Engineer Sarwar Murtaza

Date of Birth: October 04, 1965

Home Address: ***/*, ********* ****, ****** # 05,

Bahawalpur, Punjab, Pakistan.

Home: +92-62-228****, Mobile: +92-302-*******,

Email **********@*****.***, ****************@*****.***

Qualification;

B.E Civil Engineering Completed in January 1990, from Mehran University of Engineering and Technology Jamshoro, Sindh, Pakistan.

Professional Registration with Pakistan Engineering Council (PEC Reg: No. Civil / 12586).

Summary of Professional Profile;

I am a qualified professional Civil Engineer, have vast & versatile experience offering over twenty-seven (28) years in the area of Project Construction Management. Lead with extensive leadership and management skill and knowledge for versatile constructing high performance. A project management expert skilled in leading Construction Project Transformation utilizing project management knowledge, and management of stakeholder requirements to achieve project objectives.

A successful construction management professional with outstanding track record established in a string of successfully completed multipurpose projects such as; construction of Infrastructure Projects; High Rise Buidlings/Towers, Villas, and Office Buildings, Projects, Motorway Roads Projects, Bridges, River Barrage Projects, Hydro Power Projects and allied works, Dam Project and allied works, Irrigation Channel system Projects and allied works, Surface Drainage & Sub Surface/Tile Drainage Projects and allied works.

Current Status;

Currently, I am working as a Project Manager in Pakistan on Motorway project and looking for new challenges..

Language; English, Urdu, Punjabi and Sindhi.

IT Skills: MS Office (MS Word, MS Excel).

Key Skills;

Project Management, Experience & Exposure of FIDIC form Contracts Management (EPC and BOQ/Item rate based), Project Planning & scheduling, Contractual matters, Project Budgeting & Time Management, Risk Assessment & Management, Project Evaluation/Estimation, subcontracting, Procurement, Quality Assurance & Quality Control (QA/QC), Health Safety & Environment (HSE) Plans, and Client/ Consultant Relationship Management in the Construction Industry. Including, Post & Pre-qualifications, Bidding/Tendering, Measurement of executing & completed works, Preparation of Interim and Final Payment Applications, Financial review of Contracts, Claims Management, Price Adjustment, Variation Orders, and Official Correspondence with the Consultants and Clients regarding the Project.

Construction Experience of key Projects.

Motorway Project; Road Embankment, Subgrade, Sub base course, Aggregate Base course, Asphaltic Concrete and ancillary/allied works Concrete bored Piles, Structures such as Bridges, Culverts, Under Passes, Supper Passages, Causeways, Pre Stressed Girders, Sub & Supper Structures

Barrage Project (1.5 km long); Construction of Concrete Bored Piles, Sub & Supper Structures, Installation of Steel Sheet Piles, Coffer Dams, de-watering & un-watering System, Under Sluice, Main Weir, Head Regulator, Barrage Bridge (1.5 Km in length), Rail track for gantry crane (1.5 km in length), Pre-stress Girders, Installation of Barrage and Head Regulator Radial Gates including its Electrical, Electronic (Remote Control) & Manual Operating System and allied Works. Earthen Embankments, Excavation in River Bed and construction of Guide & Spur Banks.

Dams Reservoirs Project; Construction of Spillway Structure, Irrigation Intake Tower, Including Conduit Outlet structure, Fuse Plug & saddle Dyke. Steel Sheet Pile installation, Construction of Dam Embankment, Earth Excavation, normal soil & hard rock cutting, and including the construction of Asphaltic access roads.

Hydro Power Project (17.50 MW); Construction of Structures such as Power House, Fore-bay, Headrace and tailrace channel, Inlet, Outlet and Weir structures, Saddle foundations, Steel pipe Syphon & penstock and including the Asphaltic access roads.

Buildings Project;

Construction of High Rise/Towers/multistory buildings, single story and villas, frame structures (RCC), Load Bearing Structure, Sewerage and Disposal system, Plumbing, Electrical, Water supply, Overhead Tanks, Internal Roads & Paths, Beautification and other allied works.

Irrigation (Water & Power) Project;

Surface drainage system (1100 KM), Subsurface/Tile drainage system (250 KM) and concrete lined irrigation System (650 KM) Projects comprised of;

Construction of Concrete Bored Piles, Steel Sheet Piles installation, Sub & Supper Structures, lined Channels with Plane Concrete lining, Brick lining, Metris Concrete lining, each & every type of Pre cost Concrete lining., Bridges, Culverts, Outlets, Regulators, Concrete Piles, Aqueducts, Super Passages, Water Crossing Structures, Siphons, Out Fall Structures, Regulators, Bridges, Escapes structures, Head & cross Regulators, Junction Culverts, Roads and allied structures, and including Earthen Channels, Earthen Embankments and Earth Excavation.

.

Comprehensive Employment History

Project Manager

Company: LIMAK-ZKB (JV), Pakistan

Period: November 01, 2016 to date

Current Project: CPEC Western Route Motorway, Package-IV (Pindi Gheb to Turap 50 KM) and E-35/Package-III (Haripur to Havalian 17 KM).

Client: NHA Islamabad.

Consultant: ACE Pakistan and DOHWA Engineering Co Ltd.

Project Cost: US$ 200 Million

This Project consisting of 67-km in Length including 94-Box Culverts, 30-Under Passes, 29-Pipe Culverts12-Bridges, 08-Flyovers, 04-interchanges, and including Retaining & breast walls.

Project Manager

Company: Redco Construction Pakistan (Pvt) Limited.

Period: July 01, 2016 to October 2016

Current Project: Park One Commercial & Luxury Apartments Complex, Islamabad.

Client: APCO Islamabad.

Consultant: TPMS and MB Consulting Engineers, Karachi.

Project Cost: US$ 26 million

This Project consisting of 22 stories building/tower on plot # 01- 10th Avenue in the area of F-10/3, Markaz Islamabad.

Project Construction Manager

Company: Descon Engineering Limited.

Period: June 13, 2013 – October 30, 2016.

Project: New Khanki Barrage Project (NKBP), Wazir abad, Punjab, Pakistan.

Client: Punjab Management Organization (PMO), Punjab Irrigation Department.

Consultant: SMEC, ECG and BARQAB (JV)

Project Cost: US$ 230 Million

This Project was consisting of Barrage Bridge length 1.5 KM, Concrete Pilling work, installation of 65 no. Redial gates (each Gate 65 feet wide and 16 feet in height) and its electrification, Head Regulator of LCC Canal, 35 KM Asphalt concrete Road and allied structures, Employers Permanent Residential Housing and Office Buildings.

Project Site Manager

Company: Descon Engineering Limited.

Period: September 29, 2011 - June 12, 2013

Project: EPC, Ranolia Hydro Power Project of 17 mg. Pattan, District Kohistan, KPK, Pakistan.

Client: SHYDO (Sarhad Hydel Organization).

Consultant: AGES (Alqasib Group of Engineers)

Project Cost: US$ 39.5

Construction of 5 km asphalt Road and allied structures, Client’s residential and office buildings, Powerhouse, Weir, headrace and tailrace channel, sand trap structure, Steel Pipe syphon of 1-meter dia, Spillway, fore-bay structures, Penstock, bridges, and other allied works.

Project Site Manager

Company: Saadullah Khan & Brothers (SKB)

Period: March 01, 2011 - September 28, 2011

Position: Site Manager-Civil.

Project: Rehabilitation and upgrading of Baloki Barrage Project, Lahore, Punjab, Pakistan.

Client: Punjab Management Organization (PMO), Punjab Irrigation Department.

Consultant: NESPAK and ACE (JV)

Project Cost: US$ 39.5

The Project was consisting of Construction of new gated Spillway structures, New Head Regulator and rehabilitation of existing Regulators and Barrage, repair & maintenance of existing gates, manufacturing & installation of new gates, installation of Electronic / Electrical and manual operational system, rehabilitation of existing and construction of new residential/office buildings, Roads and allied structures.

Project Manager and Contractor’s representative.

Company: Saadullah Khan and Brothers (SKB).

Period: April 2008 - Feb 2010.

Project: Contract #. RC-7A of Rainee Canal System. In Deharki Distt. Ghotki, Sindh, Pakistan.

Client: Water and Power Development Authority (WAPDA) Pakistan.

Construction cost: US$ 20.0 million.

Consultants: BARQAB

This project was consisted of Concrete piling work, installation of Steel Sheet Piles, Bridges, Fall structures, Cross Regulators, of take structures and one (1) Head Regulator structure of the Thar Canal system (5000 Cusecs), 127 km concrete lining with PVC Geo-membrane, 328 No outlet structures, and 127 km of earthwork (Excavation & embankment) irrigation system.

Project Manager and Contractor’s representative.

Company: Saadullah Khan and Brothers (SKB).

Period: Oct-2006 to March 31, 2008.

Project: Subak-Zai Dam Project (i) Contract#. SZD-02 & (ii) Contract #. SZD-03 in District Zhob, Blochistan, Pakistan.

Client: Water and Power Development Authority (WAPDA) Pakistan.

Consultants: National Engineers Services of Pakistan (NESPAK).

Construction cost: US$ 21.0 million.

Projects consisting of Concrete Pilling work, 400-meter long and 35-meter high Dam embankment, Fuse plug, Irrigation Intake tower, steel pipe of 2- meter diameter conduit outlet, Spillway structure and allied works. Cast In-Situ concrete lining comprising of 40 Km length and allied structures such as Regulator, Falls Structures, Drainage Box Culverts, Aqueducts. Causeways, R.I Drops, Box conduit Super passage, outlets and other structures. Asphalt Road 25 km, Client’s / Employer’s permanent residential and office buildings,

Project Manager and Contractor’s representative.

Company: Khyber Grace (Pvt) Limited (KGL) Islamabad.

Period: Jan-2005 to Sep-2006

Project: Contract R-1 (A) R.B.O.D Larkana, Sindh (Pakistan).

Client: Water and Power Development Authority (WAPDA) Pakistan.

Consultants: NDC (National Development Consultants)

Construction cost: US$ 12.0 million

This Project was consisting Concrete Pilling work, installation Steel Sheet Piles and allied structures such as District Road Bridges (DRBs), Village Road Bridges (VRBs), Water Course Aqueduct (WCAs), Storm Inlets, Escape and Cross Regulator and other structures, and 45-Km length Excavation and construction of Embankment of the main drain.

Project Manager and Contractor’s representative.

Company: Sheikh Javed Ahmad Engineer & Con tractors.

Period: Feb 2002 – August 2002.

Project: Contract #.SD-999-M Mirpur Khas, Sindh (Pakistan), Operation & Maintenance Performance Surface Drainage System Mirpur Khas (Sindh).

Client: Sindh Irrigation Development Authority (SIDA).

Consultants: NESPAK and NDC Joint Venture.

Deputy Project Manager

Company: China Beijing Corporation (C.B.C)

Period: April 2000 – Jan 2002.

Project: Contract# 68 (CRBIP), District D.G Khan and DI Khan, Pakistan.

Client: Water and Power Development Authority (WAPDA) Pakistan.

Consultants: NDC HARZA and SOGRIA Joint Venture.

Construction cost: US$ 17.5 million

This project consisted of Concrete bored piles, structures such as Bridges, Head & Cross Regulators, Fall Structures, Outlet and Inlet structures, Escape structures, Underpass, Tail cluster and other ancillary structures, construction of Roads and Canal Concrete Lining (300 KM), Earthen embankments, Earth Excavation,

Deputy Project Manager

Company: China Beijing Corporation (C.B.C)

Period: Sep 1996 - March 2000.

Project (A): Contract #. FESS WBI, FESS WB2 and WB3, Bahawalnagar, Punjab, Pakistan.

Client: Irrigation & Power Department, Punjab, Pakistan.

Consultants: MMI and ACE Joint Venture.

Construction cost: US$ 46.0 million.

This Project was comprised of Concrete bored piles, Head & cross Regulators, VR Bridges, DR Bridges, Foot Bridges, Fall Structures and more than 450 No of outlet structures and Escape structures and Construction of Concrete lining (175 KM) with Geo membrane and Geo Textile, allied Structures. Diversion channels, Earth Excavation, Construction of Embankments, precast and cast-in situ concrete and brick lining, fabrication of Geo-Synthetic Material (Geo-membrane poly flex FPA, VLDPF & HDPE) and Geo-textile poly flex Ts-600/Ts-750, and Buildings, Roads

Project (B): Contract #. FESS-203, Haroonabad, Bahawalnagar, Punjab, (Pakistan).

Client: Water & Power Development Authority, WAPDA, Pakistan.

Consultant: NDC (National Development Consultants).

Construction cost: US$ 3.0 million

The Project consisted of Concrete piling work, Bridges (DRBs, VRBs, ARBs), Pipe Culverts, Underpasses, Water Course Aqueducts (with foot bridges), Fall Structures, Pipe Junction Culverts, Siphons, Inlet structures, Buildings, Roads, Excavation (bulk) above and under water, construction of Earthen Embankments of Surface drainage system, huge stone pitching / stone apron and other allied / ancillary works.

Senior Engineer

Company: China Gaungxi Corporation (C.G.C).

Period: July 1995 - Aug 1996.

Project: Contract #. T40 (AB1) Mirpur Khas, Construction of Mirpur Khas Sub Surface Drainage System, Left Bank Outfall Drainage System (LBOD), Sindh, Pakistan.

Client: Water and Power Development Authority (WAPDA), Pakistan.

Consultant: Mott McDonald International (MMI) and NESPAK (JV)

Construction cost: US$ 23.5.0 million

Projects comprise of Concrete bored Piles, Culverts and Bridges, Drainage Inlets structures, Sump houses, Manhole, RCC Pipe Junction culverts, Buildings, District Road, disposal channels & Trenching work by mechanical means for laying of the PVC perforated pipes of different diameter.

Senior Engineer

Company: IJM / IGA Joint Venture,

Period: Jan 1993 - June 1995.

Project: Contract #. S10 AB2 (A) Sanghar, Construction of Central Sangha Surface Drainage System, Left Bank Outfall Drainage System (LBOD), Sindh, Pakistan.

Client: Water and Power Development Authority (WAPDA), Pakistan.

Consultant: Mott McDonald International (MMI), ACE and NESPAK (JV)

Construction cost: US$ 40.0 million.

The Project comprises of Concrete piling work, Bridges (DRBs, VRBs, and ARBs), Pipe Culverts, Underpasses, and Water Course Aqueducts (with foot bridges), Fall Structures, Pipe Junction Culverts, Siphons, Inlet structures, Buildings, Roads, installation Excavation (bulk) above and under water, construction of Earthen Embankments of Surface drainage system, huge stone pitching and stone apron and other allied /ancillary works.

Site Engineer

Company: China Gaungxi Corporation (C.G.C).

Period: June 1990 - Dec 1992.

Project: Contract #. T10-Mirpurkhas. Construction of Mirpur Khas Surface Drainage System, Left Bank Outfall Drainage System (LBOD), Sindh, Pakistan.

Client: Water and Power Development Authority (WAPDA), Pakistan.

Consultant: Mott McDonald International (MMI), ACE and NESPAK (JV)

Construction Cost: US$ 57.0 Million.

The Project comprises of construction Concrete piling work, Bridges (DRBs, VRBs, ARBs), Pipe Culverts, Underpasses, Water Course Aqueducts (with foot bridges), Fall Structures, Pipe Junction Culverts, Siphons, Inlet structures, Buildings, Roads, Excavation (bulk) above and under water, construction of Earthen Embankments of Surface drainage system, huge stone pitching / stone apron and other allied / ancillary works.

Personal Qualities;

Always respect and care to the project team and associates.

Positive attitude and proficient towards results oriented construction.

Profoundly concentrate on the assigned job and responsibilities.

To develop better relationships with all project relevant departments.

To develop the synchronization between the project execution team and project supporting groups.

I always perform my duty honestly, diligently, punctual, hardworking, and face the boldly adverse circumstances during the execution of the project.