Kunal Dahiya
**** ***** **, ******, ** - ***** Phone: +1-682-***-**** Email: *************@*****.***
EDUCATION:
LAMAR UNIVERSITY Beaumont, TX Aug 2015 - Dec 2016
Masters of Engineering in Industrial Engineering (Academic Scholarship)
MANAV RACHNA INTERNATIONAL UNIVERSITY
Haryana, India Aug 2009 – June 2013
Bachelors of Engineering in Mechanical Engineering
SKILLS:
PRODUCTION
Six Sigma Green Belt, Time Study, Lean Manufacturing, Time Study, Statistical Process Control (SPC) time study, Video Analysis, CAPA, NCR, DHR, DMR, MES, MIS, PM.
SAS & STATISTICAL TOOLS SAS/STAT, SAS/ACCESS, SAS/GRAPH, SAS/CONNECT, SAS/ASSIST, SAS/PLOT, SAS/MACRO, SAS/SQL, SAS/ODS, Excel, Arena – Simulation, Pivot Tables, Design Expert.
DESIGNING & QUALITY
Auto CAD, PRO-E, GD&T, Design Control, QSR ISO13485, Good Documentation Practices.
WORK EXPERIENCE:
INDUSTRIAL ENGINEER Zimmer Biomet Wilmington, Delware Jan 2017 – Mar 2019
QUALITY IMPROVEMENT
• Performed production process inspection and tests for performance characteristics and their adherence to specifications to reduce the gauge rejection.
• Compile and evaluate statistical data to determine quality and reliability of the inspection methods.
• Create, revise, post, and obsolete visual aids and standard work instructions, SOP’s for making the job operations complaint with FDA regulations.
• Performed EQ and IQ for 5 axes machines.
• Quality improvement by evaluation of bending operation. Scrap reduction by 28- 35%.
• Employment of paperless Manufacturing Execution System using Camstar to improve traceability and quality at each job step in process.
PROCESS DEVELOPMENT
• Modified the preventive maintenance instructions by adding coolant lines to clean chips out of machine in CNC Mills.
• Changed the material of probe to harder material and set a limit point on the Y-axis to prevent probe crashing into the holding fixtures.
• Designed and modified the Value stream map for Cells resulting in more accurate and higher production and tracking of MSP.
• Study time, motion, methods, or speed involved in maintenance, production, and other operations to establish standard production rate or improve efficiency.
• Design new equipment or materials or recommend revision to methods of operation, material handling, equipment layout, or other changes to increase production or improve standards.
• Revised the labor routing in required work cells to improve efficiency and productivity.
• Revised CNC program for CNC Machines by adding a Chamfer tool to the process of Machining for parts reducing scrap by 40%.
QUALITY ENGINEER Konark Engineering Delhi, India July 2013 – July 2014
QUALITY IMPROVEMENT
•Developed an Electronic Kanban system to manage inventory of raw materials that reduced the Raw Material Inventory by 46%.
•Instituted Visual Management boards that provided production transparency and reduced set up time by 50% for each setup.
•Reduced changeover time by 50% by building and storing "changeover carts" that contained all tools and change parts at point of use.
• Modified an assembly line using Poka Yoke (Mistake Proofing) that improved quality and improved productivity on the assembly line by 43%.
PROCESS DESIGNING
• Designing and implementation of production equipment installation and maintenance plans.
• Designed a manufacturing Cell that reduced Work-In-Process by 75%.
• Evaluated mold process changes to reduce production process waste.
INTERN Bharat Gears Ltd Haryana, India July – Dec 2012
PRODUCT DESIGNING
• Experienced in Spiral and Hypoid Ring Gear and Pinion Productions Process, Cellular Production, CAD Design, CNC.
• Designed and Updated Product Drawings and basic interaction with ISO 9000 and 14000 quality systems.
• Helped in making and updating Process Flow Chart for Deburring, Face Milling and Face Hobbing machining.
PROCESS IMPROVEMENT
• Collection and Evaluation of Cycle Time and Lead Time keeping for different machining processes.
• Implemented Lean Six Sigma, Statistical Process Control and 5S tools in mechanical maintenance department.
• Implemented recommendations on the manufacturing floor to refine processes. Performed statistical analysis using SPSS on Made-to-order and engineer-to-order parts.