor progress and consult with contractors and on-site engineers.

Monitored personnel and construction activities for compliance with health and safety requirements.

Coordinated with vendors to identify and procure appropriate equipment necessary for the project.

Assessed site conditions and collected measurements to make accurate project design determinations.

Controlled site engineering activities to maintain work standards and meet quality assurance targets.

Estimated quantities and cost of materials, equipment and labor to determine project feasibility.

Preparation of Red Line markup drawings as per site condition and handed over to design team for As-Built preparation.

Preparation of Project related documents, Site construction/commissioning/Testing related documents, FAT/SAT Procedures, SAP documents, SPIR document and Project Dossier preparation & Submission.

Lead the group of Instrument technicians to ensure that pre-commissioning and commissioning work will be properly executed i.e. Calibration of Instruments, Loop checking of Instruments, Testing of Fire and Gas Detection System, Testing of CCTV, PAGA and MCC Panel systems Loop check, functional check, Cause and Effect Check, Logic test of Fire & Gas System and Process Instruments of different systems and sub-systems.

Preparation of Red Line markup drawings as per site condition and handed over to design team for As-Built preparation.

Project Engineer

Schneider Electric Systems India Private Limited – Chennai, TN, India Company : Invensys India Private Ltd – Chennai, TN, India (old name) Period : June 2010 – Feb 2013 (Under Deputation by ATZ System Integrators, Chennai as a Project Engineer)

Period : Apr 2005 – Jan 2009 (Under Deputation by ATZ System Integrators, Chennai as a Panel Supervisor & CAD Designer)

Responsibilities:

Having experience in all type of Control Panel Designing, Control Panel Assembling and wiring.

Design all the drawings like Instrument Loop drawing, GA/IA drawings, System Architecture and all type of cabinet drawings.

Preparation of Basic Engineering documents like BOM, Power Calculation and System Architecture, System & Marshalling and Power Cabinet Drawings for Panel Construction.

System staging for Pre-FAT, also ensuring all cards and chassis mounted correctly and Mechanical Inspection of cabinets as per drawings.

Final documents of PLC database, Loop Drawings preparation, Final (Post FAT) hard copies of documents sent to customer.

Good system knowledge on Auto CAD, Micro station and MS office.

Generating System, Marshalling, Relay cabinet drawings and Loop drawings.

Having site supervision experience in IOCL, Panipat for Naphtha Cracker Project.

Preparing work-measurement bills as per the scope for the completed jobs.

Supervising the activities Instruments installation, Junction boxes installation, control panel erection, Tray installation, Cable Laying, cable glanding and terminations at field side & control room side.

Field Instruments Calibration, loop checking & pre-commissioning activities.

Execution of panel fabrication, wiring and also Panel testing and Quality checking.

Preparation of marshalling cabinet termination details and printout the ferrules for panel wiring.

Types of Panels Assembled in Invensys:

DCS, ESD, FGS System & Marshalling Cabinet, Interposing Relay Cabinet (IRP), Power Distribution Cabinet (PDB), Field Bus Module Cabinet (FBM), Fiber Optic Cabinet (FOC), Local Control Panel

(LCP) and Consoles.

Instrumentation Supervisor 02/2009 to 05/2010

Galfar Engineering & Contracting SAOG – Muscat, Oman Project : Harweel Cluster Phase 2 Development Project in South OMAN. Client : Petroleum Development of OMAN (PDO).

Responsibilities:

Planning and Executing instrument works for HCS, HMPS and WELL HEAD areas.

Experience on WILMAX Well head control panel operation in oil well heads (OSBL).

Working experience on consoles in the control room during cold & hot loop checks.

Supervise the activities of Instrument cable lying, installation of cable tray, Junction box & field instruments, Control panel erection, cable glanding and terminations at field side & control room side.

Received a Safety appreciation certificate from PDO, Oman for 7 million Man-hours without a Lost Time Injury (LTI) in Harweel cluster Phase-II Project.

Able to read and understand Instrument Loop diagram, Logic diagram, P&ID drawing, Cause & Effect diagrams, Process flow diagrams, Termination Drawings and Layout drawings etc.

Perform the activities of Calibration, loop checking and Pre-commissioning activities in all type of process and Fire & Gas instruments.

Good experience in Calibration of all Process Instruments, Control valves and On/Off valves, MOV's and Safety Valves.

Preparation of Red Line markup drawings as per site condition and handed over to design team for As-Built preparation.

Familiar with safety system / Permit to work system. Education

B.Tech: Electrical & Electronics Engineering (Part time) 2012 Jawaharlal Nehru Technological University Hyderabad - Hyderabad, Telangana Diploma: Electrical & Electronics Engineering 2004 S.V Govt. Polytechnic - Tirupathi, Andhra Pradesh

Certifications

COURSE CERTIFICATE:

Appreciation certificate received from Qatar Petroleum (QP) on successful completion of Gas Turbine Control System Up-gradation Project at PS-4 (QP Offshore Platform).

Training certificate from Qatar Petroleum (QP) on the course of “HSSE Induction Safety Training” at QP Raslaffan.

Training certificate on “Project Management Professional 6th Edition Program – PMP” course from Masters Art of Education institute at Doha, Qatar.

Certificate from CSC, Chennai on the course of “Diploma in Auto CAD Professional (ACP)”.

Having a valid Qatar Driving License and it is valid until year of 2024. DECLARATION:

I hereby declare that all the information furnished above is true to the best of my knowledge and belief.

(Raman Punyam)



Contact this candidate