Resume

Sign in

Power Plant Engineer

Location:
Jeddah, Makkah Region, Saudi Arabia
Posted:
August 07, 2019

Contact this candidate

Resume:

NAME: ALVI MUBASHIR JAMEEL Senior Civil Engineer

ac90k7@r.postjobfree.com +966-********* skype: ac90k7@r.postjobfree.com

LinkedIn profile: https://www.linkedin.com/in/alvi-mubashir-b6605a106/

To work for a position that gives an opportunities to perform with innovation which will enhance skills and strengths in conjunction with company goals and objectives.

SYNOPSIS: Civil Engineering Graduate having 20 Years work Experience of in the Field of Chemical Plants, Refineries, Oil Gas, Power Plant Projects, Good exposure to civil and Structural Utility Works, Achieved the best standards of Industrial building construction, A skilled communicator with proper relationship management & interpersonal approach, Good Exposure to EHS Group Guidelines/ Guidance Notes and local regulations.

SUMMERY:

CURRENT LOCATION: Currently working on Construction of Jazan Industrial City Phase-II for Saudi Industrial Property Authority (MODON).

EDUCATIONAL QUALIFICATION: Bachelor’s Degree in CIVIL ENGINEERING from AURANGABAD with DISTINCTION in year 1998 from MGM`S college of Engineering Nanded Maharashtra India 431005

ACHIEVEMENT’S RELATED PROJECTS:

OIL and Gas: Construction of Cross Country Pipeline for LNG for GAIL and GSPL at Tractebel India Pvt Ltd

Heavy Industrial construction / project Factory Construction for ARAMCO pipe manufacturing in Dammam

Turbine Package of Atomic Power Project;

Green Field Project: Construction of Carbon Black Plant at Phillips Carbon Black Limited; Vietnam Emulsion Project, Vietnam and India at Rohm and Haas India Pvt ltd,P S F Project for Bombay Dyeing & Mfg. Co. Ltd.

CORE COMPETENCIES

Project Management: Managing civil/structural/architectural components for the project, completion on time by leading all construction & managing all long lead items delivery efficiently.

Resource Planning & Control: Managing entire execution work of big projects by Coordinating with the management and contractors for the progress of the project and timely completion of the project construction.

Site & Construction Management: Execution of Reinforce Cement Concrete and Steel Structures for Plant Building and Non Plant Building Various Structures.

Development and Utility Works

Area Development by Construction of Utilities with Standards of MODON, Roadworks and Drainage system for Industrial areas. Construction of STORM, SEWERAGE and POTABLE WATER NETWORK.

EXPERIENCE

Louis Berger, Jazan Saudi Arabia Designation Utility Engineer Civil (April2015 – Continue)

Project: Construction of Jazan Industrial City Phase II for Saudi Industrial Property Authority (MODON)

Supervision and coordination of the construction of various networks; Storm, Sewerage and Potable water

Assisting and monitoring the performance of the construction team of Assistant Engineers, inspectors, surveyors and materials teams by Leading the construction supervision team. Identifying specific quality issues and proposing appropriate solution to Contractors. Coordinating with all concerned parties on all construction (and design) issues, attended weekly meetings and monitor the Contractor’s performance. Assess progress on site and report to be submitted to the client.

Coordinate (as necessary) all utility matters between contractors and all concerned Client.

Monitoring submittal review and approval of shop drawings, material submittals.

GROUPFIVE PIPE SAUDI, Dammam Saudi Arabia As: Senior Engineer Civil (July2013- March 2015)

Project: Construction Of New Plant Factory for Pipe Manufacturing- Expansion Project and New Factory for pipe manufacturing at Dammam Industrial city 2, managed by MODON.

Construction Management for work from client side. Executed scheduling of work by communication with equipment suppliers and civil contractor. Constructed industrial structure, Pipe mill, welding machines platforms, beveling machine foundations, Hydrotester tanks and all Utility area.

Development of surrounding roads of plants as per MODON Standards and approval

Providing support in preparing documents to submit to MODON and SIDF

Aarvi Encon Pvt Ltd Power Project Designation Senior Consultant – Civil (Aug 2011 – June 2013)

Project: Larsen & Toubro installing turbine island package for two new 700-MW capacity units for Nuclear Power Corporation of India Ltd (NPCIL) for Rajasthan Atomic Power Plant at Rawatbhata near Kota, Rajasthan

Project include Construction of the Reactor, Turbine, Control Service, Reactor Auxiliary, Diesel Generator, Spent Fuel Building, Ventilation Stack, Area drainage,Electrical Building -substation building, control building,Turbine Building, TG Foundation, Pipe Cable Bridge and Access Bridge, Transformer foundations and Trenches Road Drainage

RCC Building and facilities and other miscellaneous Structures

• Executed planning, scheduling, conducting and coordinating the technical and management aspects

• Completed no of small projects with different vendors for petty works a part of engineering project.

• Conducted Client/contractor meetings and resolved Client/engineering and management project issues.

Al-Marai Company, Alkharj KSA Designation: Project Engineer (From Des 2009 – July 2011)

Project : All structures in Dairy Industry project ; Small works for CPP on regular basis ; Main Process Areas,Milk filling Area,Zabadi and Laban ( Crude ) Filling area ; Blow Moulding Expansion / Modification Project, ETP / STP project ;Refrigeration Upgrade project

Facilitate the definition of projects scope, goals and deliverables; supervise all company projects and ensure that the workmanship standards are achieved; Track project deliverables by providing direction and support to project team. Quality assurance,Present reports defining projects progress with valve addition by technical solutions ; Project evaluations and assessment of results ;Prepare and submit report to the Line manager for work progress status on a regular basis and as required.

Rohm and Haas (India) Pvt Ltd Mumbai As: Senior Civil and Strut Engineer (Nov 2007 – Oct 2009)

Project: Vietnam Emulsion Project, Vietnam

Taloja Emulsion Plant Extension Project, Mumbai Chennai Emulsion Plant extension, Chennai

India Technical Center, Mumbai

Duties Performed: Implemented scope of project Civil, Structural, Architectural Component Specifications, Implemented Civil &Structural portion of project for Schedule, cost and functionality. Controlled on Engineering Consultants / Contractors for timely Project Implementation, timely project completion & handover. Ensured desired construction Quality, Safety.

Phillips Carbon Black Limited, Mundra, Gujarat As: Manager Construction (Feb 2006 – Oct 2007)

Project: Carbon Black Plant and Power Plant construction (Crown Project)

Duties Performed: Constructed number of super specialty components of Carbon Black Plant. Steam Turbine Building, Air Cooled Condenser, Sub Station Building, Co Boiler Structure, Product Storage Area ( Silo ),Reactor and Dryer, Quench Tower, Bag Filter, Tank Farm ( CBFS Area ),Ware House; DM Plant; Workshop; RW / FW Reservoir and Pump House

Tractebel Engineers and Constructors, Gujarat As: Asst Manager Construction (Nov 2003 – Jan 2006)

Project : BJPL Project for GSPL :The project includes the construction of 30” pipe line of about 508 km length from Bharuch to Jamnagar, Gujarat & DUPL Project for GAIL :The project includes the construction of 30” pipe line of about 483 km length from Dahej Gujarat to Uran in Maharashtra

Duties Performed: Executed Sectionalizing Valve station, Dispatch and Receiving stations Foundations for Launcher, Metering skid and other static equipment Plant and non-plant buildings and foundations.

Aker kvaerner Power Gas, Dahej, GUJARAT As : Principal Engineer (June 2001– Oct 2003 Project : Construction of PTE and PTFE Plants :

Duties Performed :The scope includes construction of Pipe rack having,Dyke wall, HRSG foundation, Blow down pit, OWS pit, Sub Station Building, Executed work in RCC and Structural work,Platform at various levels Checked BBS submitted by contractor along with RA bills as per approved drawings and revisions .Maintained quality by implementing Q A plan which approved by contract all test and pour card, controlled by proper Updation of progress reports.



Contact this candidate