RESUME
NAME : PRASHANT HANAMANT PHADTARE.
DATE OF BIRTH : 27th April 1982
MARITAL STATUS : Married
PERMANENT ADD. : At/Post – Visapur, Tal – Khatav,
Dist – Satara, Pin – 415502.
CONTACT NO : 942-***-****
E-MAIL ID : ac8ltd@r.postjobfree.com
NATIONALITY : Indian
LANGUAGE KNOWN : English, Hindi, and Marathi.
EDUCATIONAL QUALIF. : H.S.C. Passed
COMPUTER QUALIF. : Diploma in windows application passed.
TECHNICAL QUALIF. : N.C.T.V.T. Exam Passed on Boiler Attendant
With first class (April 2003 In Mumbai)
1st Class Boiler Att. Exam passed (June 2006)
EXPERIENCE DETAILS : Total 10 Years
PRESENT COMPANY : BRIDGESTONE INDIA PVT LTD. PUNE
As a senior first class boiler attendent
Two Boilers LDO&GAS Fired Boilers
Make
Capacity
Heating surface
Working pressure
Fuel
Thermax ltd.
15TPH
418M2
22.0 kg/cm2
LDO&GAS
Thermax ltd.
06TPH
119 M2
22.0 Kg/cm2
LDO&GAS
Handling Both boilers With PLC control system.
Experience in boiler erection, maintenance & operating.
Handling Boilers,comprerssors, Chillers, DM Plant & Soft Water Plant,RO Water plant With PLC control system.
PREVIOUS COMPANIES
PRIVILEGE INDUSTRIES LTD.SATARA.
4 MW Power plant, BREWERY& DISTILLERY.
As a First Class Boiler Attendent
( From Dec 2010 to March 2012 )
One oil fired boiler & two coal fired (FBC)boilers
Make
Capacity
Heating surface
Working pressure
Fuel
Thermax ltd.
10TPH
215M2
10.5 kg/cm2
Furnace oil
Thermax ltd.
24TPH
1510 M2
44 Kg/cm2
Coal
Thermax ltd.
08TPH
386 M2
44 Kg/cm2
Coal
Handling Both boilers combine Capacity 32TPH one of them is Under Bed Feeding System. With PLC control system.
Experience in BDFB boiler erection, maintenance & operating.
Co-generation Experience of 4Mw power generation.
Experience in coal handling plant erection, maintenance & operating.
Experience in ESP plant eraction, maintenance & operating.
Experience in ASH handling plant erection, maintenance & operating.
OSWAL F.M.HAMMERALE TEXTILES LTD. KOLHAPUR
As a First class Boiler Attendant
(Aug 2007 TO Nov.2010)
One Bagasse and coal fired (FBC Boiler)
Make
Capacity
Heating surface
Working pressure
Fuel
Thermax ltd.
12 TPH
503 M2
10.5 Kg/cm2
Coal & Bagasse
Handling 1 FBC Coal Fired Thermo – Pac Capacity 15,00000 Kcal/Hr Under Feeding Bed System & Water Treatment Heat Exchanger System
Experience in coal handling plant erection, maintenance & operating.
TESSITURA MONTI INDIA PVT LTD.. KOLHAPUR.
As a First Class Boiler Attendent
(July 2003 TO Sep 2007)
Two Oil fired Boilers and Two waste heat recovery Boilers.
Make
Capacity
Heating surface
Working pressure
Fuel
Transperent ltd.
05TPH
140 M2
15 Kg/cm2
Furnace oil
Transperent ltd.
05TPH
140 M2
15 Kg/cm2
Furnace oil
Transperent ltd.
1.5TPH
430 M2
15 Kg/cm2
Waste Heat
Thermax ltd.
750KG
424 M2
15 Kg/cm2
Waste Heat
BAYER INDIA LTD. THANE.
TWO & Half years as Apprentice of Boiler Attendent.
(April 2000 To April.2003)
Three Oil Fired Boilers & One Waste Heat Recovery Boiler.
Make
Capacity
Heating surface
Working pressure
Fuel
IEAC ltd.
05TPH
121 M2
42 Kg/cm2
Furnace oil
IEAC ltd.
10TPH
261 M2
25 Kg/cm2
Furnace oil
IEAC ltd.
10TPH
294 M2
07 Kg/cm2
Furnace oil
Thermax ltd.
07TPH
595 M2
16 Kg/cm2
Waste Heat
ROLE AND RESPONSIBILTY
Responsible for all activities related to operation of boiler plant, preventive maintenance and all troubleshooting of boiler sets and its auxiliaries like soft water plant, DM water plant, feed water pumps, various types of mounting, fitting, burners and various types of valves etc.
To efficiently and effectively handle shutdown, start-ups and other operational disturbance.
I am requesting to you to please give me an opportunity to work in your organization.
Yours Faithfully
prashant phadtare