Post Job Free

Resume

Sign in

Power Plant Electrical Engineer

Location:
Lahore, Punjab, Pakistan
Posted:
September 02, 2019

Contact this candidate

Resume:

EDUCATION

WORK EXPERIENCE

s

Professional Objective

To join a progressive organisation offering for diversified experience, enhancement of Professional skills and carrier growth with potential to raise highest échelon in the field of Power Génération, Transmission, Distribution & Utilization.

Muhammad Awais Ur Rehman

House No 48, Street No 14, Block-Y, New Satellite Town, Sargodha - Pakistan Year 2015 : Institution Name : COMSATS (VU), Islamabad Degree Level : M.Sc (Project Management)

Year 2012 : Institution Name : The University of Lahore Degree Level : B.Sc (Electrical Engineering)

Year 2008 : Institution Name : Fazaia Inter College Mushaf, Sargodha Degree Level : F.Sc (Pre-Engineering)

Year 2005 : Institution Name : Fauji Foundation Model School, Sargodha Degree Level : Matric (Science)

Start date : 1st April 2019 / Present :

JOB TITLE : Senior Manager Power House & Electrical Company Name : Shafi Texcel Private Limited, Lahore - Pakistan Industry : Power Plant & Textile Industry

Worked as Operation & Maintenance on 7.5MW Power Generation setup based on CAT3516B gas engines upto 3.5MW and CAT3512 upto 4MW Diesel Engines. Supervise electronics dept, air compressors, mills electric dept. Start date : 5th March 2015 / 31st March 2019 :

JOB TITLE : Manager Power House

Company Name : Ittehad Private Limited, Faisalabad - Pakistan Industry : Power Plant & Textile Industry

Worked as Operation & Maintenance on 10MW Power Generation setup based on GE Waukesha 5904LT gas engines upto 6MW and CAT3512 & Cummins Diesel Engines. Develop feasibility of Energy project (Cogeneration). Start date : 12th Nov 2012 / End date : 4th March 2015 JOB TITLE : Asst Electrical Engineer

Company Name : Ghazi Fabrics international Limited Lahore – Pakistan Industry : Power Plant & Textile Industry

Worked as Operation & Maintenance on 30MW Power Generation setup based on GE Jenbacher 620 gas engines upto 12MW, SIEMENS 132kV, 10/13 MVA Grid Station & installation work of new Project of Ghazi Power Ltd based on MAN-DIESEL 18v28/32s HFO/Biofuel engines upto 8MW. Start date : 25th Sep 2011 / End date : 5th Sep 2012 JOB TITLE : Trainee Engineer

Company Name : Zephyr Textile Limited – Pakistan

Industry : Power Plant & Textile Industry

Worked on Caterpillar Gas Engine 3520c (1750 KW x 02) and HRSG system in Operation as well as routine maintenance. Also execute Erection of Caterpillar Gas Engine # 3. Start date : 22nd August 2011/ End date :22nd September 2011 JOB TITLE : Trainee Engineer

Company name : Ghazi Fabrics international Limited Lahore – Pakistan Industry : Power Plant & Textile Industry

One month internship with Ghazi fabrics International Limited in 45MW Power Plant based on CAT3616 HFO/Diesel Engines, JenBacher 620JGS, 132KV LESCO Grid and Renewable Energy (BIO-GAS). Start date : 16th July 2011 / End date :16th August 2011 JOB TITLE : Trainee Contract Management

Company name : Wartsila, Pakistan

Industry : Power Plant.

One month training programme with WARTSILA Pakistan in Nishat Power Plant, an IPP & CCPP of 200MW based on Wartsila 18V46 HFO/Diesel Engines with Dresser-Rand Steam Turbine.

I have done project management for new Power Project based on HFO/dual fuel engines, Gas Turbines & Steam Turbine for Ittehad group based on Spinning, Weaving & Processing Unit.

I have done thesis work of MS Program as “Project Engineer” on 10MW coal fired Power Plant at Ghazi Power Limited using advanced technology Gasifier named as “Circulating Fluidized Bed” by applying all Project Management Processes (Initiation, Planning, Execution, Closure & Controlling).

I have design a protection scheme as final year project named “islanding Detection techniques in Distributed Generation of LUCKY WIND ENERGY”, a 50MW wind farm locates near Karachi, Pakistan.

Key Skills (Technical & Management Area)

PERSONAL INFORMATION

Father’s name : Abdur Rehman

Date of birth : 09-Oct-1989

N.I.C # : 38403-5943930-3

PEC # : ELECT-35954

Passport # : AQ-1699302

Valid Visa : Turkey/China/Dubai

Nationality : Pakistani

Religion : Islam

Marital status : Married

Cell # : +92-301-*******

E-mail : ac98h3@r.postjobfree.com

Skype ID :

muhammad.awais.ur.rehman

Certificates/Awards

01- Introduction to Project Management

(PEC)

02- SimpowerSystem MATLAB Based

Power Engineering (PEC)

03- National Engineering Robotics

Competition 2011 (NUST)

04- Labview (EME, NUST)

05- SCADA & PLC Programming (PEC)

06- Total Quality Management (PEC)

07- Construction Safety & Challenges

08- EnMS Implementation (UNIDO)

JOB RESPONSIBILITIES

As Manager Power House

o Manage existing Gas engine power plant, its scheduled/unscheduled maintenance (top end, major overhauling).

o Manage Electric generation from 3 different FESCO Grids in order to reduce downtime on any production unit along with detail energy consumption (SNGPL, FESCO Off peak/peak) in various department of spinning, weaving & processing.

o Preparation of Generation & Distribution license on SNGPL Captive Power for Ittehad group of industries within rules & regulations of FESCO & NEPRA. o Design energy project based on “Tri-generation” which compete electric demand, steam required

& thermal load.

o Maintain all project management process (initiation, planning, execution & closure) from any minor to major project, which include following management areas

Integration Management

Scope Management

Time Management

Cost Management

Quality Management

Human Resource Management

Communication Management

Risk Management

Procurement Management

Stakeholder Management

As Assistant Electrical Engineer on Gas Power

I have prepared Daily, Monthly & Annual (Generation + Consumption) reports and analyze results on graphs, bar charts & Pie-Diagrams. I have performed Opérations & Maintenance on following equipments installed in Gas Power.

• Jenbacher Gas Engine Model # 620JGS (4 x 3MW)

• Caterpillar Gas Engine 3512, 350KVA

• Caterpillar Diesel Engine GEP-200, 200KVA (Black start)

Design auto load shed scheme in synchronizing with WAPDA.

Synchronization with 132KV LESCO Grid.

Synchroscope & Checks Synch Relay DKG-117 by DATAKOM, Turkey

Power & Reverse Power Relay XP1-R by SEG, Germany

Loss of Main Relay LMR-122D by DEIF, Denmark.

Design Auxiliary Status of Gas Power Plant installed by Siemens.

Multifunction relay 7SJ6025 by Siemens

• LESCO 132KV Grid 10/13MVA Siemens

Synchronization with 132KV LESCO Grid.

Maintain record at 132KV Grid (Energy Consumption + Generation)

Multifunction relay 7SJ6025 by Siemens

Dehydration of Distribution Transformer (SIEMENS) installed in textile units.

• Perform following test along with SIEMENS & MISMA Engineering representatives.

Di-electric strength test of Oil

132KV Surge Arrestor replacement along with Surge Counter.

Enhance the rating of existing 11KV Bus Bar (60 x 10mm).

Detect oil leakage from MV bushings and rectify it.

Insulation Resistance (IR) Test of Power transformer (132/11KV---10/13MVA).

Transformer Turn Ratio (TTR) Test.

Insulation Power Factor Test.

HV/LV Bushing Circuit Test.

Measurement of Winding Resistance.

AVR Testing (under-voltage & over-voltage pick-up).

Mechanical Protection Devices (Buchholz, oil, winding, cooling fan etc).

High Voltage Testing of Connecting MV cables.

Insulation Resistance of Connecting MV cables.

Insulation Resistance (IR) Test of Auxiliary transformer (11/0.415KV-200KVA).

110V, 25A Battery Charger Test.

AC/DC Panel Test.

145KV Disconnector – Contact Resistance Test.

SF6 CB Insulation Resistance, Operating Time & Contact Resistance Test.

132KV & 11KV Surge Arrestor Insulation Resistance & High Voltage Test.

CT Insulation Resistance, Capacitance Dissipation Factor, Saturation, knee point

& High Voltage Tests.

PT Insulation Resistance, Ratio & Phase Sequence Tests.

Testing of 132KV OC/EF Relay.

High Voltage Test of Bus bars & Trolley.

Testing of Differential Relay.

Earthing System of Equipment & Fence.

As Assistant Electrical Engineer on 132KV Grid Station As Trainee Engineer in Ghazi Fabrics International Limited,Lahore One month internship with Ghazi fabrics International Limited based on following setup

• Caterpillar 3616 HFO Engine for Power Generation upto 45MW.

• GE Jenbacher - Gas Engine Model # 620.

• HRSG DDFC manufactured on Exhaust Gases – Fire tube Boiler.

• Wood Fire - HFO Boiler Utilization in case of Gas Shutdown.

• Bio-Gas plant for Mills colony utilization.

As Trainee Contract Management in NPL-(IPP & CCPP) Wartsila, Pakistan Understand the operation & maintenance of (IPP & CCPP) and update my technical skills in the area of Electrical Engineering. Following System are analyzed during training……

• Engine Control System 18V46 & MV/ HV (15/132KV) (Converteam, ABB, Siemens)

• Turbine temperature/generator/condenser, steam & water, lube-oil, vibration system.

• Heat recovery system Aalborg)

• WOIS/WISE for control display.

Perform High Voltage Engineering tests in UET, Lahore o Calibration of sphere/rod gap using its breakdown strength against gap setting. o Investigate the voltage distribution over suspension insulator string with/without guard ring. o Compare flashover voltages wet and dry for typical outdoor insulator. o Critical 50% impulse flashover voltages on 11KV insulator. As Trainee Engineer in Zephyr Textiles,Lahore

I have executed the Erection of Caterpillar Gas Engine # 03 Model 3520c of capacity 1750KW. The plant is feeding to weaving unit which requires steam for Seizing process so in this context they have also installed WHRB & Hot Water from Jacket Water recovery for Chillers. Following setup is installed for Co-generation process.

• Caterpillar 3520c Gas Engine for Power Generation upto 4500kW.

• Jenbacher Gas Engine Model # 316. (Black-Start)

• HRSG local manufactured on Exhaust Gases – Fire tube Boiler.

• Rice husk Boiler Utilization in case of Gas Shutdown.

• Synchronization with Bhai-Pheru 11KV feeder using DSE-8620 Deep Sea Electronics.



Contact this candidate