Curriculum Vitae – Ken Scott, Project / Construction Manager
PERSONAL
Name: Kenneth Scott
Address: * ************* *******, **********, *********, TS260LY, UK
Phone: (+44) (1429) 221711; Mobile: +44(0)791-***-****
Email: ****************@**********.***
Driving: Full Driving Licence
Passport: 10 Year current
SUMMARY
A professional, experienced & enthusiastic Senior Project / Construction Manager with over 30 years’ experience in the international Pharma/BioPharma, Semiconductor, Data,Comms, Clean Rooms / Labs both fixed and flexi construction, HVAC, Utilities Dirty & Clean, Instrumentation, Modular and Stick Build Construction packaged equipment, Oil & Gas, On Offshore and SubSea, Plant Rooms, Heavy lifts, Onshore to offshore load out, Energy Sector, Petro-Chemical, EFW, CHP, Nuclear, Brewing, Dairy, Water, Distillery & Food industries.
Roles have included Project Manager/Snr Construction Manager, CQV Engineer, Snr Project Coordinator, Site Manager, QA/QC Inspector, Piping / Mechanical / Area Superintendent & Test Engineer. Projects have been on Green and Brownfield Construction Sites as well as on major Plant Shut-Down’s.
Experienced in managing all project phases, including FEED, Planning, Cost Control, Design, Procurement, Construction, Coordination, Health & Safety, QA/ QC, Pre commissioning & Commissioning, Test Pack Coordinator / Document Turnover Lead/ IQ / OQ /PQ Validation, CQV. Also have experience of SIL, SIF, HAZOP, HAZID,HAZARD, HAZCON, HAZEMP, CHAZOP, SAFOP, IED, PPC & FPSA. Fully conversant with BIM’s….Building Installation Models.
QUALIFICATIONS & TRAINING
Began Masters in Business Leadership / Project Management and Engineering, but unfortunately due to project commitments and global travel unable to complete final stages of my Master’s Degree.
HND/HND Mechanical Engineering - Longlands College - 1976
City & Guilds of London – Pipework Engineering & Gas & Arc Welding Technology - Longlands College 1976
Full time served apprentice HVAC Engineer – Pipework Engineering & Welding Technology -1971-1976
IOSH Managing Safety (Safety for Construction Managers) – 2017
CDM Course – September 2015 – Urenco / UUK Capenhurst TMF Chester
CDM Coordinator Course – 2007 - Glaxo SmithKline In-house
SHE / DESEAR – 2003 Glaxo SmithKline In-house
COSHH – 2003 Glaxo SmithKline In-house
CCN Course Glaxo SmithKline in-house 2004
Lloyds Register - Pressure Equipment Directive 97/23/EC. Pressure Equipment Regulations 1999 (S1 1999/2001)
CSCS Card (Black) for Managers and Professionals
LOTO, TBT’s, RAMS, SPA’s, SOR’s, LMRA’s, PTW, SBAL, TAKE 5, Lift Plans
Cgmp
GAMP
FDA
Safe Pass Certified – 2018
European Project of the year award 2004
ROSPA Gold Award 2005
Bentley Award for Project Excellence 2005 Philadelphia USA
SECTOR EXPERIENCE
Pharmaceutical & Biotech industries
Clean Room Construction builds
Commercial and Office Builds
CSA…Civil, Structural & Architectural
Data Centre Experience
Semiconductor
On / Offshore Topside Module construction, Jackets, Sus Sea Templates, Offshore hook-ups, Sub Sea services and Platform Decommissioning and removal
Oil / Gas Refineries
Petrochemical, Chemical Plants
Power - Combined Heat Power (CHP), Nuclear Power, Oil & Gas, EFW and Fossilised power generation, Gas Turbine Power generation “National Grid”
Breweries, Distilleries, Food Plants, Dairies, Water
Water treatment
Listed buildings…. Internal destruct and re-fit to whatever requirement.
Army Garrisons
Schools
Mills
MAJOR CLIENTS
Intel Ireland Ltd
Shire Pharmaceuticals Ireland (Takeda)
AstraZeneca, GSK, Pfizer, Thornton & Ross, SmithKline Beecham, Sigma Aldrich Pharmaceuticals, Rhodia Chirex, Dupont in the UK
BP, Shell, Total, Aramco, Pennzoil, Sabic, Unrenco
Jacobs, Fluor, WS Atkins, Bovis Lend Lease, Costain, Badger BV, Molem, Brown & Root, PDMS Energy
ICI, Dupont, BP/ Costain, Grootcon / DeGroot, Penzoil, Petrofac, EOG.
Heerema, Trane / Ingersol Rand
Global Project Locations
Ireland, UK, France, Germany, Switzerland, Holland, Hungary, Brussels, Malta, Turkey (Both Ankara and Istanbul) Italy
UAE, Sudan, New Zealand,
CAREER HISTORY
July 2018 - Date: December 2018 Takeda (Shire) / Jacobs / Leo Lynch, Dunboyne, Ireland
Senior Construction Manager
New Biopharmaceutical facility in Dunboyne, Co Meath. (€600m)
I was engaged on this fast-track project on a short term contract basis to trouble shoot construction issues and blockers, to resolve and execute solutions. I was overseeing 4 area Construction Managers across the entire facility, to ensure Safety, Quality, Construction, Programme and cost, were achieved.
Aug 2017 – May 2018 Costain Oil, Gas & Power, UK.
Project Manager and Senior Construction Manager
A brownfield Gas compressor facility for the National Grid (£150m)
Project involved the installation of two new gas turbine compressors and all associated equipment including piping (dia.80mm to 1200mm - all subterranean) 2 no RB211 Gas Turbine compressor units, piling / heavy civils works, deep excavations, heavy lifting, structural steelwork, electrical and instrumentation installation, control centres, Data Centre, LER, packaged hydraulic units, water cooling, oil compression modules, water treatment units, diesel generator package, tanker loading, telecoms, transformer room & site infrastructure.
April 2017 – Aug 2017 AstraZeneca, Dunkirk, France
C&Q Validation Engineer
Laboratory Demolition & Rebuild (£200m)
Construction and Validation work pack coordinator and lead on a laboratory demolition and rebuild, subsequent Fit-out of a new Pearl & Symbicort production line and new laboratory, dispensing, preparation and filling of Turbohalers, Logistics & Warehouse and Utilities buildings.
Coordinated all construction to MC; developed the C & Q Plan with the CQV Teams (IQ/OQ/PQ protocols) including all SHE reviews, Hand over dossier Packs, Scope included process lab equipment, HVAC Clean & Dirty, utilities, special gases (N2, He, Ar,O & H2), compressed air, vacuum, emergency extract and ultra-purified water systems.
Dec 2016 – March 2017 GlaxoSmithKline, Ware, UK
Senior Construction Manager
Pharmaceutical Demolition & Rebuild (£150)
Demolition and rebuild of a 30 year old facility consisting of 3 areas; RDA (Rapid Development Area), OSD (Oral Solids Dosing) and CMC (Chemical Manufacturing Controls), including full Plant Room strip and reconfiguration. New facility included Vaccines manufacturing area, OSD equipment, Labs, Write-up areas, Service areas & main plant room.
Oct 2016 – Dec 2016 GlaxoSmithKline, Ware, UK
Senior Construction Manager
New Ultra-Pure Water facility building (£2m)
Seconded to assist the existing Construction Managers to drive the project to completion. Project was the installation of a new Ultra-Pure Water facility building. I was responsible for CDM, all aspects of the construction - Civils, Electrical, Instrumentation, HVAC, Fire & Gas systems, Commissioning, Security and Turnover Dossiers.
Feb 2016 – Oct 2016 Wilton International, Teesside, UK
Senior Construction Manager
New Aquaculture R&D Facility (£15m)
Construction Manager in charge of the construction of a demonstration R&D facility to produce a protein substitute called Feed kind for Wilton International on Teesside. A very high tech project in terms of both its process and materials, it received global recognition as the way forward for fish sustenance production.
Aug 2015 – Feb 2016 URENCO TMF, Capenhurst, UK
Client Senior Construction Manager
TMF Tales Manufacturing Facility (£800m)
Managed the Principal Contractor and sub-contractors of a brownfield nuclear facility project. Responsible for all aspects of the area construction and delivery. HSE / ONR audits / TMF facility client meetings, local community liaison meetings, etc.
Dec 2013 - Aug 2015 PD&MS Energy, Aberdeen, UK
Project / Construction Manager Seconded to Petrofac
Petrofac Great Yarmouth, UK - North Sea Platform decommissioning (£50m)
Responsible for all onshore engineering, offshore interventions and subsea works, contractual negotiations for all offshore assets, Jack ups, shipping, survey vessel works and DSV’s, governmental legislative requirements and compliance.
Project / Construction and Yard Manager
PD&MS/Harlen JV fabrication facility - Dundee, Scotland (£200,000 to £5m)
Responsible for all offshore MODU structures refitting and all shutdown works during layover period in the port of Dundee; support of all offshore work packs following return of structures to offshore locations.
Project Manager
Offshore Douglas field (£20m)
Based in the EOG Runcorn Project Offices, Managing an offshore campaign involving installation of Production skids, structural & piping packages for a (HOM) Hang off Module installed onto the existing Douglas Structure. Overall coordination of all offshore labour / trades, resolution of any technical issues and ensuring the free flow of materials offshore for the construction work packs, Commercial and Cost Control.
June 2013 – Nov 2013 GlaxoSmithKline, Irvine, Scotland Full EPCM Project (£50m)
Senior Construction Manager (Jacobs Engineering) Working on the FEED for a Clavulanic Acid facility expansion, Modular and Stick Build construction packages, including upgrades to the Solvent recovery areas, RO Areas, Glycol & Chilled water areas, Cold Storage, Electrical switch rooms.
Feb 2013 - May 2013 Interserve Industrial
Project Manager / Construction Manager
Teesside Energy from Waste Project (£300m)
Installation of Vessels and Equipment up to 230t; fabrication & installation of process pipework. Coordinating all Construction activity, Contract placement, Heavy Lifts, Large scale excavations, Steel erection, E&I installation and HSE / RAMS / SIL / HAZOP / HAZID / HAZCON etc.
Sept 2010 - Feb 2013 Heerema Offshore Construction UK
Project Manager
Offshore Process Module and Local Equipment Room (LER) for BP Andrew Project. (£150m)
Construction, Commissioning and load out of a bolt on process module (800t) for the existing BP Andrew brownfield Platform. This structure became the largest producer of oil for BP in the North Sea.
Project Manager
Working on an EPIC Topside and Jacket Project for Centrica (£200m)
Construction of a Gas Topside and Jacket for the North Sea.
This project was a Sea harvester Design, first of its kind offshore, in UK waters
Responsible for all Contracts /Packages Commercials / Schedule / Cost / Construction controls including the control of an overseas Design House, Commissioning, coordination of FAT’s & SAT’s. Held regular meetings with the T&I Contractor, Seaways for the heavy lift and installation offshore, including the subsea element of the works with (SS7) Subsea seven in Aberdeen.
Sept 2009 - Sept 2010 Ingersoll Rand / Trane Baymina Enerji GDF SVEZ, Ankara, Turkey
Snr Project Manager and Snr Construction Manager
CHP Project (GTAIC) System (£20m )
Managing installation of a GTAIC project with multinational trades.(Gas Turbine Air Inlet Cooling System) for a CHP Plant, I was responsible for ensuring Design was to specification, Control of all packages, Cost control, Schedule & execution of all project activities; EHS, Reporting, Client Presentations & Commissioning. Project was built to a very high specification (Seismic standards) and included 2,000t of steel structures, and the onsite fabrication of 1,000m3 vessels to Lloyds Standards, heavy civil activities for pipe bridges, pipeline routes, steelwork structures and tanks; MCC Room & controls, Chiller Plant Room Building, Cooling towers and Pumping station.
Sept 2008 - Sept 2009 Sabic International, Wilton Teesside
Permit Engineer
Attended Master Class Course for Sabic Internationals 1301 Permit Issuing Procedures inhouse
LDPE Plant Wilton International (£600m)
Working within the completions / Commissioning Team
Responsible for issuing all permits including LOTO, Confined Space Entries and all risk related activities for entire Construction build and interface with the existing service sites, Pre commissioning and commissioning disciplines, and the introduction of Hydrocarbons into the facility.
Jan 2004- Aug 2008 GlaxoSmithKline, Stevenage UK.
Snr Project Construction Manager
R&D Facility Chemistry Pilot Plant (CPP) (Varying capital projects from (£200,000 to £15m)
Responsible for all construction trades working on facility upgrades; including Pre commissioning, Commissioning & Validation CQV in both the existing live facility and all external Brown Field projects.
Client interfacing with the existing production area managers and leads, to avoid any impact during the campaign production of the CPP facility. Daily Construction coordination meeting with building owners and users….again to avoid any campaign impacts.
Aug 2003 - Jan 2004 GlaxoSmithKline, Harlow, UK
Project Manager (Bovis Lend Lease)
Laboratory Upgrade on a existing facility (Fixed to Flexible) (£20m )
Management of facility internal destruct and upgrade in both Production Areas and Facility expansion in the pharmaceutical plant. HSE, Construction, Commissioning & Validation, and handover.
April 2002 - Aug 2003 Intel Ireland Ltd, Leixlip, Ireland.
Project Manager (Jacobs Engineering)
Wafer Fab Facility – Fab 24 (£1.7 Billion)
Project and Area Construction Manager responsible for the construction of Brownfield Semi-Conductor Facility, including CUB, Bulk gases, Ultra-pure water packages, Cooling Towers & Bulk chemicals. Services overseen included HVAC, Power, CSA, E&I, MECH, Comms, Data Centre and Commissioning.
Jan 2002 - April 2002 Sigma Aldrich Pharmaceuticals, Gillingham, Dorset UK.
Construction Manager (WS Atkins)
Installation of a freeze Dryer Project within the existing facility building. Destruct and fit out of the new equipment and services. HSE,Pre-commissioning, Commissioning / Validation, and hand over packages.
April 2001 - Sept 2001 Rhodia Chirex Pharmaceuticals, Holmes Chapel, UK.
Senior Construction Manager Jacobs Engineering
Large Scale Bulk Pharmaceutical Facility Expansion & Upgrade. Project had been previously started and placed on hold for a period of time. Sometime later, the green light was given to revisit the facility and complete the project construction
My role was to take stock of what had been previously completed, review status and quality, pick up where it was left off, evaluate and programme works to go, expedite materials and packaged equipment and complete the remaining construction activities, then carry out Commissioning, validate and compile the handover dossiers.
REFERENCES