Post Job Free
Sign in

Power Plant Engineering

Location:
Hyderabad, Telangana, India
Posted:
March 29, 2019

Contact this candidate

Resume:

TATHAGATA BHATTACHARYA

E-Mail: ac8xt7@r.postjobfree.com, ac8xt7@r.postjobfree.com

Mobile: +91-709******* (O), Contact No.: +91-869******* (P) Aspiring to Seek challenging managerial positions in reputed and growth-oriented organization, demanding high standards of quality and precision of work, and thereby providing me opportunity to contribute in the growth of the organization

ABRIDGEMENT

Dynamic, diligent and result-oriented individual with 11 years of accomplished experience in the field of Rotating Equipment & Associated Pkgs. (related to Power Plant & also Metal/Mining Industry), currently working with Tata Projects Limited, Hyderabad as Manager Engineering (Engineering Design). Responsible for Project Execution & also Proposal Engg. of Rotating Equipment & Associated Pkgs. Pragmatic with excellent managerial acumen and abilities to withstand work pressures, deliver assignments within specified period without compromising on quality benchmarks. PROFESSIONAL EXPERIENCE WITH TATA PROJECTS LTD. (FROM JUNE 2013 TO TILL DATE) MANAGER- ENGINEERING (EXECUTION & PROPOSAL)

1. Static & rotary equipment and related Pkgs.

2. Pre-Bid proposal engineering support for technical packages for Metal & Mining, Power Generation & Water System/Treatment business across the Tata projects Limited. Key area:

Execution engineering (11 years of experience)

Proposal engineering (8 Years of experience)

ERALIER ORGANIZATIONAL EXPERIENCE

Since Aug., 2007: McNally Bharat Engg. Co. Ltd., Kolkata as Asst. Engineer - Design (Dept.: Non Ferrous Metals) KEY DELIVERABLES:

Design, Project Planning & Management

Managing activities related to design and engineering right from the time of start to the end of pretender engineering including various problems which may come across during erection and commissioning.

Responsible for planning and work scheduling to achieve effective manpower deployment of qualified workforce.

Reviewing and developing of engineering drawings, layouts, diagrams & technical calculations. Site Management

Frequent visit to site and interacting with concerned persons to provide necessary inputs related to design and engineering, required for carrying out proper estimation work. Design

Planning

Team Management & Co-

ordination

Review

Evaluation

Settling all technical disputes / clarifications which may arise during execution of project. Liaison & Coordination

Coordinating will Clients / Consultants and attending meeting with them for better understanding of various technical drawings and documents.

Reviewing of vendor documents and performing documentation work related to the projects handled.

Liaising with other departments regarding various engineering and technical issues. ACADEMIC CREDENTIALS

2007: ME (Mechanical – Water Resources & Hydraulic Engineering) from Jadavpur University, Kolkata.

2005: B. TECH (Mechanical Engg.) from West Bengal University of Technology, Kolkata.

2001: Higher Secondary Examination (12TH) from West Bengal Council of Secondary Education (from Jalpaiguri Zilla School, Jalpaiguri).

1999: Madhyamik Examination (10TH) from West Bengal Board of Secondary Education (from Jalpaiguri Zilla School, Jalpaiguri)

IT KNOW-HOW

General hardware & software concept.

Well versed with operating system e.g. Windows 9x, Windows XP & Microsoft Office.

Essential knowledge of AutoCAD drafting software in 2-D.

Basic knowledge of Auto LISP, an implementation of the LISP programming Language & Linux. CURRENT JOB RESPONSIBILITIES

Review of tender / contract document.

Whole System integrity of different Pkg.

Assimilation of consumption figure from technology partners.

Basic engineering calculations and selection of equipment’s.

Able to conceptually represent overall water balance diagram by validating the completeness and accuracy of flow diagram.

Scanning the external environment for recent changes in technology and judging its applicability.

Review of capacity selection of various system equipment’s using OEM (original equipment manufacturer) performance information and industry approved procedures.

Network Analysis / hydraulic calculation for water circulation system.

Review of inputs from technical provider for optimization of cost.

Proficiency in preparation of P&I diagrams, basic engineering calculation, hydraulic diagram and hydraulic calculations.

Water circulation & treatment calculation for unit & sub-units.

Preparation of equipment list and load list.

Preparation and review of mechanical GA drawings of pump house, compressed air station, blower house, steel plant BOP unit facilities etc.

Design and engineering of pump house & yard piping.

Input to overall plant layout.

Piping size calculation.

Preparation of civil assignment drawings.

Preparation of RFQ / Technical Specification of balance of plant equipment / packages. This includes equipment’s / packages / accessories (valves, piping) of utility & water system and treatment plant units.

Preparation of design basis report.

Preparation of Technical Evaluation Report & assessment of the materials, equipment to be used in the system as submitted for the compliance with the relevant standards and overall conclusion and recommendation.

Review of deliverables & clearance on Vendor drawings.

Inter and intra disciplinary technical coordination

Interdisciplinary input drawing review.

Preparation of Bill of quantity for proposal & execution engineering.

Technical guidance to the team

Pipe route planning with detail bill of Quantity.

Technical contracts review & provide assistance for optimizing the design.

Interaction with client & consultant to obtain approval by providing needful technical support.

Technical negotiation during contract signing. Closure of contract signing from technical side.

Proficient in AutoCAD & pipe net software.

Delay analysis & technical claims put up etc.

Closure of the project to ascertain all part of contractual requirement.

Assist Site engineers as when any query received from site.

Coding used during preparation of BID BOQ to segregate service / zone / type wise as per requirement. Review of technology providers BOQ and further implementing to the same as per relevant BIS std. in accordance with GTS of Client.

Attending technical meeting with customer.

Vendor management.

Maintaining data banks of equipment for cost analysis in proposal engineering.

Team management.

STRENGTHS

1. Quick-learner, self-starter, highly motivated and detail-directed problem solver having very good conceptual abilities.

2. Good Management skills.

3. Always open to take up-new challenges.

4. Ability to lead team cohesively.

PERSONAL DOSSIER

DATE OF BIRTH: 30th January 1983.

CURRENT ADDRESS: First Floor, Plot No. 2, 2-28-137, Venkatram Nagar Colony, Behind Karkhana, Secunderabad – 500009.

FATHER’S NAME: Mr. Rama Prasad Bhattacharya.

SEX: Male.

NATIONALITY: Indian.

MOTHER TONGUE: Bengali.

RELIGION: Hindu.

MARITAL STATUS: Married.

CO-CURRICULAR ACTIVITIES: Common interests include listening to light music, painting, making friends and Love to visit places of natural beauty. PASSPORT DETAILS: PASSPORT NO. G4428347; VALIDITY: 23/10/2007 to 22/10/2017. CURRENT CTC (INR):

EXPECTED CTC (INR):

13.5 Lakh/ Year.

(Negotiable)

PREFERRED LOCATION: Anywhere in India.

NOTICE PERIOD: 1 month.

PROJECT ANNEXURE

Key Execution Projects:

PROJECT NAME

PERIOD

NATURE OF DUTIES

FROM TO

Projects handled at McNally Bharat Engg. Co. Ltd.

UCTL – 1 PROJECT

10-08-2007 25-06-2010

Design of Crushing, Grinding, Neutral

Client: Uranium Corporation of Thickening & Tailing Disposal System India

SK MILL PROJECT

01-09-2009 22-07-2011

Design of Crushing, Grinding, Neutral

Thickening, Tailing Disposal, Filtration,

Water Supply & Utility System

Client: Hindustan Zinc Ltd.

KCM EAST MILL PROJECT

06-11-2010 01-01-2012

Design of Crushing, Grinding, Neutral

Client: Konkonla Copper Thickening & Tailing Disposal System Mines, Zambia, Africa.

SK MINES TAILING

HYDROFILLING

18-01-2012 25-05-2013

Design Tanks, Pumps, Pneumatic

Conveying, Water Supply & associated

Client: Hindustan Zinc Ltd. Utility Systems

Projects currently handling at Tata Projects Ltd.

KONDBOND WATER SYSTEM

PKG.

02-03-2014 Till date

Design of Water Supply system through

Intake Pump House & associated Utility

Client: Tata Steel Ltd. Systems

RINL COAL & CIKE HANDLING

PKG

10-04-2015 Till date

Design of Water Supply system through

Intake Pump House & associated Utility

Client: Vizag Steel Plant Systems

SRI DAMODARAM

SANJEEVAIAH THERMAL

POWER STATION, STAGE II,

UNIT# 3, 1 x 800 MW.

20-07-2017 Till date

Design, Engineering & supply of Hypo-

Chlorination Plant & associated Utility

Systems

Client: APPDCL

01-01-2018 Till date

Design, Engineering & supply of Stop-log

Gates, Trash Racks & TWS Pkg.

01-02-2018 Till date

Design, Engineering & supply of Effluent

Collection & Treatment Pkg.

2X800MW-NTPC-TELANGANA

THERMAL POWER PLANT

01-08-2017 Till date

Design, Engineering & supply of Stop-log

Gates & Trash Racks.

Client: NTPC 01-04-2018 Till date

Design, Engineering & supply

Miscellaneous pumps.

SYNOPSIS OF PRE-BID PROPOSAL AREAS / SUPPORTS:

Competent to support for packages of integrated steel plant & power generation areas. Key areas of proposal engineering in this area are mentioned below.

NMDC PELLET PLANT.

KOCHI WASTE TO ENERGY.

500 KTPA ADANI COPPER SMELTER PLANT (ENTIRE CICULATION COOLING WATER SYSTEM).

DAHEJ CAPTIVE POWER PROJECT.

RSP PELLET & BENEFICIATION PLANT.

DALLI BHILAI PELLET & BENEFICIATION PLANT.

WATER SUPPLY PROJECT TO BELPAHAR.

NTPC BULK FGD LOT-1A & 1B.

NTPC FGD NORTH KARANPURA & KHARGAON.

CLIENT HANDLED:

STEEL AUTHORITY OF INDIA (RSP, BSP, DSP etc.) RINL-VIZAG, TATA STEEL, NMDC LTD, APPDCL, ADANI, COAL INDIA, NTPC etc.