Throughout career, involved in all aspects of power generation, including new construction and installation of numerous types of equipment inside and outside of fossil fueled and gas fired power plants.
Superintendent involved in the construction of 4 new combined cycle power plants, from site preparation to units ready for commercial operation.
General Superintendent in charge of planning, estimating, scheduling, cost control, negotiating and supervising SCR projects, gas turbine installations, and numerous turbine and boiler overhauls, retrofits and repairs, unit turnarounds and emergency outage repairs, as well as day-to-day plant maintenance.
Supervisory experience includes working with all levels of management, managing contractors, craft labor, in-house plant maintenance crews, and non-union labor.
Experience supervising and planning, cost tracking, scheduling of projects involving craft labor, boilermakers, millwrights, ironworkers, pipefitters, and subcontractors.
Comprehensive knowledge relative to construction bid evaluation and clarification up to and including award of contract, as well as field supervision of contractor.
EMPLOYMENT
Employed in various capacities depending on the project at fossil fueled and gas fired power plants. Positions have included Owners Site Representative, Lead Superintendent, General Superintendent, Superintendent, Construction Field Engineer, Project Manager, Field Supervisor, Maintenance Supervisor, Planner, General Maintenance Foreman, and Station Mechanic. Experience writing work scopes, reviewing specifications, estimating costs, receiving and evaluating bids, awarding contracts, planning and scheduling work, coordinating and supervising crafts. Ensured projects were completed on-schedule and within budget with little or no interruption to the stations day-to-day operations.
INNOVA GLOBAL LTD. 2018
DEMARK INC. 2016 - 2018
BREEN ENERGY SOLUTIONS 2015 to 2016
THE ENERGY GROUP 2015
BREEN ENERGY SOLUTIONS 2014 to 2015
NATIONAL STEEL CITY 2014
BREEN ENERGY SOLUTIONS 2011 to 2014
DAY & ZIMMERMAN NPS 2007 to 2010
SHAW, STONE & WEBSTER 2005 to 2006
POWER MAINTENANCE RESOURCES, INC. 2004 to 2005
PERFORMANCE MECHANICAL, INC. 2004
DAY & ZIMMERMAN NPS 2003 to 2004
PHILLIPS, GETSCHOW COMPANY 2000 to 2003
COMMONWEALTH EDISON COMPANY 1974 to 1999
PROFESSIONAL DEVELOPMENT
OSHA 30, STS - Safety Trained Specialist, SQS Safety Qualified Supervisor, Supervising for Results, First Line Supervisor, Respirator Fit Testing, Half-Mask, PAPR, Supplied Air, SCBA, Confined Space, Scaffold Inspection, Lock-Out Tag-Out, ASME, AWS Familiarity, EEOC, Diversity, Sexual Harassment in the Workplace, First Aid, CPR, CMMS and SAP. H.S. Diploma
FREDERICK A. DUNN
PROJECTS
Innova Global Ltd.
Superintendent
Lead superintendent managing subcontractors installing all building facilities for and enclosures for a 700 MW power plant. The main structures include ground up construction of building and all internal components, MEP
The buildings include an administration and control room, Water Treatment building, Maintenance and warehouse building, CT enclosure building, ST enclosure building and a gas compressor building.
Demark Inc.
Construction Manager
TVA New Johnsonville, Co-Gen Project. Perform construction manager duties during the construction of a Nooter Erickson HRSG to an existing G.E. 7EA CT. and two Foster Wheeler Aux. Boilers, the construction of a transfer pump house with 2 pumps and two air compressors and all below and above ground piping and valves. Installed two new transformers for the addition of two new substations. In addition to the transformer installation we also replaced the existing bus duct on two other transformer along with 3 bushing replacements. In addition to that construction there was also a forwarding pump house with all piping and valves from the existing Demin tank. Oversight of all mechanical activities including all underground piping, gas, water, air and fire protection and potable water. Oversight of the installation from ground up construction of the Auxiliary Equipment Building containing 3 Boiler feed pumps, two main air compressors a Chemical sample table and all associated piping valves. After completion of construction assisted with the startup and turnover team to perform group walk downs, equipment testing and work package reviews for turnover to the plant for commissioning of the units. The supervision of the craft included boilermakers, pipefitters, operators, ironworkers and support craft. During the final phases of construction, I also managed the replacement of all bus duct for U-19 and U-20. In addition to demo of the existing plenum, exhaust duct and stack on U-11 and U-3 and the reinstallation of new plenum and exhaust duct and stack for the same units.
Owners Rep./Site Lead
Dominion Energy, Chesterfield Station. Perform contractor oversight for the overhaul of a VOGT HRSG including a performance efficiency upgrade, replaced 20 low pressure harps and modified the LP doghouse. Removed and replaced superheat and reheat harps and reinstalled modified harps for each system, also replaced 3 rows of HP evaporator harps. The scope included a new HP modified floor section and new modified HP doghouse.
Breen Energy Solutions
Site Manager at Indiana University steam plant, managing the demolition of two existing environmental systems, one ACI system and one DSI system which were no longer operational. Installing two new complete injection systems, ACI/DSI including all major components, control systems and integration to existing operating software. Managed installation of all new piping and operating valve systems. Managed start up and training of plant personnel.
The Energy Group
Owners Rep. / Outage Co-coordinator at Prairie State Generating Company, performing contractor oversight on two outages on twin 900 MW coal fired units. The work included but was not limited to, major tube replacement in the superheat platen section, burner modifications and repairs, complete water wall inspection and other miscellaneous tube replacements. The replacement of two layers of catalyst from both reactors and both units and the installation of one layer in each reactor. The overhaul of two pulverizers and numerous repairs to the other ten. The replacement of numerous valves throughout the power block as well as rebuilding eight recycle pump suction valves.
National Steel City
Superintendent at Plant Gorgas, supervising craft employees during ground up construction of a B&W Baghouse and associated ductwork, including all boiler outlet duct gas to Baghouse inlet duct, all exhaust duct gas from baghouse outlet duct to booster fan inlet ducts, including installation of two booster fans and booster out fan exhaust duct to a dual unit scrubber.
Breen Energy Solutions
Site Manager at numerous power plants, Oak Grove Station, Crystal River Station, Stanton Electric Generating, Plant Bowen, Plant Hammond, Belews Creek Station, Mobilize, demobilize, and manage the installation, demobilization and day-to-day operations of temporary sorbent Injection at coal fired plants to reduce pollutants; S03 and acid reduction as emitted from the stacks.
Day & Zimmerman
Site Manager at the OAK CREEK POWER PLANT, for a four-unit coal fired generating station managing multiple outages on 4 Units as well as performing day to day maintenance. Installed a Pratt & Whitney Shock Wave System on the backpass of the boiler. Built a new demineralizer in the plant to replace the existing one.
Shaw, Stone & Webster
General Superintendent at the NRG DUNKIRK GENERATING STATION, managing multiple boiler and BOP outages. Constructed and installed and all new Economizer wet/dry fly ash transport system From the bottom of the economizer to the new wet ash storage silo including all piping, valves and transport equipment
Site Manager at the NRG SOMERSET GENERATING STATION, for a complete rebuild and re-tube of auxiliary boiler, including casing removal and replacement, and removal and replacement of 624 steam drum to mud drum tubes.
Site Manager at the OSWEGO GENERATING STATION, for a complete overhaul and re-tube of a Westinghouse 800 megawatt steam condenser, including tube removal and replacement, and major internal repairs. Managed the demolition and installation of and all new waste transport system.
Power Maintenance Resources
Project Manager at LAPALOMA GENERATING STATION, for overhaul and major FSI work on four Alstom GT 24 combined cycle 250 megawatt units, and complete scope of BOP maintenance and repairs, including major turbine component replacement utilizing a multi craft labor force.
Pittsburgh Mechanical
Lead Superintendent at PASTORIA ENERGY CENTER, for a piping contractor building a 750 megawatt combined cycle power plant, three GE 7 FAs, three Nooter Erickson HRSGs, a GE A-10 and GE D-11 steam turbine. Supervising the installation of all mechanical piping, valves and all associated equipment to operate the units.
Day & Zimmerman
General Superintendent at TVA JOHNSONVILLE FOSSIL PLANT, supervising multiple craft employees performing Boiler
Outage work and condenser re-tube and economizer tube replacement on 2-100 megawatt CE boilers.
Lead Superintendent/ General Superintendent at TVA CUMBERLAND CITY FOSSIL PLANT, managing seven superintendents and 580 multiple craft employees in the construction and turnover of a Selective Catalytic Reduction System for a 1350 megawatt coal fired boiler.
Phillips Getschow, Mechanical Construction
Lead Superintendent at NRG INDIAN RIVER OPERATIONS, for boilermakers performing condenser tube replacement.
Superintendent at AMEREN ENERGY COFFEEN STATION for boilermakers and pipefitters on back-to-back two week Boiler Outages on two B&W boilers, performing tube replacements in cyclones, water walls, reheat and superheat pendants. Repaired GR duct and GT duct cracks, replaced GR duct inlet dampers and scroll liners, repaired penthouse roof and slag tanks.
Superintendent at Coffeen Station for multi-craft crew in the demo and reinstallation of a new 500 ton per hour coal crusher and feeder and coal bunker and the installation of a new cooling pond piping and pump installation for the purpose of lake water temperature reduction.
Superintendent at CITY OF SPRINGFIELD CWLP for boilermakers for mud drum tube swedging and seal welding and cyclone tube and stud repairs of Foster Wheeler boiler, including preparation of cost tracking per job, final cost tracking, and an outage report.
Project Manager and Lead Superintendent at AMEREN ENERGY ELGIN ENERGY CENTER for repair work on four 125
Megawatt Siemens Westinghouse D 501 combustion turbines. Provided cost estimates and schedule for repairs.
Lead Superintendent Elgin Energy Center for construction and installation of four Siemens Westinghouse D 501 combustion turbines and generator. Including all, civil, mechanical, and boiler work associated with a brand new power facility.
Lead Superintendent at MIRANT ENERGY SUGAR CREEK POWER PLANT for the installation of two GE 7 FA combustion turbines and generators. Led boilermakers, millwrights, ironworkers, and subcontractors. Planned and executed set-up of construction site, mobilization, and demobilization upon project completion.
Site Manager at MIDWEST GENERATION WILL COUNTY STATION and JOLIET STATION #9. Supervised air heater basket
removal and inspection, diaphragm and double diaphragm weld repairs, seal replacement, new basket installation and removal and installation of the pin rack, and gear box repair. Also the installation of a new over fire air system to a 350 megawatt B&W cyclone boiler including all tube removal and installation of new reconfigured tube panels.
Site Manager at AMEREN ENERGY NEWTON STATION, supervising boilermakers and pipefitters during overhaul on
combustion engineering tangential furnace for 800 megawatt unit, repair work including secondary superheat pendent replacement.
Boilermaker Joined the boilermakers local 107 in 2000.
Commonwealth Edison Of Chicago
Owners Site Representative at the COMMONWEALTH EDISON FISK STATION for the removal and installation of 36” hot reheat header from boiler outlet header to turbine intercept valves and from turbine intercept valves to reheat turbine cylinder. Supervised overhaul on an Allis Chalmers 380 megawatt cross-compound turbine generator set HP/IP, dual flow LP, including replacement of the HP steam chest..
Owners Site Representative at the COMMONWEALTH EDISON POWERTON STATION in the overhaul of a GE 800
megawatt steam turbine generator. Unit consisted of H.P. - I.P. and two dual flow L.P. rotors.
Owners Site Representative at the COMMONWEALTH EDISON JOLIET STATION 29 in the overhaul of electro static
precipitator, and the overhaul of three Lungstrom air preheaters.
Owners Site Representative on numerous construction projects throughout the COMMONWEALTH EDISON Fossil System.
Superintendent at the STATE LINE STATION in the overhaul of a Westinghouse 325 megawatt cross-compound steam turbine. Also General Maintenance Foreman, supervising day-to-day maintenance in the continuous operation of a four unit station in the Commonwealth Edison System. Supervised three de-stack/re-stacks on the Westinghouse 325 megawatt cross-compound L.P. turbine. Began career in the industry as a Station Mechanic, working on turbine outages and day-to-day plant maintenance.
Military Service, USAF During my career in the military I served in Anchorage AK. And in New Jersey, my primary job duties were in electrical power production, which consisted of servicing all diesel backup generators for the air base, maintaining and performing routine maintenance on a daily basis.