Professional Objective:
Trained and Result-oriented E &I professional with comprehensive project work experience seeking a challenging and growth-oriented position in an organization where I would be able to implement, improve and develop my knowledge and engineering skills and key team player qualities in an effective and positive manner. Experience in Construction management and Project Execution in the field of Infrastructure and Metro Rail Project- Underground Stations, Elevated Stations, Depot, Viaduct, At Grade and Cut & Cover.
Summary:
I am Electrical Engineer, with 8-year experience, worked as Electrical Engineer in Delhi Metro Project, over Ground Stations & Presently I am working with RAMPED JV of Louis Berger & Hill International & EHAF Consulting Engineers. Also, I have worked as Electrical & Instrument Engineer in SAUDI RABIGH POWER PLANT PROJECT. where I have proven my ability to produce high quality, effective reviewing designs & Shop Drawing, materials and sites supervision plus excellent knowledge of T & C, FAT (Panels, Generators, TRF), while meeting challenging program I am strong technical background and experience of many projects, I consider my Electrical technical experience and my ever present enthusiasm for Electrical, to be well suited to fit into your organization.
Hands on Experience on ACONEX Construction Management Software: The World’s trusted construction management platform, connecting project teams & Processes.
Experience Summary: 8.5 Years (Gulf Experience: 5.5 Years)
Company: (RAMPED JV) Louis Berger, Hill International, Ehaf
Industry: Construction
Designation: QC Electrical Inspector
Project: Riyadh Advance Metro Project
Client: AR Riyadh Development Authority Period: 24th May 2015 to till now
Job Responsibilities:
Monitoring and administering the QA/QC Plan or Programmed and ensuring incorporated materials on construction projects are following the plans and specifications.
Review and understand the project scope and specification along with the ITPs, Shop drawings and method statement for each work activity.
Monitoring Quality of work and solving technical issues at the site and continuous feedback to the superior (RE) regarding the quality and the progress.
Monitoring all electrical installations to assure circuitry phasing, equipment, and grounding adhere to construction documents and National Electric Code requirements.
Monitoring and/or evaluating electrical tests such as ground-fault, ground resistance, and Resistance test for Earthing conductor (Lightning/Equipment), insulation resistance,
polarity, continuity, Megger, capacity, load and other electrical field tests as required.
Field checking installation and location of electrical duct, conduit, Cable containments, cables pulling, electrical equipment like Switch board & Panel boards (SMDB, MCC’s, UPS, CBS, Power factor correction panel, LDP, PDP, LCP) and other components of the electrical system being installed.
Field checking Installation of Low current system such as Building Management System (BMS), Fire alarm system, FM200 system, Public Address system, Telephone and Data system, structural Cabling system and Security (Access control & CCTV camera) System being installed.
Inspect/check all sample electrical components and materials submitted by contractors to ensure compliance against requirements and technical specifications.
Field checking Installation of Low Voltage system such as Small Power (Normal & Emergency), Lighting system (Normal & Emergency) being installed.
Implement the site supervision Quality procedures, and review submission requirements of the project along with the contractor.
Identifying site issues/defected work or non-compliance/approved materials and raising non-conformance report (NCR) after consulting the RE and the QA Engineer assigned to the work place. Also follow up the NCR on site once the Close Out actions have been agreed.
Conduct regular (daily) site visits and supervise, verify the installation of Electrical works ensuring compliance with the contract documents.
Assuring that the work is performed as required by the contract and meets or exceeds the required qualities.
Follows and maintain Company standards of Quality in accordance with Company Quality System requirements.
Assuring that the work is performed as required by the contract and meets or exceeds the required qualities.
Report to the Construction Manager/Resident Engineer and be able to undertake duties as assigned with the minimum supervision.
Maintain standards of safety and comply with Company’s Health, Safety and Environment Management System requirements.
Planning and managing works of all discipline to ensure compliance with the relevant standards, safety cases etc.
Decision Making:
Prioritization of work tasks under scope of work.
Execution of works in a safe manner.
Execution of works to ensure quality.
Email id: ac8yhx@r.postjobfree.com
Mobile: +966-*********
EDUCATION:
B. Tech. in Electronics & Communication
Rajasthan Technical University
India
2007-2010
Diploma in Electronics & Communication
Board of Technical Education, Bangalore
India
2004-2007
Diploma in Industrial Safety management
SKILLS:
Detailed schematic, Quality control, Wiring diagram, Single line diagram, Cable schedule, Assembly of electrical sub system
Familiar with Inspection process, Knowledgeable in construction safety, Strong interpersonal skills, Basic computer skills.
PROJECT DETAILS:
Construction of world’s largest Metro Rail Project associated with Transit system, Stations, accommodating structures, Park & Ride facilities, Bus interchanges, Depot and operation control centers of Line 4, 5 & 6 at Riyadh Saudi Arabia for a total length of 65KM (Viaduct-30KM,Underground tunnel-27KM, At Grade-8KM, Stations-23, Transfer Stations-2, Depot-2 & Park and Ride-2)
Country of Experience:
INDIA, KSA, OMAN
PERSONAL DETAILS:
Name: Aurangzeb Ali
Date of Birth: January 15, 1989
Nationality: Indian
Father’s Name: Mr. Maqusud Alam
Marital Status: Married
Linguistic Knowledge: English, Hindi & Urdu
Passport No.: S 7015774
Place of Issue: Patna
Date of Issue: 24-12-2018
Date of Expiry: 23-12-2028
Permanent Address: Vill- Piprahin, Post-Brindaban, P.S- Uchkagaon, Dist- Gopalganj, Bihar, Pin code- 841440
Company: Towell Engineering Services Co. LLC
Industry: Construction
Designation: Electrical & Instrument Engineer
Project: EPCC Second Sour Water stripper system (SSWS)
Client: Oman Oil Refineries & Petroleum Industries Company (ORPIC)
Period: 12th October 2014 to 30th March 2015
Job Responsibilities:
Review P&ID, ILD and instrument location plan, hook up drawing and wiring diagram.
Interpretation of P&ID, JB location plan, Instrument Location Plan, General Arrangement & Layout Drawing, Hook up drawing, Instrument loop test drawing, ESD drawing, for Erection, Installation of all types of Instrument.
Knowledge about installation of cable tray and LCS (Local control switch) for pump.
Knowledge about installation of MCC (Main control cabinet) feeder in process sub-station.
Equipment’s handled for Calibration are Multimeter, Multifunction Calibrator, Decade Resistance Box, Hart Communicator, Pressure Calibrator (Fluke, Ametek, Druck), Test Pump, Dead Weight Tester and others.
Planning and executing instrument Construction & Commissioning works.
Preparing daily progress reports and submitting to clients.
Also Coordinates with Main contractors & Clients at the different phases of Construction and inspection activities.
Monitor completed document against construction completed jobs.
To check installation of instrument stanchions, Transmitter, Transducer, Tubing from taping point to process instruments including air supply leak testing according with standard and specification.
Supervision of wire termination in field instrument, junction boxes and Marshalling cabinet.
Check instrument cable segregation for above and underground installation.
Loop Checking and Function Testing of all instrument including Control Valve, Motor Operated Valve (MOV).
Company: Larsen & Toubro Limited
Designation: QA/QC Electrical Engineer
Project: Delhi Metro Project, Delhi
Period: September 28, 2013 to September 15, 2014
Job Responsibilities:
Member of project construction supervision team in overseeing the installation and quality assurance of the MV/LV and low current electrical works, such as MV/LV cabling, Cable Trays, Cable Ladders, MV/LV transformer, MV/LV Switchgear, LV bus ways, Stand-by power generator, ATS, UPS system, Grounding and lightning protection system, Normal and Emergency Lighting system including the lighting control devices (DALI), Power system, Fire alarm system, Public address system, Security (access control & CCTV cameras) system.
Examine electrical systems such as Testing of Transformers, RMU’s, Capacitor bank, Main distribution Panels, Control panels.
Conducting continuity & Megger resistance tests for wires and LV cables using test equipment’s (Megger).
Raise (RFI) Request for Inspection for Electrical activities whenever these are Hold point or Witness point.
Field Inspection of installed equipment/materials, documentation of field report, punch list for complete works.
Material quality control to make sure it conforms to the engineering standard, specification and codes
Supervision for the installation and testing of Fire alarm system as per standard requirements.
Inspection of installed electrical equipment as motor controllers, power & lighting panels.
Ensure that measuring and testing equipment are calibrated properly prior to use on test activity.
Submit daily activity reports, field clarification for any deviation and conflicts of designed and issued for construction drawings.
Maintain Log register and discuss discrepancies/violation of standards with section in charge and issue notification to concerned contractor for corrective action as and when necessary.
Company: SEJONG E & I LLC KSA under Doosan Heavy Industries
Industry: Construction
Designation: Electrical & Instrument Engineer
Project: Rabigh Power Plant – 2, Western Part, K.S.A.
Client: Saudi Electricity Company (SEC) & Parsons Brinckerhoff (PB)
Period: 25th June 2012 to 20th August 2013
Job Responsibilities:
Checking of Instrument Installation as per Hookup drawing, Layout drawing and P&ID.
Loop checking of all type of Instruments from field to control room (DCS)
To check installation of instrument stanchions, Transmitter, Transducer, Tubing from taping point to process instruments including air supply leak testing according with standard and specification.
Supervision of wire termination in field instrument, junction boxes and Marshalling cabinet.
Knowledge about Maintenance & Troubleshooting of all instrument e.g. Flow Transmitter, Level Transmitter, Temperature Transmitter with sensor, Pressure Transmitter etc.
Good Understanding of all symbol and Piping & Instrument Diagram.
Maintenance and Calibration of all instrument like various type of Level Transmitter e.g. Displacer type, Radar type, Ultrasonic, Differential Level Transmitter, all kinds of Switches, Differential type Flow Transmitter.
To remove, dismantle, overhaul/repair & install electric, pneumatic, electronic or hydraulic control system such as control valves & actuators, recorders, measuring & recording instruments in the field or in the workshop.
To comply with all company health, safety & environmental as well as work permit policies & procedures.
Company: Afcons Infrastructure. Ltd.
Designation: Electrical Engineer
Project: Delhi Metro Project, Delhi.
Period: 21st September 2010 to 28th May 2012
Job Responsibilities:
Supervision of execution of electrical works in the Delhi Metro Project, Over Ground Stations, Annexes building. As Inspector to follow the work progress and quality assurance of all supply materials, Shop Drawings, load Schedule checking, inspection & check daily installation works under taken by MEP contractor, attended FAT for power panels, ECS panels and Generators, attended weekly Progress meeting & Technical meeting with E/M & contractor, conducting and attended the T &C for electrical Installation, Primary cabinets, VFD, TVS, Elevators, Escalators Master Mode Test and Cause & Effect Mode Test. Attended MPL (Master Punch List) and reviewing trade off submitted by contractor.
Collaborated with the clients to formulate electrical specification and safety guidelines, identify customer requirements, design systems & products for Power Distribution Line maintenance and installation of sub-stations.
Selects appropriate electrical systems, equipment and technological device for the project.
Supervision of internal and external electrification such as Transformer Installation, Circuit Breaker, GIS, CT’s and PT’S, LV & MV Cable pulling and Laying and various MV switchgears.
Supervising Erection and Installation of 33/11 kV sub-station.
Site visit, Project planning, Monitoring, Site supervision and Estimation of all electrical works and procurement of materials.
Execution of all electrical installation including Distribution board (DB), all types of Panel, Cable Glanding, Cable Termination, Cable Containment (Tray, Trunk, Ladder), Conduiting, Wiring, end terminations and straight through joints.
Your text here