Post Job Free

Resume

Sign in

Engineer Assistant

Location:
Bhubaneswar, Odisha, India
Salary:
in personal
Posted:
March 13, 2019

Contact this candidate

Resume:

RESUME

Ghanashyam Panda.

Phone: 943-***-****

At: Rajendra Bihar, A/009, Forest Park,

Po: Bhubaneswar, Dist.- Khurda. Pin: 751009

E-Mail: ac8rwb@r.postjobfree.com

CAREER OBJECTIVE:

To be associated with an organization where I can exhibit my skills and be instrumental in organization growth. To innovate and deliver an excellent value to the organization through dynamic, vibrant attitude and team work in Construction of Civil Structures with challenging work Targets, where there is a high level of learning involved and which make the best of use of my skills and abilities. (Working as a Assistant Executive Engineer under the pay role of Works Department, Government of Orissa. I have submitted my voluntary retirement from the Government job & Prepared to work in any Construction Company) ACADEMIC QUALIFICATION:

• Passed HSC from Board of Secondary Education,

Orissa, during 1978 with 55% marks

• Diploma in Civil Engineering,

from 1978 to 1982 with 72% marks

Name of the Institution:

Brahmapur Engineering School, Orissa.

Under: State Council of Technical Education and

Training, Orissa, Cuttack.

OTHER QUALIFICATION:

• Attended 2 nos Annual Training Camp in 1978

&1979 in Senior Division NCC and 1 no Army

Attachment Camp in 1980. Passed Certificate ‘B’

Examination of NCC in 1980 & Certificate ‘C’

Examination of NCC in 1981.

• Completed Computer course in PGDCA & Diploma

in CUTOCAD DURING 2005.

• Convergent of preparation of Estimates & Analysis of projects with MS Office Excel Document.

CURRENT SALARY: Rs: 9,00,000.00 Lakhs per annum with other incentives in the pay role of Government of

ODISHA.

EXPECTED SALARY: Rs: Negotiable

WORKING KNOWLEDGE IN CIVIL ENGINEERING & TECHNICAL ABILITY: Presently working as an Assistant Executive Engineer under Government of Orissa, Works Department, since January 2015.

October 2017 till today as Assistant Executive Engineer In charge of supervision of construction and maintenance of different Building works at Puri as well as supervision building works of Construction of Government Medical College at Puri amounting to Rs 205 cores executed by L&T. January 2015 to October 2017 till today as Assistant Executive Engineer Completed 75 Km of Double Lane Road includingmore than 200 no’s of different size Box Culverts and RCC Culverts, including 30 Km of Ghat Road with Retaining walls, Brest Walls, Side Drain and Toe walls. Completed 6 nos of High Level Bridges with Approach Road and another 15 no’s Bridges in Progress. Besides that Pre Quality Assurance and Quality Control works for Road, CD & Bridges and its records are also carried out under my guidance in remote areas of Kandhmal District.

2013- 2015 (as Assistant Engineer in Works Department in the pay role of Government of Odisha)

Engaged in Consultancy works such as Survey, Investigation & Soil Exploration works. Preparation of BOQ for State High Ways including Cross Drainage works, High Level Bridges. Preparation of LS & CS drawings for roads, computation of quantities of Earth Work, Preparation of drawings of Culverts, Bridges & Buildings. Preparation of Estimates for all structures, including Quantity calculation and Quality Control of all works. Supervision of Double Lanning Road Works with Cross Drainage Structures and Protection works in Hill Roads as well as Bridge Structures and Construction and Maintenance of Various Building works.

2008- 2013 (1982 to 2013 as Junior Engineer in Works Department in the pay role of Government of Odisha)

Survey, Investigation & Soil Exploration works and Preparation of BOQ for several road & Bridge works. Preparation of Landscaping & Lay out Plans for Real Estates, Plan for High Rise Buildings, Duplex and Peripheral Ornamental works for real estate development. Design and execution of driven piles up to 350mm dia. for Building works. Execution of Fly Over of 800 meter length with 1200 mm dia. Pile foundation including Quality assurance works. 2005- 2008

In charge of Construction of HL Bridge over river Salunki on Phulbani Gochapada Road & 5nos of HL bridges over Ranipathara river on Phulbani Tikarapada road in Kandhamal District, completed construction of HL bridge over river Pila Salki on Phulbani Gochapada road in Kandhmal District in the State of Orissa under the pay role of Works Department (Roads & Buildings). Immediate Restoration works of Flood & cyclone during 2006 August & September. Survey, Investigation & Soil Exploration works and Preparation of BOQ for more than 100 km road & 12 nos of High Level Bridges. 2002-05

Construction and Maintenance of Medical College and Hospital Buildings of MKCG Medical College Campus at Brahmapur in the state of Odisa. 1998-2002

Immediate restoration and restoration works such as cleaning the road due to blockage by falling big trunk trees, breach closings scoured roads for immediate traffic for movement of relief & rescue vehicles due to super cyclone of 1999. Completion of World Bank Assisted road projects with all field Quality control works for 5.00 km within the stipulated period. Survey, Investigation and Preparation of project reports with Sub Soil Exploration works for 5 Nos of different roads around 100.00 km length for World Bank and NABARD Assistance.

1995-1998

Completion of building projects with provision of Bored Piles & Bored Compaction Piles for Industrial Training Institute, Collector’s Residence, Superintendent of Police’s residence and many other prestigious buildings for newly created District, Boudh along with survey, investigation and preparation of projects reports of (74 span) 4 spans of 18.975 mtr each and 70 spans of 25.45 Mtr each for construction of H.L. Bridge over River Mahanadi near Boudh in Orissa.

1989-1995

Completed Construction of Bridge with its Approach of 132 KV line Road with all Quality control tests, near Adava in Orissa. It includes 1 no High level Bridge of 2nos of 24 m at center & 2nos end spans of 12 m & 1no of 20m span and 20.00 Mtr high level bridge & 3.00 km road work.

1987-1989

Completed the construction with Quality control test of the work Construction of one submersible bridge of 4 spans of 10 Mtr and re-alignment and regarding of ghat road of 5.00 KM along with the survey and investigation and preparation of DPR.

1982-1987

During this period I have completed DPR of a building project for National Agricultural Research Program of OUAT at G Udayagiri in Orissa, and executed the construction work of 13 nos of residential Quarter including Administrative Block & Hostel of the same project. Besides that I have completed the works of Jail inmate buildings, Hostel building of Govt. College with all necessary Quality control works, along with survey, Investigation and preparation of DPR for 7 Nos Minor Bridges on SH- 7(A) including Sub Soil Exploration works.

JOB RESPONSIBLITIE:

• Engaged in Executing, construction and maintenance of Road, Bridge, Buildings projects and other similar structures as per approved Drawing Design &

Specification.

• Preparation of Project Reports, Survey &

Investigation works Drawings, Estimates and BOQ.

• Supervision of different Civil & Structural works.

• Managing a team of technically skill personnel to for execute works.

• Execution of Immediate restoration works during

Cyclone & Flood for.

PERSONNEL DETAILS:

Name of Father Sri Ganapati Panda.

Date of Birth 19th August 1962.

Nationality Indian.

Languages Speak, Read & Write Hindi, Oriya & English. Hobbies Writing Scripts, Song, Listening Music, Sing & Listening Songs

(Ghanashyam Panda)

SIGNATURE OF CANDIDATE



Contact this candidate