Post Job Free

Resume

Sign in

Manager Store

Location:
Kolkata, West Bengal, India
Posted:
August 27, 2019

Contact this candidate

Resume:

CURRICULAM VITAE

Sudipta Kumar Ghosh

Email: ac96tz@r.postjobfree.com

**, ***** *****,

P.O- Titagarh,

Kolkata – 700119,

West Bengal.

Objectives:

-To love the work I do and give my best to the organization I belong to.

-To utilize any opportunity that comes across and proves my competence.

-To give my best always and prove myself as an asset to the organization and to rise on the basis of merit.

-To pursue career in professionally driven and highly competitive environment, when I can excel with my skills and abilities while proving myself as an asset to the organization.

Personality Profile:

-High learning curve, hard working and sincere.

-Ability to deal with people diplomatically.

-Self-driven and dynamic.

-Adaptive to situations.

Career Objectives:

Seeking middle managerial/engineering assignments in an organization of high repute specially deals with Commercial Buildings, Housings & Infrastructure Sector.

Strengths:

-As a Deputy Store Manager with 16 years of exceptional track record in handling Inventory system in high end construction projects with proficiency in site management.

Education:

-B.Com (Hons), University of Calcutta, 2002 (49.5%).

-Diploma in computer education, 2003 (57%).

-Diploma in Material Management, 2016 (75%)

Professional Experience:

Company Name: Bhawani Group Oct’ 2018 to till

Position: Assistant Store Manager.

Responsibilities: as below:

-Co-ordination with the Purchase department w.r.t requisition, delivery of materials.

-Managing stores related all work i.e. Stock of materials received and issued and vis a vis consumption at site on a tally ERP Programme.

-Physical stock taking fortnightly.

-Budget deviation- i.e. deviation from BOQ to real consumption analysis.

-Quality checking of materials.

-Co-ordination with all the sites from top to bottom w.r.t stores and its ancillary work.

-Reconciliation of stock and its report.

Company Name: Primarc Projects Pvt.Ltd. Oct’ 2015 to Aug’2018.

Position: Assistant Manager-Store.

Working as an Asst. Manager-Store for 2 no’s high-rise residential project:-

Project details:

Gangetica – G+11 Two Nos. block situated at Chandannagar, consists 148 Nos. flat. Total construction area 2,15,000 sq.ft. appx.

Aura – G+9 Ten Nos. block situated at Mankundu, consists 525 nos. flat incl. a

Shopping complex. Total construction area 5,40,000 sq.ft. appx.

Responsibilities as below:

-To receive the materials ordered by purchase department (In case of decentralized system) and supplied by the vendors in a proper maintains as per the laid down procedure.

-To ensure the correctness in the quality, quantity, specifications, condition of the materials received from vendors.

-To stock the materials received from vendors properly as to ensure easy access identification, verification, handling, maintenance etc.

-To ensure proper stocking of materials by using appropriate method of care and preservation to avoid any damage and loss.

-To ensure a smooth issue of materials to the issue department.

-To ensure a favorable working atmosphere is maintained for the personnel working in the store.

-To ensure proper safety measures are taken for the safety of the store building, materials in the store and the men working in the store.

-To ensure that the store is always maintained up to date in all respects in a presentable condition.

Company Name: Supreme Infrastructure India Ltd. Oct’ 2011 to Sep’2015

Position: Assistant Manager-Store.

The project consists Residential Project [G+7] 135 Towers and [G+4]-15 Towers

Responsibilities as below:

-Indent in ERP System Party Wise. Request for Supplier’s Quotation list. Create a Purchase Order as priority basis in ERP System.

-After receiving the materials authorized the purchase Order then create a Gate entry of different materials in ERP.Then, Materials received by store personnel.

-Materials received by quality control department and also received by main store.

-Suppliers & Subcontractor’s materials are categorized verified and checked.

-Monthly stock report analysis as per the turnover vs. materials cost.

-Maintain List of vendor address, negotiation of rates, terms of vat & other condition.

-Maintain List of hired materials and companie’s own assets.

-Overall monitoring the inventory cost and Physical stock.

KND Engineering Technologies. Ltd April’ 2006 to August’2011

Position: Sr.Store In charge.

-The projects consist of 10 cell cooling Tower, hot water channel, Internal Road and other infrastructure.

Responsibilities as bellow:

-Overall monitoring of the project received the materials, after checking the materials by Quality control then it keep in record by Store. Preparation of Materials Received Book. Verification of all types of Challan, Way bills. Work inclusive of progress monitoring and preparation of programmed schedule by Consumed materials, Daily consumption report, Fortnightly Stock Report, Fortnightly Received & Consumption report and regular reporting to the superior.

-Co-ordination with Planning Dept for reconciliation the all types of consumed materials, Procurement Dept, Marketing Dept., contractor & with Local Authority along with local people.

-Overall monitoring the inventory cost, Physical stock

-Responsible for maintaining housekeeping the Field area & monitoring work for the same.

-Overall monitoring of supplier’s billing process.

Project Details:

-From April’2006 to December 2008, at pilling project in CRM area in Bokaro Steel Plant. 550 dia (2500 Pile and 1000 dia (85 no’s of Pile) in Blast Furnace area.

-From Jan’2009 to August’2010 involved in 10-cell cooling Tower project in IISCO Steel Plant.

-From September’2010 to August’2011 involved in WTP in ISSCO Steel Plant

South city Projects (Kol) Ltd. Sept.2003 to- Feb 2006

Position: Store In charge

Responsibilities as bellow:

-Received the materials, checking the challans & verified the materials.

-Create materials received book, preparation of goods received note & posting it into the ledger.

-Overall monitoring the inventory cost, Physical stock.

-Overall monitoring of supplier’s billing process.

-Prepared the stock statement report.

Project Details:

-Worked as a Store In-charge Since September 2003 to Feb 2006 with South City Project Kolkata Ltd in the field of structural's finishing work. 6 Nos of (G+14) stored residential building, S.T.P, W.T.P also in Road and landscape work.

Personal Information :

Name : Sudipta Kumar Ghosh.

Date of Birth : 10.10.1979

Father’s Name : Sri Sushil Chandra Ghosh

Sex : Male.

Marital Status : Married.

Nationality : Indian

Address : 76, Nutan Pally,P.O.-Titagarh, P.S.- Khardaha

Pin – 700119 (Kolkata), West Bengal, India.

Contact Number : 933**-*****, 842**-***** (Mob)

Languages Known : Bengali, Hindi and English.

Other Activities

-Travelling in different places

-Listening music.

Declaration:

I hereby declare that the above written particulars are true to the best of my knowledge and belief.

Sudipta Kumar Ghosh Date:



Contact this candidate