Resume

Sign in

Engineer Project

Location:
Constanta, Constanta County, Romania
Posted:
May 05, 2019

Contact this candidate

Resume:

ADRIAN ABASEACA

Constanta—Romania,**/**/****

*,******* ***.,**.**,Sc.C,Ap.47,Constanta,900394,Romania

E-mail: ac9azo@r.postjobfree.com

Telephone: mobile: +407******** (Romania)

Fixed: +403******** Relations: +407******** (Romania)

Skype: adrian.abaseaca

Professional Profile

Highly-motivated and proactive Instrumentation/ICSS Engineer educated to Master degree Level, with a strong background in Instrumentation / ICSS engineering in the oil & gas and energy sectors; specialising in construction, maintenance and commissioning. Has a proven record of achievement leading a variety of Instrumentation installation projects. Has a full comprehension of health and safety and industry specific regulations, with verifiable experience in delivering tasks to timeline and budget. A motivational leader, able to provide supervision to staff and subcontractors so that company objectives can be achieved; with the ability to influence business decisions and formulate positive internal and external relationships. Secure a challenging engineering position where in my team player attributes, experience, and communication skills can be utilized in obtaining personal career goals and those of the employer.

Key Skills

Instrumentation Engineering: Highly competent and knowledgeable Instrument Engineer specialising in Instrumentation Process Control, Safety Control Systems and Fire and Gas. Proficiency in ICSS (DCS+SIS+F&G): YOKOGAWA CENTUM 3000 R3, FOXBORO, DELTA V, ABB, HONEYWELL EXPERION C 300. SIS (Safety Instrumented System +ESD): TRICONEX SIS, TMR and Yokogawa PROSAFE. Knowledge of Monitoring System, Bentley Nevada 3500 and System 1. Good commissioning knowledge of F&G and VESDA System.

Project Management Expertise: Commands strong leadership expertise and strong business acumen, with the ability to manage a team and oversee contractors. Able to see a project through from inception to completion. With experience of running projects, carrying technical supervision of team up to 300 people.

Communication and Interpersonal Skills: Commands exceptional communication and relationship management skills; able to form positive and productive relationships with clients, contractors, staff and senior managers.

Languages: English -Fluent, French-medium and Italian, Russian-Basic.

Technical: MS Office (Word, Excel and PowerPoint); Internet; dBase; SAP R/3; Maximo 5; IMIS, ACS, ICAPS and Opercom Methodology, Lotus Note, Vision, QED, Cimplicity 6.1 of GE (Open and combined cycle of turbines);Petro Pcs (Petrofac)/ Win Pcs; Petrocept DC (Zadco).Good management of National and International Codes, Standards and recommended practices such as ISA, API, NEC, NFPA, IEC. Participate in various technical reviews (HAZID, HAZOP, and PTR) and SIL, as required. Good knowledge of Communications Protocols: HART, MODBUS, FIELDBUS, PROFIBUS.

Career History

2018; Feb – 2019,Jan Instrument Commissioning Superintendent Petrofac—Fadhili Project, Saudi Arabia

Key Responsibilities and Achievements:

Petrofac’s scope of work includes the construction/commissioning of six sulphur recovery trains with associated facilities for the sulphur and heavy duty oil handling, loading, unloading and storage; sour water stripper, flare system and waste water treatment plant. Saudi Aramco as Client.

Coordinate with Instrument, Telecommunication, DCS and other allied disciplines as individual systems and subsystems to achieve/commence pre-commissioning and commissioning. Constantly monitor to identify and communicate to Construction team on any priority areas of work to achieve smooth commissioning. DCS—Yokogawa Centum 3000 R

Coordinate full Loop-Checking / Start-up activity related Instrumentation field’s devices and ICSS.

2017; Jul – December Senior Lead Commissioning Instrument Engineer Petrofac—Reggane, Algeria

Key Responsibilities and Achievements:

Petrofac’s scope of work includes the engineering, procurement, construction, commissioning and start-up (EPCCS) of the gas treatment plant, gathering system and export pipeline.

Coordinate with Instrument, Telecommunication, ICSS and other allied disciplines as individual systems and subsystems to achieve/commence pre-commissioning and commissioning. Repsol as client.

Constantly monitor to identify and communicate to Construction team on any priority areas of work to achieve smooth commissioning.

Coordinate full Loop-Checking activity related Instrumentation field’s devices ICSS Honeywell Experion C 300, packages, F&G System, Solar Turbines full commissioning involved.

Liaise with Vendor’s representative for all Packages. Start-up full involved till first gas export (14 December 2017).

2015; Dec – 2017 May Senior Commissioning Coordinator Petrofac—UZ750, Zadco EPC2—Singapore + Abu Dhabi

Key Responsibilities and Achievements:

The UZ750 project is one of the major offshore field development projects in the UAE. It is located 80km off the coast of Abu Dhabi, and is being constructed on 4 artificial islands.

Coordinate with mechanical, rotatory, electrical, instrument and other allied disciplines as individual systems and subsystems to achieve/commence pre-commissioning and commissioning. ZADCO as Client.

Constantly monitor to identify and communicate to Construction team on any priority areas of work to achieve smooth commissioning.

In Dyna-Mac Singapore Yard coordinate with DSME Commissioning Coordinator of all pre-commissioning and commissioning activities.

Review and monitor contract commissioning procedures (commissioning manuals, OTP – Operational, Test Procedures, startup manuals etc.) for the readiness of the commissioning activity—in Petrofac Abu Dhabi Office.

2014; Dec – 2015 Oct Lead C&A Commissioning and Start-up Engineer PDO—Yibal, Fahud, Oman

Key Responsibilities and Achievements:

Petroleum Development Oman (PDO) is the major exploration and production company in the Sultanate of Oman.

Support the establishment of the strategies, plans and targets for the commissioning phase to ensure that key project objectives are met in respect to HSE, quality/performance, schedule and cost.

Review and comment on the Contractor’s documents on instrumentation & control equipment including method statements, ITPs, work procedures and practices.

Ensure design packages meet the relevant safety, environmental and ergonomic standards & end user requirement specification. Support the implementation of the Flawless Start up Initiatives in the execution of pre-commissioning and commissioning activities.

Monitor the Contractor’s electric, instrumentation & control equipment installation and pre-commissioning activities and ensure these are executed in accordance with the project HSE, technical specifications, quality standards and procedures defined in the contracts. Full involved in Pre- comm. and Commissioning of DCS HONEYWELL EXPERION C 300, F&G System Yokogawa, VESDA, IRP,VFD.

2014, Nov – 2014, Dec Functional Test Supervisor Tecnicas Reunidas--Tupras refinery, Izmit, Turkey

Key Responsibilities and Achievements:

TUPRAS is biggest Turkey’s oil refinery located in Izmit. Capacity: 11.0 million tons/annum & 220,000 bbl/ day

Commissioning and functional test for GE Stream Turbine—SANC1-6+Gear Box Electric Generator, assisting GE Vendor. Commissioning competition and troubleshooting activity, start up and functional test.

Present result for Bureau Veritas expert for certification and in presence of GE field service Engineer, as Vendor of turbine. Check Bentley Nevada 3500 / System 1, GE Fanuc PLC as command and HIMA PLC as protection, Sanco fire and gas system. Follow Site Quality Loop Check List in according with GE Methodology.

2013, Sept – 2014, April Lead DCS Commissioning Engineer Marubeni Engineering—Calabar, River Cross State, Nigeria

Key Responsibilities and Achievements:

The Greenfield Power Station of Calabar are 5 GT General Electric type PG 9171 E, DLN with plant capacity of 600 MW works in open cycle with space provision for future extension to combined cycle.

Full involved in DCS, Yokogawa 3000 R3 configuration as BOP (Balance of the plant) control. Cause and Effects and Control Narrative checking.GT turbine controlled by MARK VI. To integrate both signals, by GT and BOP (balance of the plant) to control and monitored by HMI, system use 2 UOI (Unified operator interface) servers. The platform used is Cimplicity 6.10—Pack 5(by GE Fanuc for open/combined cycle of turbines).

Full involved in loop-checking and settings of all components of the system. Rectify and trouble shooting of faulty loops and instrument loop discrepancy from design parameters, using As-Built drawings. Interlock logic system functions checking. Performs fine tuning for pressure, temperature, level and flow controllers in process control, SCADA System for Switchyard.

2012, Oct – 2013, June Lead Instrument Commissioning Engineer Agip KCO— D Island Project, Kashagan Offshore, Experimental Project, Kazakhstan

Key Responsibilities and Achievements:

Kashagan Field is an offshore oil field in Kazakhstan's zone of the Caspian Sea, close to Atyrau and is considered the world's largest discovery in the last 30 years, combined with the Tengiz Field. Estimates that development of the field had cost US$ 150 bill.

Commissioning, loop checking instrumentation of F&G System from the field to Foxboro DCS system in main control room, toxic and IR Detector, Manual call buttons, sprinkler system, deluge system, CO2 System, Inergen system, PLC ABB, Allan Bradley, etc.

Member of Integrated Commissioning & Acceptance Team responsible for preparing work packs for individual fire zones, allocated duties and supervised technicians carrying out loop checking and dynamic cause & effect testing of fire and gas detection and fire dampers.

Liaised with Republic of Kazakhstan government representatives to ensure systems comply with local mandatory standards allowing a smooth transition from commissioning to operation.

2012; May – 2012 Sept PMT Senior Commissioning Instrument / DCS Engineer SATORP—Al Jubail 2, Pack.6, Saudi Arabia

Key Responsibilities and Achievements:

As one of the largest, most complex refineries in the world, SATORP Project (around 25 bills. USD) is capable of converting Arabian Heavy crude oil into low-sulphur gasoline, diesel, and jet fuel to meet specifications for markets in the United States, Europe and Japan. Total / Aramco as client. Tank Farm Package, working on Jubail Export Refinery Project( JERP) for Saudi Aramco Total Refining & Petrochemical Company (SATORP), Jubail, Saudi Arabia.

Pre-Commissioning and commissioning activities per applicable Company standard supervising the Contractor activities (Petrol Steel Company Ltd and Rotary Engineering Ltd—Singapore): RFC, RFSU, RFISU, etc.

Responsible for witnessing as part of Pre-comm. and Comm. Checks, control preliminary checks, basic function tests and Operation tests: field instruments, Fire and Gas System, PA/GA, DCS Delta V, FM 200, ESD, PCS, Marshalling cabinets, Analysers, etc. Activities using OPERCOM Methodology and results recorded on ICAPS Forms.

2010; Dec – 2012 April Lead Method Instrument / DCS Engineer Total—Port Harcourt, River State, Nigeria

Key Responsibilities and Achievements:

Maintenance and Commissioning of new extension equipment: turbo-machines, compressors, diesel and gas motors, pumps, DCS Yokogawa and Delta V in Obagi, Obite, Ibewa, Olo facilities (Nigeria, Port Harcourt Area)

Provides technical support to the Maintenance team for equipment. Acts as the focal point for engineering matters, and provides expert technical reports to the Head of Maintenance.

Supervises the implementation of minor modifications and improvement projects, to ensure their safe, cost-effective and timely execution in accordance with established Company standards and specifications.

Assists the Head of Maintenance in the preparation of budgets, contracts, shutdowns, modifications, warranty claims, vendor mobilisation and all other support functions necessary for the efficient running of the section.

Ensures updating of the CMMS—SAP R/3.

2006; Mar – 2010 April Senior Instr. /DCS Analyst Engineer Dietsmann—Mellitah Complex, Libya

Key Responsibilities and Achievements:

A Joint Venture between BONATTI – Italy and DIETSMANN – Monaco has been created for maintaining the ENI Plants and Equipment in Mellitah Complex (Libya). The Mellitah Complex is one of the largest gas treatment plants in the world and petrochemical.

Assists maintenance team in all the activities, optimization of time and resources, statistics and report, Equipment Reliability, Critically Analysis and optimization. CMMS Maximo 5 daily use.

Check deeply and created reports regarding all failures of Instrumentation and DCS.Propose solutions.

Create reports and participate to meetings with Client: Eni Gas Libya

2005; Feb – Dec. Instr. /DCS Commissioning Supervisor Tecnimont—Shell CSPC Petrochemical project—Nanhai, Huizhou Province, China

Key Responsibilities and Achievements:

Huge Petrochemical plant: LDPE, HDPE, PP and Polyolefin under Shell and CSPC, value 4.5 Bill.

Coordinate full Loop-Checking related Instrumentation field’s devices, DCS Yokogawa Centum 3000 R, Electrical

Check loops related IPS—Triconex Invensys, Fire and gas: Cerberus(Siemens),MOV/ROV – Metso

Managed 60 multinational field technicians

2003; May– 2004 Sept Instrument Engineer Rompetrol—Petromidia Navodari, Constanta, Romania

Key Responsibilities and Achievements:

KMG International owns one of the biggest and most technologically advanced refineries in the Black Sea region – Petromidia Navodari – having a refining capacity of 5 million tons of raw material per year.

In charge for managing Maintenance (Routine, Preventive, Predictive, Turn Around activities), commissioning for new update units

Coordination of a large team (more 100 people) in maintenance of: Security systems, Control access, CCTV, F&G systems, Fire fighting systems. Installation of more 50 new Security systems (Paradox, Bentel), CCTV (Sony, Matsushita, Phillips.

2001; Oct– 2002 July Instrument Supervisor Snam Progetti—Bonny Island, Nigeria

Key Responsibilities and Achievements:

LNG SHELL / NNPC Nigeria Project. Nigeria LNG Limited operates six liquefaction units (LNG trains) producing 22 million metric tons.

Construction and Pre-commissioning, Commissioning in a huge project under EPC Contract of TSKJ consortium: KBR, Snamprogetti, Technip and JGC Corporation.

In charge with coordination of a large team (more 100 people) in construction of Train 2 on LNG—Shell.

Involved also in pre-commissioning / Commissioning of Foxboro DCS, Loop-checking activity in Train 1 of LNG Project-Shell.

Early Employment Summary

2001 Project Engineer UTI Group, Bucharest

2002– 2003 Technical Manager Panghios srl, Constanta

1992– 2001 Chief Executive (Proprietor) Comteh srl, Constanta

1983 –2001 E/I Superintendent Landed ameliorations National Company, Bucharest

Education and Professional Development

University degree: Master Degree in Electronics and Telecommunications --- Technical University “Gheorghe Asaky”—Iasi, Romania (1983), 5 years

Professional Training

International Comm. and Economics Relationships, Strategic Management-- 1995, Bucharest, Romania

Fire Gas and Fire fighting Training (1985, Bucharest, CEPECA Training, Romania)

Oil Gas Instrumentation (2002, Bonny Island, Snam, Nigeria)

Instrumentation in Oil and Gas Field (2003, Petromidia, Constanta, Romania)

Loop checking training for O&G—Yokogawa 3000 R3 (2005, Nanhai, Shell—China)

CMMS MAXIMO 5 Training (2006, Mellitah, Dietsmann, Libya)

H2S Safety Training, H2S Awareness Training—2007, Mellitah, Libya

CMMS—SAP R/3(UNISUP R/3) Training --2010/2011, Port Harcourt, Total, Nigeria

Course in basic life support and First Aid—Nov.2006, Sabratha, Libya

Basic offshore safety induction—BOSIET—24 Oct.2012—24 Oct 2016, Atyrau, ROK

Helicopter safety and Escape training [HUET]—Atyrau, ROK

Sea Survival Training—Atyrau, ROK

Fire Fighting and Self Rescue Training—Atyrau, ROK—oct.2012

Confined Space courses (TOTAL, Shell, Rompetrol, SATORP, Agip and Dyna-Mac Singapore).

Gas monitoring courses (Shell-NLNG Training Center Bonny Island, Dyna-Mac Singapore).

PTW Training and LOTO System—D Island Complex, ROK—Jan.2013 and Fadhili, Saudi—2018

Cimplicity (GE) 6.1 ---Calabar, Nigeria (Oct.2013)—Process monitoring and control system.



Contact this candidate