CURRICULUM VITAE
JAKIR HUSAIN
Instrumentation Technician (senior)
Contact No: - India +91-706*******
E-mail- ********@*****.***
CAREER OBJECTIVE
To work for an organization that offers career growth and a chance to achieve goals through persistence and hard work where I can utilize my current skills and potential for organizational as well as personal growth. A Dynamic Instrumentation professional with more than five years’ experience in refineries, powerplant projects in Gulf countries and in India.
ACADEMIC QUALIFICATION:
High School(10th)
Passed from U,P. board ALLAHABAD in 2005
TECHNICAL QUALIFICATION:
NATIONAL TRADE CERTIFICATE (I.T.I) 2007
Instrumentation from RANCHI JHARKHAND
WORK EXPERIENCE: 2year Gulf + 5 year india
Client Name : SAUDI ELECTRICITY COMPANY
4 Company Name : Al Toukhi co. for industry trading & contracting (2 year)
SITE SUPERVISOR (14 June 2016 to 15 June 2018)
Instrument & control (I & C)
Hail power plant KSA
3 Company Name : National Construction Co. Pvt. Ltd. (2year)
Foreman (03/04/2013 to 30/12/2015)
Instrument & control (I & C)
I.P.C.L Baroda Gujarat
2 Company Name : AARKAY INSTRUMENTS Co. Pvt. Ltd. (1year)
Instrument tech. (05/01/2011 to 12/11/2012)
SHAH AND NAHAR INDUSTRIAL ESTATE
S.J marg lower parel BOMBAY 400013
1 Company Name : SUPERTECH INSTRUMENTATION SERVICES (I) Pvt. Ltd. (2year)
Instrument tech. (0/07/2008 to 15/09/2010)
HALDIA REFINERY LTD. KOLKATA (WEST BENGAL)
DUTIES & RESPONSIBILITIES:
Proper procedures, standards and correct testing equipment’s and test voltage and pressure are being followed in doing the leak testing, IR test and other instrument calibration activities.
Instrument installation and calibration as well as functional test of instrument conform to its data sheet.
Earth continuity test, insulation resistance test and correct circuit connections in all construction wiring.
Involve in a loop test package.
Installation and layout of cable trays, raceways, conduits, instrument stanchion and supports.
Termination and fixing of multi-core cables in junction boxes.
Layout and installation/fixing/dressing of multi-core and single pair cables.
Installation of instrument junction boxes and auxiliary terminal boxes.
Installation of field instruments based on instrument installation and hook-up details.
Calibration and re-ranging of smart transmitters/field instruments by Hart or BRAIN Terminals to reflect instrument datasheet values and ranges.
Wiring and termination of field instruments from smart transmitters & sensors (pressure, flow, level, temperature),solenoid valves and actuators, control valves, MCC relays, frequency drives, signal transducer, emergency shutdown valve and fire & gas systems.
Installation & Testing of Fiber Optic Backbone from Control Room to Potable/Firewater Tank Area Main Control Room.
Bench calibration of temperature, pressure gauges and indicators.
Loop-checking and continuity testing of instruments based on prepared loop drawing packages and schedule.
Signal testing and simulation from field instruments to the PLC/DCS in the auxiliary or main control rooms.
Checking of instrumentation support, process lines/hook up tubing, marshaling cabinet all electrical & instrumentation equipment installed on site which is coverage of inspection.
Assures that all impulse line installations are correct according to its tapping point and conforms to its service line.
Witness/Inspection for Leak Tests of Impulse Lead Piping/Tubing for Pressure, Flow, Level transmitters and Pneumatic lines.
Checking the loop folder attachments prior to loop testing.
Work with project engineers for as built drawing
PERSONAL DETAILS:
Passport No. : L8981075
Expire Date : 04/05/2024
Date of Birth : 13 JUL 1990
Gender : Male
Marital Status : married
Father’s Name : CHHOTE KHAN
Permanent Address : Vill- Derak Post- Bah Distt- Agra (U.P) INDIA 283104
Nationality : Indian
Interest and Activities : playing game
Languages Known : English, Hindi, and Urdu
DECLARATION:
I hereby declare that the information furnished above is true to the best of my knowledge. I assure that I will adapt to the organizational culture and will put in my best effort with zeal and enthusiasm to achieve the said goal in the specified time frame. I also assure that the interest of the organization will always be paramount and above self.
DATE: - / /
PLACE:- JAKIR HUSAIN