Post Job Free

Resume

Sign in

CAD Designer Drafter

Location:
White Hall, IL
Salary:
45000
Posted:
February 22, 2019

Contact this candidate

Resume:

Bradley Elder

Phone: +1-217-***-****

ac8ksy@r.postjobfree.com

OBJECTIVE

CIVIL/STRUCTURAL DRAFTER DESIGNER with experience in development and production of civil and structural drawings related to roadways, bridges, buildings, concrete pavement rehabilitation, drainage, signing and pavement markings, signalization, utilities, telecommunications, lighting and sanitary & storm water systems, structural and concrete plans, construction management, sections, foundations, steel members and welding. Well-versed in the application of Basis of Estimates Manual, Plans Preparation Manual, Design Standards, M.U.T.C.D., utility relocation and technical specifications. Related areas of expertise include:

EMPLOYMENT HISTORY

CAD Designer

Greene & Bradford, Inc.

June, 2017 — July 2018

Roadway & Bridge Design and Drafting utilizing Power Geopak V8i Select Series 4

Stocker & Cashier

Hy-Vee

December, 2016 — May, 2017 (5 months)

Warehouse worker

Innovative Staffing Solutions, Inc.

September, 2014 — May, 2016 (1 year 8 months)

Designer

BRW

October, 2013 — February, 2014 (4 months)

Drafter

Pegasus TSI

March, 2013 — May, 2013 (2 months) Temporary Position

Cart Volunteer

Oak Hill Hospital

February, 2013 — April, 2013 (2 months)

OTR Driver

Central Refrigerated Service, Inc.

January, 2012 — May, 2012 (4 months)

Roadway/Transportation Designer

Cumbey & Fair, Inc.

August, 2005 — January, 2011 (5 years 5 months)

Significant Projects:

SR 600 Gandy Blvd, Pinellas County, FDOT District 7, Concrete Pavement Rehabilitation SR 686, Pinellas County, FDOT District 7, Concrete Pavement Rehabilitation SR 600, Baker St, Hillsborough County, FDOT District 7, Concrete Pavement Rehabilitation SR 685, Florida Ave, Hillsborough County, FDOT District 7, Concrete Pavement Rehabilitation SR 60, SR595, SR694, Pinellas County, Drainage Improvements SR 533, Pasco County, FDOT District 7, Concrete Pavement Rehabilitation SR25/US27, Polk County, FDOT District 1 Major reconstruction of concrete pavement, expansion from existing four lanes to six lanes; Responsibilities include roadway geometrics, signing and pavement markings, traffic control, utility adjustments & relocation, telecommunication lines and quantity calculators using the Design and Computation Manager

Project was completed using Microstation V8, Geopak, Guidsign, Sheet Navigator, and FDOT Electronic Delivery

Town of Redington Shores, Phases 2, 3, & 4, Stormwater Management System Improvements Various McDonald's and Taco Bell civil site developments in the Tampa Bay area Columns at Bear Creek Subdivision Site Construction Plans Columns at Alafia Subdivision Site Construction Plans Responsibilities include roadway geometrics, signing and pavement markings, traffic control, utility adjustments & relocation, telecommunication lines and quantity calculators using the Design and Computation Manager

Project was complete using AutoCad 2006, 2007 and Autodesk Land Development Desktop.

Civil Designer

HDR, Inc

July, 2003 — August, 2005 (2 years 1 month)

Significant Projects: US19, Pinellas County, FDOT District 7, Clearwater, FL Pavement rehabilitation and widening. I4, Hillsborough County, FDOT District 7 Extensive maintenance of traffic design Okaloosa County, FL, Hurricane Ivan Clean-up, FEMA Debris management in the aftermath of Hurricane Ivan - Duties included working with contractors to clean up trees, building materials, and other debris that was associated with the hurricane

Civil Engineering Technician

Robert H. Anderson

September, 2002 — March, 2003 (6 months)

Roadway projects drafted using Microstation J & V8 along with Inxpress

Civil Designer

Epstein &Sons

April, 2002 — September, 2002 (5 months)

Significant Projects:

Eastern Illinois University 7th Street Closing and Pedestrian Boulevard located in Charleston, IL.

Prepared structural and civil working drawings utilizing AutoCad 2002.

Lakeshore East Development Phase 1 Bridge Redesign project

Prepared structural and civil working drawings utilizing Microstation J.

Civil Designer

Clark-Dietz, Inc

October, 2001 — March, 2002 (5 months)

Significant Projects:

Illinois Rt 38 roadway project, IDOT, Rochelle IL. DuPage County Forest Preserve Trail Development Prepared structural and civil working drawings utilizing AutoCad and Microstation J. Other small roadway projects as assigned.

Civil/Structural Drafter

Raymond Professional Group

May, 1998 — October, 2001 (3 years 5 months)

DesPlaines River Bridge Rehabilitation Project, IDOT, Hodgkins, IL.

Prepared structural and civil working drawings utilizing Microstation.

I-55 B&O Railroad Bridge Rehabilitation Project; Prepared structural and civil working drawings for the bridge and roadway utilizing Microstation.

Northeastern Illinois University Fine Arts Complex/Auditorium Renovation, Chicago Illinois

Prepared structural working drawings using AutoCad 14.

Sprint/PCS Cellular Antenna Arrays; Prepared working drawings utilizing AutoCad 14.

Civil/Structural Drafter

Upchurch & Associates

February 1997 - May 1998 (1 year 4 months).

I-88 East-West Tollway, Illinois State Toll Highway Authority, Aurora, IL

prepared structural and civil working drawings of the roadway and bridge plans

utilizing Microstation.

Calumet Station, Chicago Metra Railways, East Hazel Crest, IL

Prepared structural working drawings for rehabilitation of the gatehouse and

head house buildings; steel canopy for existing platform.

Blue Island Station, Chicago Metra Railways, Blue Island, IL

Prepared civil and structural working drawings for new platform including steel canopy,

headhouse building, and crew facility building

EDUCATION

AAS - Industrial Drafting - May 1996

Richland Community College - Decatur, Illinois



Contact this candidate