PERSONAL DETAILS
Name
: AAN SUN HAJI
ID Number
: 3301140209720001
Place / Date of Birth
Address
: JL. BLIMBING RT.007/003 MENGANTI KESUGIHAN CILACAP
:
Nationality
: INDONESIAN
Marital Status/ No. of children
: MARRIED
Sex (Male / Female)
: MALE
Age
: 47
Blood Group
: -
Home Telephone
: -
Mobile
Email Address
: ***********@*****.***; ************@*****.***
EDUCATION
University of Muhammadiyah Magelang, Indonesia
COURSE AND TRAINING
HSE TRAINING
Performing Autority (PA) Training Offshore
Years of experience
: 17 Years
Employment Experiences (starting with current employment)
Company & Designation
From
1. Company: PT. Artha Envirotama
2018
To
Current
Designation: Site Manager – Waste Water Treatment Plant Modification Pump and installation Project -
Bali- Indonesia
Job description:
-Water and wastewater treatment plant facilities planning
-Condition assessment of water and wastewater treatment plant facilities and lift stations.
-Ensure technical coordination with all other parties involved.
-Guarantee implementation of HSE rules and best practices.
-Prepare SoW, perform bid evaluations of proposals, support for purchases, sub-supplies, production, field operations and auxiliary activities.
-Monitor subcontractors’ activity.
2. Company: PT. Erraenersi Konstruksindo ( ENERKON )
June 2014
To
March 2015
Designation: Lead Piping / Pipeline Engineer Offshore
Job description:
Check and Approval Document Procedure Pipeline Offshore Installation and analysis project main
scope:
-Piping Design Basis and Philosophies
-Line List & Tie In List
-Pipe Stress Analysis
-Data Sheet for Valve ( Gate, Globe & Check)
-Data Sheet for Specialty Item
-MTO
3. Company: PT. Pertamina Hulu Energy (PHE ONWJ)
2013
To
2014
Designation: Sr. Pipeline/Piping Engineer Offshore
Job description:
Check and Approval Document Procedure Pipeline Offshore Installation and analysis project main
scope :
-All document analysis and Procedure to 16” pipeline installation 10 km of MMF to LPRO platform.
-All document analysis and Procedure to 16” pipeline installation 0.7 km of KLA-KLB Platform.
-All document analysis and Procedure to 4” pipeline installation 1 km of KLA-KLB platform.
-All document analysis and Procedure to 12” pipeline installation 10 km as well at its riser installation at LPRO platform side and 2.7 km of 12” pipeline replacement LESA-KLB platform
-Technical aspects related to the pipeline Hydro testing and Pre-commissioning activities.
-Design of the temporary items to be pre-fabricated for the execution of the Hydro testing and
-Pre-commissioning operation and follow up the fabrication process.
4. Company: PT. Timas Suplindo
2013
To
2013
Designation: Lead Piping / Pipeline Engineer
Job description:
-Ensure that the technical competence of Piping Offshore at construction
-This will be generally be achieved by applying the checking & approval procedure for all
-created documents, & calculations.
-Provide technical assistance to Pipeline Onshore personnel as required. This will include
-developing the knowledge and skills of the Piping personnel, including mentoring.
-Ensure as far as practically possible all assigned work is carried out in compliance with agreed
-budget and schedule.
Prepare engineering and construction scope for both man-hours and equipment estimates and
-assist in the review of proposed schedules.
-Ensure that results of any development work are fully utilized in Piping activities
-Provide technical assistance to other disciplines as required.
-Producing cost effective designs that are fit for purpose and safe.
5. Company: PT. Singgar Mulia 2013 To 2013
Designation: Lead Pipeline Engineer
Job description:
Lead Pipeline Engineer undertake Pipeline FEED and Detailed engineering design work as part of the pipeline team on project Petro china indonesia 16” Pipeline Onshore process gas Project 25 km Reporting to the FEED Pipelines Project Manager. Develop and prepare pipeline design reports, specifications, philosophies, data sheets etc. Possible requirement for site visits to Petro china Indonesia site area jambi - Sumatra .Pipeline design calculations pipeline installation :
-Wall thickness, on-bottom stability,
-Free Spanning, Expansion Analysis,
-Upheaval Buckling,
-On-bottom stability,
-Rock dumping calculations,
-Dropped Object Impact,
-Catholic Protection design calculation.
-Design Reviews of design consultant documents.
-Developed new CP design sheet for optimization of anode requirement.
-Exposure to flexible pipes, manufacturing methods and modeling.
-Review of Design consultants design reports, pipeline specifications, & design drawings
-Exposed to Preparation of Pipeline Design Basis.
Computer Knowledge (Starting with advance knowledge to basic)
Caesar II
PDMS Review 6.2
Auto-CAD v2000 – v2018
Language Knowledge (Please state fluent/fair)
Bahasa Indonesia - Fluent
English - Fluent
I certify that the information completed above is true and correct and authorise the company to check information relevant to my application.
Furthermore, I agree to undertake a pre-employment medical and/or drug testing as required by the Company. (Your confidentiality will be assured by the Medical Practitioner.)