RENE AMBROSIO S. ALINDADA

Bascaran, Solano, Nueva

Philippines

Mobile No: 555-73368

Email : ac8x8j@r.postjobfree.com

POSITION APPLIED FOR: TENDER SR. ESTIMATOR

SUMMARY OF QUALIFICATION

Civil Engineer with a total of 26 years in various high-rise, residential buildings & Infrastructure works practicing the following fields:

1. SR. ESTIMATOR – 16 years - Qatar

- Estimating / Pricing of Tender using Candy Software (CCS CANDY)

- Evaluation of Sub-Contractors / Suppliers Quotation

- Sending Request for Quotation to approved Sub-Contractors / Suppliers

- Preparing Quantity Take-off to check The Quantity in the BOQ

- Interpret the Tender Document requirement

- Send request for clarification to the client in any discrepancies between tender document (.ie. Specification, Drawings & BOQ)

2. QUANTITY SURVEYOR – 5 YEARS - Libya & UAE

- Prepare quantity take off for the entire project requirement

- Prepare quantity take off and pricing for all variation & claims for ongoing project

- Prepare monthly billing as per accomplishment

- Prepare monthly report as per client requirement 3. FIELD ENGINEER / QS & ESTIMATOR – 7 Years - Philippines

- Assign at project to supervise project implementation (Civil, Architectural & Infra Structure) as per drawing & specification

- Assign to prepare quantity take off for costing of variations & claims

- Assigned at head office for Estimating works for Tenders Computer literate:

o Proficient with CCS Candy Software, MS Office Application, MS Projects, Primavera P3 & Auto CADD

2

WORK EXPERIENCES

A. SEPTEMBER November11, 2018 to March 02, 2019

COMPANY : Tadmur Trading & Contracting

Doha, Qatar

POSITION : SR. ESTIMATOR / SR QS

PROJECT : Seef Lusail Development Plot D1 & D2

Lusail City, Qatar

B. SEPTEMBER 2002 TO OCTOBER 2018 (16 Years)

COMPANY : Al Jaber Trading & Contracting Co. WLL

Doha, Qatar

POSITION : SR. ESTIMATOR / SR QS

PROJECT : See Below List of Project Involved in Pricing DUTIES AND RESPONSIBILITIES :

Pricing Tenders using the CANDY software. Prepare the necessary Resources Unit Rates (Labor, Plant and Material) and placed it in the Candy file for pricing the Civil Works. Prepare all the different PACKAGES that will be sent to all the Sub-Contractors and Suppliers for the purpose of obtaining competitive Quotations. These PACKAGES refers to the ITEM OF WORKS measured in the BOQ. The sending of the BOQ should be accompanied by the corresponding Drawings, Specifications and Tender Circulars. The pricing of Tender should be based on the actual quantities shown on the Drawings and the materials that are specified in the provided Specifications. The list of approved VENDORS issued by the Client/Consultant should also be considered in pricing.

Review and check all the received Quotations and input these at the SUBCONTRACT ADJUDICATOR in the CANDY file for comparison purposes. Adopt the Quotation which are listed in the approved VENDOR’s List and at the same time complies with the required Specifications and having a very competitive price.

Review & check the provided drawings in coordination with the Civil & MEP QS in order to compare the BOQ provided by the client. Prepare the Request for Clarification Form which will be sent to the Client/Consultant for all the item of works that are found to be under-measured or un-measured.

Review and check the Tender Documents in full coordination with the Materials Engineer to look for Specification discrepancies. Prepare the Request for Clarification Form which will be sent to the Client/Consultant for all the items of works that has specification discrepancies.

Prepare Request for Clarification Form to be sent to the Client/Consultant for missing BOQ items, detailed Drawings and particular Specifications.

3

Review and check all Tender Circulars issued by the Client/Consultant to look for any changes/revision of Specifications, Drawings and BOQ. Coordinate with the prospective Sub- Contractors and Suppliers for any Cost Implication that will arise due to the said Tender Circulars.

Coordinate with the MEP Sub-Contractors for any EXCLUSIONS they made in their Quotation and prepare Costing for these EXCLUSIONS so that it will be incorporated in the Final MEP price. Normally, MEP Sub-Contractors do not price Civil Works.

Prepare the Proposed Tender Bid Cost using the Candy Software by adopting all the specified and competitive Quotations and the take-off Quantities prepared by the QS. All Tender Circulars, updated BOQ, revised Drawings and Specification should always be in consideration in pricing.

Prepare Indirect Cost to be incorporated in the BOQ Preliminaries. List of Awarded JTC Projects Which I am Involved in Pricing NAME OF PROJECT COST in QR DATE COMPLETED

1. New Port Project (NPP065) Visitors Center 150,000,000.00 On-going 2. Renovation of Somerset Hotel 120,000,000.00 On-going 3. ACS British School 320,000,000.00 On-going

4. Horse Owner’s Complex at Al Khor 380,000,000.00 2016 5. (3) New Schools Around Doha & Villages 199,334,994.00 2016 6. Four New Schools Package 4 278,892,000.00 2015

7. Four New Schools Package 3 254,078,613.00 2014

8. Airline Operation Facility 262,290,000.00 2014

9. Barwa Commercial Avenue Package 9 158,124,986.00 2012 10. Learning Center for Qatar Foundation 235,771,066.00 2011 11. West Bay Road Works and Infrastructure 199,583,882.00 2011 12. Dukhan Housing Phase 7 595,000,000.00 2010

13. Al Khor Housing Package 5 220,000,000.00 2010

14. Mesaieed Elementary School 104,072,886.00 2009 15. Mesaieed Senior School 106,233,011.00 2009

16. AWQAF Residential & Commercial Bldg. 104,000,000.00 2009 17. Al Khor Housing Package 4 699,625,227.00 2009

18. Mesaieed Labour Accomodation Phase 2 387,840,000.00 2008 19. QREIC Office Building 95,756,000.00 2008

20. Al Alawi Tower 90,000,000.00 2008

21. Ramada Hotel Extension 114,900,000.00 2007

22. Hamad Aquatic Center 66,000,000.00 2006

23. Multipurpose Training Hall (4 Club) 51,851,839.00 2006 24. Beverly Hills Tower 240,000,000.00 2006

25. Kaseem DArwish Fakroo 40,000,000.00 2005

26. International Scholl of Choueifat 18,480,000.00 2004 C. JUNE 4 2000 TO MARCH 31, 2002 ( Finished project ) COMPANY : Al-Oraini Trading & Contracting Co.

Abu Dhabi, U.A.E

POSITION : Site Quantity Surveyor

PROJECT : Borouge Petro Chemical Project, Ethylene unit Al Ruwais City ( BECHTEL PROJECT )

4

DUTIES AND RESPONSIBILITIES :

Prepare quantity take off for all items shown in the drawings and compare actual quantity take off against BOQ.

Monitor all activities at site for progress billing.

Monitor project actual quantity against contract quantity.

Identify each item if it is under the scope of work or extra works.

Prepare costing for extra works.

Prepare weekly report as per requirement of General Contractor

Prepare report for office requirement. Weekly accomplishment report showing quantity, material consumption and prices.

Prepare invoice every end of the month.

Prepare all documents for project final reconciliation.

Prepare project schedule using Primavera project. D. MAY 1997 to NOVEMBER 1999 (Finished Project)

COMPANY : Al Fadeel Authority

Derna, Libya

POSITION : Quantity Surveyor / Measuring Engineer

PROJECT : Construction of 30 Storey, Derna Tourist Hotel LOCATION : Derna Libya

DUTIES AND RESPONSIBILITIES :

Prepare quantity take off for all items shown in the drawings which are required for reconciliation in monthly for a measurable contract.

Estimate must be summarized as per format in the bill of quantity. This will be used as a back up for the monthly billing.

Review the contract document in order that we have a full knowledge in the project when there is conflict in document which will lead for a variation order.

Daily monitoring at site for updating of completed works. If there are item of works that are not shown in Tender drawing but are shown in for construction drawing it must be reported immediately to QS Manager for variation order.

All quantities needed for variation order must be prepared and submited to QS manager for Cost Proposal.

Organise quantity take off together with the attachment like drawings or written instruction from the client. These documents will be used in the reconciliation to satisfy the clients representative in the approval of monthly billing and any variation encountered.

Prepare weekly report to Q.S. Manager showing quantity completed and manpower actual utilization.

Prepare monthly invoice to be check and approve by Q.S. Manager. Invoice must have a back-up reference.

Compare actual quantity against quantity in the BOQ.

Prepare estimate and costing of items not in contract. E. FEB. 1994 to MAY 1997

5

COMPANY : INDUSTRIAL TECHNOLOGISTS, INC.

2224 Pres. S. Osmena South Super Highway

Bonifacio St. Bangkal

Makati City.

POSITION : PROJECT ENGINEER / PROJECT ESTIMATOR

FIELD ENGINEER

DUTIES AND RESPONSIBILITIES

Prepare costing for all tenders participated by the company.

Responsible for materials quantity takeoff for Civil works, Structural works and Mechanical works.

Prepare special project estimate for the company such as Civil Works, Building including Concrete works and Structural works, Piping, Insulation, Blasting and Painting works.

Prepare project schedule showing duration and manpower usage.

Monitoring on site and checking of the batterboard alignment. Control Elevation for excavation of foundation. These activities were done by using instrument such Theodalite and Leveling transit.

Responsible for the aily activities of the project. Scheduling of worker to their job assignment. Prepare materials needed one month ahead before delivey. Prepare bar bending schedule to be used in actual requirement in the fabrication.

Responsible for the final inspection of rebars and forms prior to pouring of concrete.

Supervise repair blasting and painting of tanks including piping fabrication and installation pipes at site.

LIST OF PROJECT SUPERVISED

:

Feb. 1997 - April 1997

Site Development and Concreting of 3560 sq.m. park area including 800 m. of drainage 36” RCP and 24” RCP ( past track project)

( KIMBERLY CLARK PHIL., Inc. )

* Supervised 100 person *

Sept. 1996 - Oct. 1996

Tank 101 Banker oil Tank Cleaning

(NATIONAL POWER CORP. Limay Bataan )

* Supervised 40 person *

Oct. 1995 - Jan. 1996

Construction of Marine Warehouse Extension

( PETRON BATAAN REFINERY, LIMAY BATAAN )

* Supervise 100 person *

March 1995 to Aug. 1995

Construction of Two Storey Warehouse

( KIMBERLY CLARKS PHIL., INC. )

* Supervised 150 person *

Oct. 1994 to Nov. 1994

Construction of Constant Level Box and New Piping System

( KIMBERLY CLARK PHIL. INC. )

* Supervised 30 person *

6

Sept. 1994 to Oct. 1994

Installation of Compressed Air, Air Dryer,

Air Receiver Tank and New Piping .

( KIMBERLY - CLARK PHIL. )

* Supervised 15 person *

May 1994 to July 1994

Construction of MDD Building

( KIMBERLY - CLARK PHIL., INC. )

* Supervised 80 person *

May 1994 to Aug. 1994

Construction of Warehouse Extension

( KIMBERLY CLARK PHIL. INC. )

* Supervised 150 person *

Feb. 1994 to May 1994

Construction of Cartoon Warehouse

KIMBERLY - CLARK PHIL., INC.

* Supervised 100 person *

.

F. JANUARY 1990 TO SEPTEMBER 1993

COMPANY : Solid Construction Palawan Corp.

Rizal Avenue Puerto Princesa City

Palawan

POSITION : FIELD ENGINEER

DUTIES AND RESPONSIBILITIES;

Assign at site to perform and execute instruction from the Project Superintendent. .

Responsible for the final approval of all the activities done by the workers deployed. Double check all alignment of batter boards by using theodolite transit. Control excavation works by using level transit.

Responsible for the checking of steel works. Check sizes of rebars spacing, splicing requirement if all these are implemented as per plan & specification.

Responsible for pouring of concrete requirement. Checking of sump test and prepare cylinder mold to be test for compression strength.

Responsible for the inspection of formworks if the installation is conforming to the specification.

For site development work, responsible for the location of structure to be erected and also responsible for the actual survey of location where the elevation to be cut and to be filled. 7

At office, its my duty to produce quantity take off for any project that my superior gave to me. Assist tender participated by the company by the supervision of my superior. LIST OF PROJECT SUPERVISED

June 1992 to Oct. 1992

Construction of Roxas Grandstand

DPWH Roxas Palawan

* Supervised 90 person *

Feb. 1998 to April 1998

Construction of George Macolor

Multi - Purpose Concrete Pavement

DPWH Roxas Palawan

* Supervise 40 person *

Dec 1991 to Jan 1992

Site Development and Construction of

Olympic Type Oval, Palawan Sports

Complex

City Engr’s Office

Puerto Princesa, Palawan

* Supervised 200 person *

Aug 1991 to Sept 1991

Construction of 2 - CL Academic Bldg.

R.N.C.H.S. Roxas Palawan

D.P.W.H. Roxas Palawan

* Supervised 20 person *

July 1991

Regravelling of Langogan - Roxas

K.M. 130.2 to 141.80

Puerto Princesa National Road

City Engineers Office

* Supervised 15 person equipment included *

June 1991

Regravelling of Langogan - Roxas

Km 98 to 120

Puerto Princesa National Road

D.P.W.H. Roxas Palawan

* Supervised 15 person equipment included *

March 1991 to May 1991

Construction of Local Drainage

8

Manalo St. Puerto Princesa City

City Engr.’s Office Puerto Princesa City, Palawan

* Supervised 50 person *

Jan. 1991 to March 1991

Concreting of Carandang St.

Puerto Princesa City

City Engr.’s Office

Puerto Prinsesa Palawan

* Supervised 50 mem *

October 1990 to Dec. 1990

Construction of Sitio Bonatan

Multi - Purpose Pavement Roxas

D.P.W.H. Roxas Palawan

* Supervised 50 person *

Sept. 1990 to Oct. 1990

Construction of 3 C-L RNCHS Building

Roxas Palawan

D.P.W.H. Roxas Palawan

* Supervised 15 person *

Aug. 1990 to Sept. 1990

Construction of Multi - Purpose Workshop

Busy Bees E/S, Taytay

D.P.W.H. Roxas Palawan

* Supervised 15 person *

July 1990 to Aug. 1990

Construction of Umalad Bridge Bank Protection

Umalad Roxas Palawan

D.P.W.H. Roxas Palawan

* Supervised 40 Person *

June 1990 to July 1990

Construction of Tagumpay Bridge Bank Protection

D.P.W.H. Roxas Palawan

* Supervised 40 person *

May 1990 to June 1990

Contruction of 1 - CL Elementary Bldg.

Minara Roxas Palawan

D.P.W.H. Roxas Palawan

* Supervise 10 person *

March 1990 to April 1990

Constraction of San Nicolas Rain Collector

9

San Nicolas Roxas Palawan

D.P.W.H. Roxas Palawan

* Supervised 15 person *

Jan 1990 to March 1990

Construction of Extension Roxas Seawall

Poblacion Roxas Palawan

D.P.W.H. Roxas Palawan

* Supervise 80 person *

PERSONAL PARTICULARS

Date of Birth : 06 January 1966

Nationality : Filipino

Professional License No. : 56933

EDUCATION BACKGROUND

Professional License (Passed Board/Bar/Professional License Exam) Major : Bachelor of Science in Civil Engineering

Institution/College : St. Mary’s University, Philippines Graduation Date : Mar 1989

Certification : Certified Civil Engineer (1989)

TRANING & SEMINARS (CONTINUING PROFESSIONAL DEVELOPMENT-CPD)

- Tendering and bidding Evaluation Class - July 2011

- C-204 Construction and Estimating Candy ( CCS CANDY) - February 2011 REFERENCES

Naser Ziadin

Assist. Head of Tendering Dept.

Al Jaber Trading & Contg Co. WLL.

Mob. No. 6626-21-53

Allan Smith

Sub Contract Administrator

Bechtel

U.A.E. ( Petro Chemical Project )

William A. Gillespie

Project Manager

Al Oraini Traiding and Contracting Co.

United Arab Emirates

10

Mcray Ducan

Senior Q.S.

Al Fadeel Authority

Derna Libya

Joel D. Dinorog

Project Manager

Industrial Technologists, Inc.

Pres. S. Osmena South Super Highway

Bonifacio St. Bangkal Makati City

Leonardo S. Baluyut

Resident Manager

Solid Construction Palawan Corp.

Rizal Avenue, Puerto Prinse City

Palawan

Certified correct:

Rene S. Alindada



Contact this candidate