Manish Paul
+965******** & 919********* ac8n6x@r.postjobfree.com
9
electronic & instrumentation engineer
Synopsis
11+ years experiencedElectronic and Instrumentation Engineer with diverse experience spanning oil pipelines- flow station and terminal the capacity of Operation and Control Engineer.Has consistently demonstrated the ability of being able to improve effective working practices, use of facilities and materials. Experience entails working in India,Nigeria, DR Congo and Kuwait. Conceptualises the processing for product development with careful and sophisticated quality controlmeasures in compliance withinternational standards. Skilled at performing root-cause analysis to prevent reoccurrences and defective issues. Experience includes, but does not limit to, managing operations within crude,oil, ATF, multi product terminals, tank form and pipelines for flow station.
Computing Skills: MS Office packages and Windows OS
Professional Degrees& Training
PG. Diploma in Pipeline Operation, Indian School of Petroleum, 2009
B. Tech in Electronics and Instrumentation, B.B.I.E.T&R.C., Uttar Pradesh Technical University, 2007
Training
Application Software (APPS) for Leak Detection in Pipe Line
Supervisory Control and Data Acquisition (SCADA) System and Programmable Logic Controller (PLC)
Aviation operation & Quality control training by HR Hansa consult ME JLT.
Fire and Safety & First Aid
Total Country Exposure
India, DR Congo and Nigeria
Career Progression
Kuwait oil Company through I.S.C.O (Kuwait)
Superviser pipeline May 17 onwards
Direct and coordinate the activities of employees engaged in the operation and product stock calculation .
Confer with supervisors to coordinate operations and activities within or between departments. Maintain pipeline flow rate with the help of main line pump and booster pump. Provide sufficient suction to mainline pump
Effectively use and train employees on PLC and SCADA based monitoring system to oversee and manage the operation. Manage the operation of all sections of the plant monitoring & control systems, pipelines and metering system
Handling pipeline operation of following product such as crude line, Heavy fuel oil, LHFO, Gas oil and Fuel Gas.
Managed key aspects of quality control, pigging, planning and scheduling as per requripment.
Hindustan Mittal Pipeline Limited Crude Oil Terminal through Aarvi Encon Ltd
Shift In-charge Jan 16 – May 17
Direct and coordinate the activities of employees engaged in theoperation and product stock calculation of fourteen tank capacity of 60000 KL for each tank
Confer with supervisors to coordinate operations and activities within or between departments. Maintain pipeline flow rate with the help of main line pump and booster pump. Provide sufficient suction to mainline pump
Effectively use and train employees on PLC and SCADA based monitoring system to oversee and manage the operation. Manage the operation of all sections of the plant monitoring & control systems, pipelines and metering system
Oversee the operation of production, utilities and pipeline & crude oil terminal facilities to achieve safety, productivity and cost standards
Monitor routine plant and equipment operations including start up, shutdown and monitoring.Perform first line maintenance and reporting faults on plants and equipments
Ensure that all records/logs/certificates are maintained and updated for safe operations.Monitor maintenance and construction work sites to ensure compliance with Permit to Work and company standards
Perform proper unloading of crude oil vessel through SPM in storage tanks. Key equipments and facilities maintained include valves, pump and generator, and process pipeline 4 crude blending system
Plan and executeshift as measured by pumping and vessel receipts. Prepare stop dip plan in accordance with ullage in tank. Receive crude through single point mooring (through vessel). Technical deliverables include PIG lunching, receiving and tracking in suction valve (SV station)
Ensure effective ETP (Effluent Treatment Plant) plant operations. The operationsentail multiple stages including inlet sump, equalization tank, tilted plate interceptor, mixing (flash and flocculation mixing tank), dissolved air flotation, filter feed, filter (pressure sand and activated carbon filter ) and wet slop tank operation
Yada Barge Ltd, Nigeria
Senior Engineer Operations Aug ’15-Jan ‘16
Managed Operation and Maintenance activities associated with crude oil pipeline, crude oil tanks, vertical cylindrical tanks and associated HOV’s and instruments
Planned and filled barge and oversaw transportation/movement into various location. Dealt with operational matter and recordfor the company
Assisted with training by positively reinforcing successful performance and giving respectful and encouraging coaching as needed. Heldoverall accountability for operation and product stock calculation
Involved in tank handling and pipeline of crude product. Loaded and unloadedcrude in Barge and cargo ship using the floating facility (pontoon pump station) operation
Additional deliverables included maintenance of valves(globe, plug, gate and ball), pumps and generators
Served in the capacity of Baoding Officer during STS operation in VLC ship and planned movement of vessel in according to ocean tied. Gained excellent working knowledge of vehicle maintenance
Tristar, DC Congo(UNO Mission)
Assistant Manager - Maintenance Nov ’12 - Jun ‘15
Reviewed production, quality control, and maintenance reports and statistics to plan and modify maintenance activities. Inspected operating machines and equipment to ensurecompliance with operational standards
Regularly managed operation and product stock calculation in all tanks.Involved in tank handling and pipeline of ATF product (Aviation Turbine Fuel)
Accountable for maintaining Fire & Safety and P/L in addition to managing pump fire engine, diesel vehicle, generator maintenance and engine overhauling
Prepared timely reports enabling senior management to make informed business decisions. Involved in tank truck loading and unloading through gantry pump (Gantry operation) with selective tank
M/R Issues (Mechanical)
Vehicle maintenance (engineer overhauling, ABS system, clutch, gear box, alternator, starter, and servicing plan according to running kilometre of each vehicle)
Generator maintenance (engine overhauling, alternator, starter, pressure switch, sensor, injector, injector pump, voltage regulator) and servicing according to running hours (changing of oil, fuel and air filter)
Different test and change conduct in aviation refuelling vehicle in accordance with schedules such as membrane test, hose testing, fuel filter and separator checking
Hindustan Petroleum Cooperation (I.S.P payroll)
Operation & Maintenance Officer Dec ’10-Nov ‘12
Served MDPL-HPCL, Rajasthan within the multi product pipeline intermediate pumping station in the capacity of Contract Engineer
Involved in tank handling and pumping associated with main line pump 6.6 KV operation pump. Pumped and managed operation of petroleum product (MS,HSD and SKO) as per ullage in tanks
Managed key aspects of quality control, interface handling, pigging, planning and scheduling. Prepared receipt and delivery documentation
Monitored sump tank level and all critical parameter to ensure compliance with operation.
Supervised and managed safety and security of pipeline and ROU through GPS based STS tracking.
Demonstrated excellent knowledge of working with permit system.Maintained all types of static and rotary equipment. Installed and aligned inspection of equipment, vessels, tanks, and static and rotary equipment
Maintained pipeline flow rate, pumps inlet pressure and outlet pressure
M/R Issues (Mechanical)
Valve maintenance for globe, plug, gate and ball valves
Managed the pipe line erection due to tapping, JCB malfunction and other issues
Indian Oil Sky Tanking Ltd
Operation & Maintenance Officer Mar ’10-Dec ‘10
Worked on the8 kms long ATF product transportation pipeline in T3 terminal, New Delhi Airport. Entirely automated the pipeline operation and oil terminal process using PLC’s and empowered operations with SCADA
Involved in tank handling and pumping associated with pump. Monitoredcathode protection and TLP
Maintaining proper pressure in hydrant systems. Technical managed PLT and tank truck loading, settling time in tank, water draining, quality check and delivery of aviation hydrant fuel system with proper documentation
Accountable for tank truck unloading operation through Gantry pump
M/R Issues (Mechanical)
Filter and water separator, filter monitor, strainer etc replacement and maintenance
Fire & Safety and associated maintenance of DCP,CO2, FTP, Fire-Tender and Hydrant Line
MDPL-Jaipur
Operation & Maintenance Officer Jan ’08-Mar ‘10
Served withinIndia’slargest multi-product (HSD, MS&SKO) transportation pipelineencompassing 1053 KM. Involved in tank handling, pumping associated with main line pump 6.6 KV operation pump
M/R Issues (Instrumentation)
Cathodes protection system
Effluent treatment plant
Corrosion monitoring system
Fire sensor, density meter, temperature, pressure and flow meter
M/R Issues (Mechanical)
M/R issues of booster pumps and main line pumps
Basket filters, MOV,PCV, FCV, TSV, and flow-turbines
Fire & Safety and associated maintenance(DCP,CO2,FTP, fire-tender and hydrant line)
Additional Information
Date of Birth
20th August, 1982
Nationality
Indian
Interests
Ideation and networking
Languages
English, Hindi and Bengali
References
Available upon request
PLC & SCADA based Operations
Controls
Management
Stakeholder Management
Instrumentation Engineering
24*7
Operations