Post Job Free
Sign in

Engineer Project

Location:
Jalalpur, Uttar Pradesh, India
Posted:
May 05, 2019

Contact this candidate

Resume:

Kamlesh D Vasava

Project Engineer (Automation)

*/*/***, ***-*, Jalaram colony Contact No: +91-987******* Ukai-Dam Gujarat India +91-990*******

E-mail: **********@*****.***

********@*****.***

Objective

My Objective is to acquire highest levels of excellence in a co-operative and innovative environment of Engineering where I can utilize my skills with my smart work. Professional Profile

I have technically accomplished professional with over 12 years of functional experience in Automation control system commissioning and project execution.

I have worked on plant automation solutions provided by YOKOGAWA & Rockwell Automation.

Technical capabilities are Evaluate Scope of Work, Details Engineering & Design.

Reading and understand the process flow schematics, functional gate logics, ladder logics.

Study of data sheets from different vender & technical validation for procurements.

Prepare System Architecture.

Details Engineering for System Cabinets, Marshalling Cabinets PDP Cabinets Network Cabinets & Consoles, processing for construction. Cabinet, console inspection and testing at vender place.

Prepare Grounding Scheme, Control room layout

BOM preparation and finalization, Activities planning with respect to project schedule.

Conduct PRE-FAT / FAT / SIT / SAT

Programming PLC, DCS, HMI,SCADA

Pre-Commissioning and Commissioning of Control Instruments and Automation Systems.

System segregation for overall Commissioning.

Supervision of Instruments cable laying, conduit installation, JB installation, calibration of Instruments.

Loop checking – Conduct the hot and cold loop checks of DCS System and Process Instruments.

Functional check of DCS System and Process Instruments.

Carry out the functional checks of DCS and Interlock system along with implementing new facility changes from operation.

Provide technical, hands-on support for overall Commissioning.

Punch list clearance system sign off, site modification as required at site condition, discuss & finalize with clients changes required at site.

Final Handover & Close out of Project.

Responsibilities:

Details Engineering & Design, Preparation of Power load calculation, IO assignment

& Allocation, Detailed GA & IA drawing, Wiring drawing, System Cable schedule, Cable Block diagram, Instrument cable schedule, JB termination details. Erection and Installation of DCS/ESD/F&G Control Panel, I/O Termination at Cabinet

& JB Side, Functional Check for YOKOGAWA DCS System, Cold loop checking, hot loop checking. Graphics Modification, Function Check for Instruments. Educational Background

Degree/Course Board/Institute/University Year Percentage Diploma in

Electrical

Technical Examination Board

Gujarat

2002 67.88 %

S.S.C Gujarat Secondary Education Board 1999 71.86 % Professional Experience

Sr. No Company Name Designation Duration Years

1 Reliance Industrial Automation (UAE) Sr.Project Engineer JULY-2010 TO JUNE-2014 4 2 Sands Utility System (India) Project Engineer AUG-2006 TO JUNE-2010 4 3 Wockhardt Hospitals Ltd (India) Maintenance Engineer FEB-2003 TO JULY-2006 4 Personal Information

Full Name : Kamleshkumar

Date of Birth : 15

th

Jan, 1984

Gender : Male

Marital Status : Single

Passport : G5980404

Project Details

Project: Hubshan Sulpher Granulation Project, Abu-Dhabi. Major Responsibilities:

FAT Support, Erection and Installation of DCS/ESD/F&G Control Panel. SAT Support, Functional Check for YOKOGAWA DCS System, Cold loop checking, hot loop checking. Graphics Modification, Establish Communication for Subsystem. Project: Automation revamping at SABIC IBN RUSHD. Saudi Arabia Major Responsibilities:

Erection And Installation of DCS/ESD/F&G Control Panel.SAT Support, Functional Check for YOKOGAWA DCS System, Cold loop checking, hot loop checking. Graphics Modification, Establish Communication for Subsystem. Project: Automation up gradation at Khatiyah Degassing Plants (QATAR): Major Responsibilities:

Erection and Installation of DCS/ESD/F&G Control Panel, I/O Termination at Cabinet & JB Side. SAT Support, Functional Check for YOKOGAWA DCS System, Cold loop checking, hot loop checking. Graphics Modification. Project: Ruwais Refinery Expansion Project Takreer (UAE). Major Responsibilities:

Erection and Installation of DCS/ESD/F&G Control Panel, I/O Termination at Cabinet & JB Side, Functional Check for YOKOGAWA DCS System, Cold loop checking, hot loop checking. Graphics Modification, Function Check for Instruments. Project: 3.3 KV Switchgear Replacement at Umm Al Dalakh (ZADCO, Abu-Dhabi) This system is used to Monitor & Control the Load Shedding of Generator. Role: - Panel Designing and Testing, PLC programming, HMI Developing and commissioning

CPU: - Controllogix L61

I/O: - 1794 Flex I/O.

HMI: - Touch Screen PC (Axiom)

Networks: - Control net

Programming Language:-Ladder

Project: DUBAI NATURAL GAS (UAE).

Major Responsibilities:

I/O Termination at Cabinet & JB Side, Cold loop checking, hot loop checking. DECLARATION

I hereby declare that the above-mentioned information is correct up to my knowledge And I bear the responsibility for the correctness of the above mentioned particulars. Kamleshkumar



Contact this candidate