Resume

Sign in

Construction Manager

Location:
Riverside, CA
Posted:
September 05, 2019

Contact this candidate

Resume:

David Ackerman

626-***-****

ac99ua@r.postjobfree.com

EMPLOYMENT HISTORY

Walton Construction Services

Los Angeles, CA.

****-****

Project Manager /Superintendent

Affordable Income and Market Rate Apartments

Project Santa Cecilia 80 Townhomes

Pico 11 Market Rate Santa Monica, CA 38 Units

Nightingale Affordable Income 30 Units

Subcontractor Buy outs negotiated and,all contracts scope of work for all contractors.

Worked with my Architects, MEP Engineers, Soil Engineers, artifact Archaeologists City and County

Plan Check, Building and Building and Safety inspectors, Sweep Inspectors, Life Safety Inspectors, Hertz Rater inspections Cass inspectors. Hers rator,

The objective was to finish with quality and safety and to be on budget.

Working from excavation, Concrete, framing, plumbing, electrical, low voltage Insulation, drywall, Stucco, HVAC through finished units.

receiving my CFO certificate of occupancy, the first time.

Universal Studios

Los Angeles, CA.

Fast and Furious

2014-2016

Universals corporate liaison officer working directly with the General contractor (Clark Construction). Worked with all ride show engineers, Architects and Finance officers. Keeping budgets, responsible for a three week look ahead. Conducted all white board meetings. Working in conjunction with all sun contractors for scheduling and progress of all phases of construction. Working with safety officers from Universal corporate to Clark construction as well as consultants.

2009-2014

North Dakota Commercial Construction

Fargo North Dakota

Scheduled all material and labor, worked with Project Managers, Architects, Engineers.

Building two building four hundred and fifty feet and five hundred feet. 72- and 78-unit apartments with subterranean parking. Ground up construction. Three stories wood frame construction. Scheduled electricians, plumbers, framers, modular framing. excavation, building and safety.

Fargo North Dakota is a hands-on position performing all aspects of construction.

2006 to 2009

YIM Construction

Project Superintendent – (LA Public Works Project & Anaheim High School, L.A. Trade Technical, L.A. Scheduled all trades. Weekly Construction Meetings, R.F.I.'S, Sweep Reports Summary Logs, Weekly SSI. Reports, Daily Labor Logs. Conducted and observed all safety meeting from each trade, Responsible for no abatement work at site,Plan, organize, and direct activities concerned with the construction and maintenance of structures Prepare and submit budget estimates and progress and cost tracking. Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractor Collaborated with all Engineers, Architects, Owners Representatives, Inspectors of Record, Deputy Inspectors. I.O.R on site, through all phases of construction. Procore,Primavera, Word, Excel,

1995 to 2005

AGC Developers

Los Angeles, CA.

Project Superintendent

· A.G.C. affordable housing T.C.A.C, Tax Credit Association of California State funded affordable housing, following all federal and state guidelines

· And requirements. Negotiated all pre-construction bids with subcontractors and material vendors. Maintained all contracts, set all time line schedules during construction.

· Interacted with Architects, visiting funding Architects, Structural Engineers, Building

· Inspectors, Geologists, Housing Authority, and Utility Inspectors.

· To walk and inspect all work on a constant basis, as well as keep a site log of daily events R.F.I.'S Materials Certifications I have a complete understanding of T.C.A.C. compliance regulations and the state building codes. During this phase I was responsible for eleven retail facilities, seven state funded buildings, two condominiums Condominiums, Retail developments.

1993 to 1995

Tom Torre Designs

Woodland Hills, CA.

Project Superintendent: Tom Torre Designs

Oversaw all hardscapes, pools, decks, and architectural walls, concrete driveways.

Worked directly with clients. Scheduled vendors and subcontractors. Made sure that

·All projects were completed on time and on budget.

EDUCATION

Cal State University Rancho Dominguez

Green Construction & Construction Accounting

LA County Office of Education

Enhanced Job Readiness Certificate Northwestern University

Economic Major

CERTIFICATIONS

· OSHA 30

· Hazmat

· Red Cross First Aid Certificate

· Trench Shoring

· RSO Certified

· Red Cross CPR Certificate

REFERENCE.

Tom Torre

Tom Torre Designs

818-***-****

Erik Tapia DCE Electric

661-***-****

Brad Hunt KB Plumbers

626-***-****



Contact this candidate