Fadi Najjar C. V.
CCaarreeeerr
OObbjjeecc
ttiivvee Obtain an engineering position focused on civil and steel structure construction, where I could build up better abilities in this line of work and assist in building teamwork and efficiency within the establishment.
PPeerrssoonn
aall ddaatt
aa
Nationality Jordanian
Birth date 11 September 1962
Gender Male
Marital status Married
Number of dependant 4
Permanent Address Amman – Jordan
Temporary Address Riyadh – Saudi Arabia
Telephone +962-*-*******
Email ********@*****.***
WWoorrkk E
Exxppeerrii
eennccee
CCC-Consolidated Contractors Company
Title: Project Engineer
General Responsibilities
June 2005
to date
In charge for civil activities include Earthwork and Underground works.
Control and direction of a multi-disciplinary, multi-national workforce
Supervision and co-ordination of multiple contractors.
Preparation of weekly and monthly reports to client and senior management.
Effect close liaisons with client representatives, and ensure compliance with client quality objectives.
Preparation, development and review of project quality plans.
Ensure project team have a clear understanding and applicable obligations.
Co-ordinate and assist quantity surveyor in producing claims and initiate negotiations with client.
Assist quantity surveyor in end forecast as required.
Procedure review and revision if required.
Review project program and update on a regular basis.
Supervised overall management of projects from conception to completion.
Ensured all operations are undertaken in a safe manner in accordance with company policies.
Specific responsibilities
In charge of all infra-structure civil activities such as earthworks including all excavations and backfilling also underground concrete structures such as culverts, Oil interceptors, Pump stations, Manholes, Valve chambers…etc.
In charge of all civil activities related to Oil and Gas projects such as Pipe racks Precast or cast in situ, sumps, substations, heavy equipment foundations.
In charge of all steel structure activities such as erection, bolt tightening, sheeting, walk ways, stairs, grating, handrails and all welding related to the structure.
In charge of all steel structure bridges connecting buildings or pipe racks carried by mechanical or static bearings.
Post-tensioned road bridges.
Piling under buildings or under road bridges.
Pre-cast and cast in situ under roads culverts.
Projects Executed
The Riyadh Metro constructed by joint venture of four companies BACS
(Bechtel, Almabani, Siemens and CCC) is a rapid transit system under construction in the city of Riyadh. It will consist of 6 metro lines spanning a total length of 176 kilometers, with 85 stations. The project will cost $22.5 billion to build. It is scheduled for a light opening in 2019, and the full network is expected to be fully operational in 2021
Jazan Reftnery & Terminal Projects (North Tank Farm And Loading Arms Facilities & South Tank Farm Facilities) JRTF – Jazan, Saudi Arabia. The EPC Package 4 Northern Tank Farm of the Refinery and Marine Terminal Jazan project is to develop the detailed design, procure, build, commission and support the start-up of the North tankage, blending system, refinery effluent treatment system, truck loading facilities and fire training area of the Jazan refinery. The Package 5 Southern Tankage is for the crude tanks 1-7 and crude tankage support facilities. CCC is responsible for the construction activities, precommissioning and commissioning assistance and assistance during performance testing. The client is Saudi Aramco and the main contractor is Petrofac Saudi Arabia limited.
WASIT Gas Plant Project working under SK Engineering & Contracting main contractor of Aramco, the project includes Pipe Racks, Buildings such as Substations & PIBs, underground utilities and Structures, sheet piling, stone columns, Paving & Equipment Foundations.
PSF Ras AL Khair Aluminuim Smelter Project ( MA`ADEN - BECHTEL ) as sub-contractor working under Saudi Arabian Bechtel Company (main contractor) our scope is the Process Smelter Facilities such as the warehouse, maintenance building, substations, furnace… in charge for all civil and steel structure activities.
PNUFW Princess Noura University for Women in Saudi Arabia (Riyadh). The biggest university in the middle east, built on an area of more than 8km2,more than 400km of underground piping with more than 13 networks of sewer and supply of water and gas.
RHA Rass Al-Hadd project in Oman. A project consist of roads and culverts and post-tensioned bridges including Concrete piling.
KGPP Khurasaniah Gas Plant Project ( TECHNIP & BECHTEL ) in Saudi Arabia (Aramco). A multimillion fast track project for producing oil and gas, one of the biggest in the middle east, consist of 300,000 cubic meter of concrete and more than 60,000 tons of structural steel Babtain Industrial Company
Riyadh Saudi Arabia
May 2003
June 2005
Title : Senior Structural Engineer
Managed affairs in the company including the production of steel, site supervision, preparing production plans and contracts and cost control estimation concerning projects.
Co-ordination and preparation of project close out reports.
Maintaining close liaison with quantity surveyor/commercial management. Projects Supervised
Fabrication and installing of all steel structure in Salam park.
Steel works for Al-Rashed company in Al-Khobar including steel ladders, passages for maintenance,handrails and cantilevers about 10000 m2.
Fabrication and installation of steel for Granada shopping mall with Saudi Constructineers Company including mezzanines, frames, towers, ladders, stairs, handrails,and guardrails.
Saedan Group
Riyadh - Saudi Arabia
May 2001 - May
2003
Title : Site Manager
Execution of steel structure factories, halls and other heavy steel projects.
Directed, supervised and managed several steel constructions inside and outside of Riyadh.
Responsible for the production of steel structure factory.
Execution of any related concrete works concerning projects
Arranging the production plan for any new steel products.
Manufacturing of steel and stainless steel tanks, silos ...etc.
Preparation production plan using primavera software.
Preparation of contracts and cost control concerning structural projects.
Working on structure design concerning steel and concrete projects using stadd software.
Risk analysis-development review and management of procedure/ schedule.
Review and agree project measurement, cost assessments, and monthly evaluations.
Basic important projects executed.
Supervised the installation of multistory fire protected building of Shmaissi Hospital.
Fabricated hot rolled heavy steel structure building for Al-Ehsa municipality with free span of 40m and area of 2000m2.
Fabricated different shapes of canopies for Obaikan Company such as 1000m2 pools, 1000m2 playgrounds,1500m2 celebration hall and parking.
Fabricated high light poles.
Fabricated multistory buildings up to 6000m2 for Sheikh Hamad in Sulai with complete site works supervision and execution including foundations, tie beams, concrete floor slabs,brick walls,erection of steel works and delivering complete project of 6000 m2.
Fabrication and installation of heavy steel works for grain silos in Riyadh with Saudi Weimer Company which includes mezzanines, towers, bridges, machine basis, wheat flour silos of more than 1000 tons.
Fabrication and installation of heavy hot-rolled sections for Yamama Castle in Riyadh with Saudi Oger Company which included mezzanines and multistory buildings.
Fabrication and execution of steel works of Salam Castle in Jeddah with Saudi Oger Company which included heavy machine basis, steel supporting roofs, car parks etc.
Najjar Industrial Company
Amman – Jordan
Title: Civil &Structural Senio;r Engineer .
Responsible for the daily production activities of a steel factory.
Executed,manufactured and installed steel structure establishments in and outside of Amman.
Hired,trained and supervised more than 300 technicians. From 1995 – 2001
Directed, supervised and managed the construction of sky-walks, space frames and other steel constructions,such as Astra plasa,Jordan Investment Warehouses, freezones' Iron Warehouses.
Manufactured fuel tanks under Iso 9000 standards. Elba House Company
Baghdad - Iraq
Title: Project Engineer
Supervised the extension and renovation of air force basis.
Coordinated quality control efforts during the manufacturing of steel structure
& buses.
Project executed
Execution of renovation and extension of Abu Obaida air force including concrete paving, concrete buildings, steel structure hangars for airplane maintenance and Installation of gantry & overhead cranes. From 1994- 1995
Najjar Industrial Company
Amman –Jordan
Title: Civil Engineer
Conducted and supervised several housing projects.
Worked on design plans for several housing projects and villas in Amman using Stadd software.
Used autocad in structural drawings.
Basic important projects executed
Several concrete housing projects with areas of 500 m2.
A 2000 m2 gymnasium hall in Mafraq involving both steel and concrete structures.
Executed 1000 m2 steel structure indoor athletic courts.
Executed two 900 m2 swimming pools, one of which featured a sliding roof for winter pool.
Executed 3000 m2 pipe factory warehouses.
Executed 6000 m2 warehouses for the Jordanian Water Authority.
Executed 1000 m2 warehouses for Coca Cola Company.
Executed steel structure management buildings for the Jordanian -Iraqi Border Center.
This project included 3000 m2 steel umbrellas.
Executed brick roof for The Prime Ministry Head Office.
Construction of parking lots for the Potash Company which included asphalt. 1987- 1994
SSkkiillllss
Primavera
AutoCAD
Excel
Images-3D
WinWord
LLaanngguuaa
ggeess
English - Excellent
French - Good
EEdduuccaatt
iioonn
Jordan University 1980 - 1985
DDeeggrreeee
B.A in civil engineering, high rise buildings, steel and concrete constructions. CCaatteeggoo
rryy CConstruction and civil engineering
CCaarreeeerr
lleevveell
Manager of staff
NNoottiiccee
ppeerriioo
dd Not required