Post Job Free
Sign in

Welding Safety

Location:
India
Posted:
August 29, 2019

Contact this candidate

Resume:

RESUME PIPELINE SUPERVISOR (offshore.*il&gas)

Permanent Address:-

Sheik Asraf,

HOUSE NO: 24/67/8,

AMBUSARANG STREET, KOTAVEEDHI,

VISAKHAPATNAM.PIN CODE-530001,

ANDHRAPRADSH,

E Mail: *************@*****.*** Ph No: +91-970*******

Career Objective:

Looking for an Offshore Pipeline supervisor. Position that will allow me to heighten my career in this field.

Highlights of Qualifications:

Wide experience in plate, pipe and structural welding in offshore and shipyard

Profound knowledge of welding techniques

Exceptional knowledge of metallurgy

Proficient with metal stress fatigue methods

Skilled in design and layout procedures

Amazing ability to follow complex instructions from Supervisor & field Engineers

Immense ability to interpret blueprints and welding symbols

Outstanding ability to operate torches, forklifts and cranes safely

Professional Experience:

Offshore Pipelinesupervisor more than 16years Experience

SAFETY TRAINING PROGRAMMES:

I have Seaman’s Record Book Issued by The Bahamas Maritime Authority (Book No: LON 85358).

I have Seaman’s Record book international merchant marine registry of Belize

I have basic offshore safety induction emergency training (BOSIT).OPTI

I have STCW-95 training course in

Helicopter under water Escape techniques (HUET)

Fire prevention& Fire Fighting

Elementary first Aid

Certificate of proficiency in personal safety and social responsibilities

Proficiency in survival techniques

I have safety certificate approved by. Offshore petroleum industry training Organization (OPITO)

SAFETY INDUCTION: sea survival emergency first Aid Fire fighting&self Rescue Helicopter safety Escape (HUET)& Ebs

SAFETY HUET)& Ebs

SUMMARY OF WORKING EXPERIENCE:

Total around.16.years.Experience. Offshore field as a pipeline supervisor offshore

Pipe lay barges Fpso Moring system installation.Spm/calm buoy installation

Driven piles installation. Fpso&Spm mooring system mooring chain laying (subsea)

Mwa Base&plem installation. Tin-in spool installation (subsea) Deck instalationFabrication and assembling of JACKET&DECK.MODULES FLARE BOME. RISER CLAMPS INSTALLATION.OFFSHOREPLATFORM .UNDERWHATERSUBMARINE.SHIPBULDING&SHIPREPAIRING .offshore Drilling ship Dredging vessels. Oil storage Tanks & heat exchangers. Reactors. High pressure & low pressure vessels. Onshore offshore modules Structures. Oxygen plant piping and structures for petro chemical plant & refineries. Oil & gas pipeline offshore & onshore projects and storage tanks.

EXPERINCE in OFFSHORE subsea

A)SAIPEM Various Projects:

a)Worked as welder supervisor in saipem tongue offshore jacket insulation

Pasha -11 project Papua Indonesia 12/01/2015 to 30/07/2018.

Responsibilities:

Performed maintenance, fabrication and high pressure welding effectively.

Adhered to safety policies and participated in safety meetings.

Selected materials and equipment required for welding.

Positioned, clamped, and aligned metal pieces before welding.

Carried out vertical, horizontal and overhead welding.

Operated arc, gas-shielded arc, submerged arc and gas welding equipment.

Dismantled and reassembled parts for repair purposes.

Assembled metal parts by bolting and Assisted in determining labour and material costs for welding projects.

Reviewed welding procedures and recommended improvements.

Welded stacking assemblies, skids, stands and distribution frames.

Completed projects as per approved specifications.

Performed field operations and on-call services.

Maintained the work environment clean and organized.

Maintained professional demeanour when dealing with clients.

Developed preventive maintenance and emergency procedures.

b) Worked with SAIPEM-PETROMAR. Kizomba “B” tie-back offshore project soys yard. In Angola. (WEST-AFRICA)17-june-2004 up to 2 Dec-2004 as welder supervisor

Responsibility:

Operated arc, gas-shielded arc, submerged arc and gas welding equipment.

Dismantled and reassembled parts for repair purposes.

Assembled metal parts by bolting and Assisted in determining labor and material costs for welding projects.

Reviewed welding procedures and recommended improvements.

Welded stacking assemblies, skids, stands and distribution frames.

Completed projects as per approved specifications.

Performed field operations and on-call services.

Maintained the work environment clean and organized.

c)Worked with saipem. As a welder supervisor Kishagan filed offshore experimental oil gas & pipe rack project aktaw kuriyeq base in khazkistan. Working period.18-oct 2005 up to 12-apr-2006.

Responsibilities:

Performed maintenance, fabrication and high pressure welding effectively.

Adhered to safety policies and participated in safety meetings.

Selected materials and equipment required for welding.

Positioned, clamped, and aligned metal pieces before welding.

Carried out vertical, horizontal and overhead welding.

Operated arc, gas-shielded arc, submerged arc and gas welding equipment.

Dismantled and reassembled parts for repair purposes.

Assembled metal parts by bolting and Assisted in determining labor and material costs for welding projects.

Reviewed welding procedures and recommended improvements.

Welded stacking assemblies, skids, stands and distribution frames.

Completed projects as per approved specifications.

Performed field operations and on-call services.

Maintained the work environment clean and organized.

Maintained professional demeanour when dealing with clients.

Developed preventive maintenance and emergency procedures.

d)Worked with saipem as welder supervisor.UK Ltd for Sakhalin Energy investment Company(SEIC)Oil&gas Cables installation pip lay Barge. Offshore pipe line project in Sakhalin Island Russia (Deep Sea) working period 14-jun-2006up to 10-oct-2006

Responsibilities:

Performed maintenance, fabrication and high pressure welding effectively.

Adhered to safety policies and participated in safety meetings.

Selected materials and equipment required for welding.

Positioned, clamped, and aligned metal pieces before welding.

Carried out vertical, horizontal and overhead welding.

Operated arc, gas-shielded arc, submerged arc and gas welding equipment.

Dismantled and reassembled parts for repair purposes.

Assembled metal parts by bolting and Assisted in determining labor and material costs for welding projects.

Reviewed welding procedures and recommended improvements.

Welded stacking assemblies, skids, stands and distribution frames.

Completed projects as per approved specifications.

Performed field operations and on-call services.

Maintained the work environment clean and organized.

Maintained professional demeanour when dealing with clients.

Developed preventive maintenance and emergency procedures.

e)Worked with saipem. As a welder supervisorfor third transmission part-3 gas pipeline project in sungqla.Thailand-Malaysia. Working period.12-feb-2007up to 23july-2007.

Responsibilites:

Performed maintenance, fabrication and high pressure welding effectively.

Adhered to safety policies and participated in safety meetings.

Selected materials and equipment required for welding.

f)Worked with saipem as welder supervisor For the C.P.C. gas pipeline project in.taichung .in Taiwan. Working period 12-jan-2008 up to 29-Aug-2008.

Responsibilities:

Performed maintenance, fabrication and high pressure welding effectively.

Adhered to safety policies and participated in safety meetings.

Selected materials and equipment required for welding.

Positioned, clamped, and aligned metal pieces before welding.

Carried out vertical, horizontal and overhead welding.

g)Worked with saipem as welder foreman. For the Ledong22-1/5-1oiLgas fields Development offshore project. Tungshieo.in china.5-march-2009 up to 10-set-2009.

h)Worked with saipem as welder foreman. For the T.M.P.C. offshore Gas pipeline repair project in Palermo sassily in Italy working period 18-jan-2010 up to12-march-2010.

B) ESSAR Various Projects:

a)Worked as a welder foreman offshore subsea limited. Offshore pipe lay Barge. Kuwait gulf Oil Company. Gas and oil condensate Export project ( KGOC) Kuwait and Saudi Arab From.20/07/2014 to 23/11/2014.

b)C7 FPSO Project in ONGC Cluster 7 Field for Bumi Armada KL, Mumbai, India

(Mooring System & Mid Water Arch Foundation Base Installation). Panna new spm system installation of calm buoy, plem and Gas pipe lay project (British gas) in Bombay High India. From13/09/2013 to 21/02/2014.worked as welder.foreman

c)Worked welder supervisor .Hindustan shipyard LTD. offshore Jack up rigs submersible platform. Marine Engineering.Shipbullding&shiprepairs.Under water submarines for navy (Defence) Visakhapatnam India.

d)Worked welder supervisor Kharafi National for P.Vessel.heat Exchanger

Boiler drum and plate formed pipe fabrication. Working period.

13/11/2012 to 15/09/2013. In Kuwait

C)Worked as welder supervisor HEAT EXCHEGERS REACTORS HIG PRESSURE LOW PRESSURE VESELS.PIPEING AND EVAPORATORS.ONESHORE&OFFSHORE MODULES AND STRUCTURES.BELLELI SAUDI HAVEY INDUSTRIES AL- JUBAIL IN SAUDI- ARABIA. Working period 5-dec-2000 up to 10-oct-2003.

Responsibilities:

Performed maintenance, fabrication and high pressure welding effectively.

Adhered to safety policies and participated in safety meetings.

Selected materials and equipment required for welding.

Positioned, clamped, and aligned metal pieces before welding.

Carried out vertical, horizontal and overhead welding.

Operated arc, gas-shielded arc, submerged arc and gas welding equipment.

Dismantled and reassembled parts for repair purposes.

Assembled metal parts by bolting and Assisted in determining labor and material costs for welding projects.

Reviewed welding procedures and recommended improvements.

Welded stacking assemblies, skids, stands and distribution frames.

Completed projects as per approved specifications.

Performed field operations and on-call services.

Maintained the work environment clean and organized.

Maintained professional demeanour when dealing with clients.

Developed preventive maintenance and emergency procedures.

EXPERINCE IN SHIPYARD (INDIA)

a)ABAN Construction (Fabrication and assembling of JACKET&DECK.MODULES FLARE BOME. RISER CLAMPS INSTALLATION.OFFSHOREPLATFORM .UNDER WHATER SUBMARINE.SHIPBULDING&SHIPREPAIRING HINDUSTANSHIPYARD.visakhapatnam. India. 12-Dec-1991 up to 26-nov-1992.

PROFFESSIONAL QUALIFICATION:

I.T.I (WELDING) Provisional, National trade certificate industrial training institute. 1987-1988..

Diploma Mechanical Engineering, 1988 TO1991 INDIA.

Passport Details:

Date of Birth : 25-01-1970

Passport : T 0930055

Date of Issue : 03-05-2019

Place of Issue : Visakhapatnam (INDIA)

Date of Expiry : 02-05-2029

The above information is true and correct to the best of my knowledge.



Contact this candidate