Richard Maxey

Sr. Control Systems / Instrument Engineer

832-***-**** • 14520 Memorial Dr. M209, Houston, TX, 77079 • ac8z9r@r.postjobfree.com

SUMMARY:

• Experience includes Control Systems/Instrument engineering of Onshore, Offshore, Oil/Gas, Petrochemical, Chemical, Midstream and Downstream facilities.

• Experience includes years working in plants doing maintenance engineering/design, revamp and debottlenecking, explosion rebuild, hot DCS cutover, commissioning, start-up and project site visits.

• Experience includes managing as Lead Instrument Engineer project activities such as estimates, planning, scheduling, progress reports, weekly meetings and contributions to P&ID, HAZOP and Safety reviews.

• Accomplishments include engineering documents such as specifications, datasheets, control narratives, instrument indexes, I/O lists, alarm summaries and instrumented package equipment reviews.

• Accomplishments include development of design documents such as loop, location, detail, wiring, schematics drawings, BOM’s, and vessel level sketches.

• Accomplishments include the specification of DCS/SIS system including communication network architecture, communication cabinets and networking devices.

• Proficient in selection & specification of flowmeters, control valves, transmitters and other instruments.

WORK EXPERIENCE:

Parsons, Houston, Tx. / Richmond Ky. (Jan 2, 2019 – March 18, 2019) Sr. Control Systems Engineer

(Project; SPR-LE2/BGCAPP)

As a Sr. CSE Engineer on SPR-LE2, recent contributions include the creation/checking of field instrument datasheets. Other activities include reviewing and updating instrument specifications to current industry standards and codes.

As the Sr. Instrument Engineer on BGCAPP, activities engaged include creating a manhour estimate and document deliverable list to a large project revision to a munition’s chemical agent removal plant.

AJM Consulting, Houston, Tx. (Dec, 2017 – Sept, 2018) Sr. Communications Engineer

As a Sr. Engineer, I successfully contributed to the engineering of local fiber optic and tele-communication sites. This involved designing DC power systems as well as other systems in local tele-communication shelters. More specifically tasks included, purchasing, procuring and engineering radio and other ancillary equipment to facilitate telecommunication, data and texting.

DOW Chemical, Houston, Tx., (May, 2015 – Oct, 2017) Sr. Control Systems / Instrument Engineer

Poly 5 & Poly 6 – Polyethylene – Freeport TX., (Polyethylene Plants - EPC)

As a Sr. CSE Engineer, accomplishments included benefiting the project concerning man-hours and schedule by assisting and expediting instrumented package equipment documents purchased by Mechanical. This was also accomplished by working directly with the Equipment Suppliers regarding functionality, specifications, codes, standards and constructability. In addition, other Supplier documents such as narratives, instrument indexes, manufacturer/model numbers, instrument ratings, shipping status (installed/loose), air & power requirements, wiring and installation details were reviewed and modified when required. Some of the instrumented packages included, but are not limited to, compressors, boxing assembly lines, water treatment, and material handling equipment. There were thirty plus packages.

While at DOW I also successfully communicated information required by DOW’s “High Value Center” to complete wiring schedules (via SPI), which included checking them before construction issue. In addition responsibilities included creating CADD drawings and/or sketches for complex wiring and installations not delegated to “High Value Center”, to insure that Construction could install complicated package equipment efficiently and correctly. Other successful activities included interfacing and communicating with the Electrical, Piping, Vessels, Mechanical and the Process disciplines face to face, email, phone and weekly meetings related to issues concerning motor control schematics, instrument piping connections, level instruments connections, package equipment instrumentation and process data required for instrument and valve selection. I also successfully assisted construction and commissioning through project completion.

Ventech Engineers, Pasadena, Tx. (June, 2011- April, 2015) Sr. Lead Control Systems / Instrument Engineer

Dakota Prairie Refinery – Crude Refinery – North Dakota, (Crude, Naphtha, DHT Hydro-treater, HGU Units - EPC)

While at Ventech, accomplishments that greatly benefited Ventech included saving many hours and schedule by helping to implement a more efficient process of procuring instruments. As a result of timely delivery and installation of all instrumentation to skids they were completed and shipped either early or on schedule. This project was completely built locally on skids and shipped to the site. Contractual incentives were achieved as a result of this accomplishment combined with similar efforts of all disciplines.

Accomplishments included creating and maintaining the Project Estimated Instrument Man-hour Report, Engineering Man-hour Summary Report and the instrument schedule. Other activities included delegating and participating in the completion of the DCS/SIS system, datasheets, requisitions, cause & effects and narratives. Activities also included P&ID development including contributing to project P&ID reviews.

Accomplishments also included the selection & specification field instruments.

1990 to 2011

(KBR projects from 1990 to 2011 below)

(2010 – 2011) Sr. Lead Control Systems / Instrument Engineer

KBR Inc. - Aramco, Yanbu – Export Refinery – Saudi Arabia, (EPC - Utilities)

As Sr. Instrument Engineer, accomplishments included development of P&ID, datasheets and all other instrument deliverables.

(2008 – 2010) Sr. Lead Control Systems / Instrument Engineer

KBR Inc. - Sonagol – Hydrocracker – Angola, (EPC - Hydrocracking unit)

As Sr. Instrument Engineer, accomplishments included development of P&ID’s and instrument datasheets and specifications.

(2007 – 2008) Sr. Lead Control Systems / Instrument Engineer

KBR Inc. - Aramco, Ras Tanara – Utilities – Saudi Arabia, (FEED - Process, Off-site and Utilities Units)

As Sr. Instrument Engineer, accomplishments included estimating and scheduling project man-hours and deliverables as well as development of P&IDs, datasheets, specifications and summaries.

(2006 – 2007) Sr. Lead Control Systems / Instrument Engineer

KBR Inc. - Total/DSME – FPSO – Angola, (EPC - Offshore FPSO)

As Sr. Instrument Engineer, accomplishments included checking datasheets, specifications and requisitions as well as cause and effects.

(2005 – 2006) Sr. Lead Control Systems / Instrument Engineer

KBR Inc. - Chevron, Escravos, - GTL Terminal – Nigeria, (FEED - GTL facility)

As Sr. Instrument Engineer, accomplishments included P&ID development, and creation of cause and effect diagrams, alarm summary, instrument index and narratives.

(2005) Sr. Lead Control Systems / Instrument Engineer

KBR Inc. - Valero – NexOctane Unit – La Porte, Tx., (FEED - MTBE to NexOctane revamp)

As Sr. Instrument Engineer, accomplishments included creating the EPC estimate, risk memo work-hour summary report, cause and effect narratives, alarm summaries, instrument index, project specifications, and P&ID development.

(2004 – 2005) Sr. Lead Control Systems / Instrument Engineer

KBR Inc. - Cameron, LNG Terminal – Port Arthur, TX., (FEED)

As Sr. Instrument Engineer, accomplishments included creation of alarm summaries, specifications, instrument data sheets & narratives

(2003 - 2004) Sr. Lead Control Systems / Instrument Engineer

KBR Inc. - Sempra – LNG Terminal – Port Arthur, Tx., (FEED)

As Sr. Instrument Engineer, accomplishments included delegating and assisting tasks concerning FEED packages and the Owner Review for multiple LNG terminals.

(2001-2003) Sr. Lead Control Systems / Instrument Engineer

KBR Inc. - Shell – Ethylene Unit – Deer Park, Tx., (EPC)

As Sr. Instrument Engineer, accomplishments included creating instrument datasheets and assisting Jr. engineers. Instrument specifications and requisitioning were completed early or on schedule. Accomplishments also included successfully leading the start-up and Commissioning effort at site. Responsibilities included problem solving, instrument procurement, attending daily meeting with Construction Manager and all disciples. In addition, accomplishments included successful assisting Instrument Technicians and Honeywell with Commissioning through Start-up and Commissioning. I received a “letter of commendation” from Construction Manager.

(2000 – 2001) Control Systems / Instrument Engineer

KBR Inc. - SES – LNG Terminal – Long Beach, Ca. (FEED)

As Sr. Instrument Engineer, accomplishments included contributing to FEED estimate package for LNG receiving terminal as well as creation of risk memo, work-hour report, cause and effect narratives and alarm summary.

(1998-2000) Control Systems / Instrument Engineer

KBR Inc. - Exxon – Ethylene Unit – Singapore (EPC)

As Instrument Engineer, accomplishments included reviewing and coordinating instrumented vendor packages as well as creation of flow elements datasheets and vessel sketches.

(1997 – 1998) Control Systems / Instrument Engineer

KBR Inc. - Phillip Morris – Tobacco Facility – Richmond, Va. (EPC)

As Instrument Engineer, accomplishments included directing and contributing to the complete loop drawing efforts well as reviewing instrumented vendor packages.

(1995 – 1996) Sr. Instrument Designer

KBR Inc. - STP – Ammonia Plant – Trinidad (EPC)

As Sr. Instrument Designer, accomplishments included creation of low and medium voltage and MOV schematics as well as developing motor control design philosophy.

(1994 – 1995) Sr. Instrument Designer

KBR Inc. - Amoco Chemical – Paraxylene Unit – Texas City, TX (Revamp)

As Sr. Instrument Designer, accomplishments included creation of compressor control panel to fabrication drawings, as well as contributing to the complete loop effort.

(1993 – 1994) Sr. Instrument Designer

KBR Inc. - Enron – Methanol Plant – Deer Park, TX. (Revamp)

As Sr. Instrument Designer, accomplishments included completion of instrument design documents and drawings.

(1990 – 1992) Sr. Instrument Designer

KBR Inc. – Project (unknown)

As Instrument Designer, design drawings were created.

OTHER:

Software: Intools (SPI), Smart Sketch, Word, Excel, AutoCAD

Education & Associations: University of Houston, B.S. (1999), Control Systems Technology

Memberships: ISA member