Post Job Free

Resume

Sign in

Engineer Project

Location:
Arbour Lake, AB, T3G 5A4, Canada
Posted:
February 19, 2019

Contact this candidate

Resume:

Ravil Sharipov

403-***-**** h. 403-***-**** c. ac8jfp@r.postjobfree.com

Project Control ● Project Engineering ● Workface Planning HIGHLIGHTS OF QUALIFICATIONS

• Professional Engineer – Mechanical, APEGA member #116558

• Mechanical Engineering graduate with over than 25 years domestic and international

(Kazakhstan) experience in project and construction management, and engineering with an emphasis on Oil and Gas facilities, commissioning and start-up activities

• Detailed – oriented with strong analytical skills and ability to create various reports

• Computer skills: Primavera P6, AutoCAD, SPR,SPC, EVMS, MS-Project, Adobe

• Strong communication, attentive listening and problem solving skills

• Good acknowledgement with Standards and Codes (ASTM, ANSI, ASME, API, CSA, etc.)

• Persistent, patient, responsible, self-motivated and organized

• Ability to work well both, independently and as a member of a team in timely manner EMPLOYNENT HISTORY

Maintenance and CSU Planning Lead 2015-2017

Pembina Pipeline Corporation, Red Water, AB - RFS II (Gas Fraction Project) Construction, Commissioning and Start UP (CSU)

• Work closely with the project team to integrate maintenance and CSU activities into the overall planning, maintenance, construction and commissioning schedule, to keep all activities off the critical path, and to carry out site inspections with a focus on systems performance, operations and maintenance

• Establish and maintaining lines of communication with design, maintenance team and contractors, thorough documentation, enforcement of specification provisions, identifying specialized tests, and creating a timeline for re-commissioning activities and reports

• Distribute and coordinate flow of information of re-commissioning process (documenting and witnessing all equipment start-up,PSSR, ITP plan, Functional and Performance Test Procedures, Construction Checklists, Issues Logs)

• Provide “Boundary” input during the Maintenance Work Package (MWP) defining stage

• Provide constructability analysis on any suggested changes (i.e. Health Safety, Environment, Schedule, Cost, and Productivity)

• Determine numbers of craft manpower requirements

• Submit material requisition to material supply group

• Prepare Commissioning Report which is compiled which summarizes all of the tasks, findings and documentation of the re-commissioning process Senior Planning Engineer 2014 - 2015

Nexen Energy LTD., Calgary, AB – Technical Operation Services (Well-Pads, LNG,)

• Prepare and manage overall L1, L2, L3 Master Schedule, integrating Work Breakdown Structure and the Schedule Design Basis

• Coordinate schedules from multiple contractors and incorporate the information gathered into the overall project master schedule

• Ensure that construction project is executing within set deadlines, on budget, and in line with all the relevant safety standards and regulations.

• Track, monitor and forecast progress of all activities and deliverables such as engineering documents, Long Led Items fabrication status and construction of all discipline.

• Assist Project Manager to develop practical solutions to address issues that may potentially impact the current plan with regards to the end date

• Assist in the preparation of the long term running costs information

• Monitor, review, analyze and report on the schedule status during all project phases Senior Planning Engineer 2010-2014

Wood Group PSN – Calgary, AB

OSUM Oil Sand Corp. –Taiga Cold lake SAGD Project. CNRL - Primrose Well Pads Program;

Husky - ASP Treatment Projects.

• Provide support to Project Managers, Project Controls, and Program Managers to ensure pro- gram scheduling objectives are being met and adhered by conducting regular update meetings and reviews

• Assume the responsibility for the preparation, quality and accuracy of the schedule of the Engineering Work, Procurement, Construction of the SAGD Well-Pads and Steam Distribution Pipeline

• Prepare Schedule Design Basis

• Cost Time Resources (CTR) coding, allocation and leveling

• Prepare and Issue the look-ahead schedule for Project Manager that examine in detail tasks that need to be done, the tasks forecast for the near future, the resource requirements, and the identification and quantification of any issues that are foreseen

• Monitor, review, analyze and report on the schedule status during all project phases

• Assist Project Manager to develop practical solutions to address issues that may potentially impact the current plan with regards to the end date

• Assist in compiling and preparing Prime exercise and project evaluations for technical documentation

Senior Mechanical Facilitator / Work Face Planning 2008-2010 Flint Energy LTD. - Calgary, Fort McMurray, AB

Suncor Energy – Suncor FB-3 Project.

Shell - Albian Sands EXP-1 Project

• Provide “Constructability” and “Boundary” input during the Engineering Work Package (EWP) defining stage

• Provide constructability analysis on any suggested changes (i.e. Health Safety, Environment, Schedule, Cost, and Productivity)

• Determine numbers of craft manpower requirements

• Submit material requisition to material supply group

• Submitting the request for Information (RFI) as required

• Determine sequence and schedule dates for work activities within a discipline area

• Determine milestones to support project schedule

• Determine interdisciplinary restraints or interfaces which define activity sequences

• Works with the performing organizations to coordinate work sequences with total project plan

• Provides schedule knowledge on a continuous basis to assist in discipline planning and inter- facing with others

• Determine critical path activities for a discipline or specialty

• Develop unit installation and workhour rates for a specific discipline to aid in analysis. Pre- pares and develops study information as assigned

• Prepare schedule, manpower, quantity progress and performance reports for assigned disciplines

• Identify and reports activities which have a critical or potential impact on schedule.

• Track the status of fabrication shop module deficiency and off–mod deficiency flowing through the process; manage all module related deficiency documentation, (Mod. Deficiency List, As- Built Drawings, Cut Sheets, Required Completion List, Piping, Mechanical, Electrical (EHT) Ship Loose Attachments) follow up with stakeholders regarding delays, and escalate as needed.

• Create the Bill of Materials for deficiency related materials, create and co-approve Deficiency Installation Work Packages (DWP), ensure the completeness of drawings for in-scope deficiencies

• Provide Schedule review and attainability, (weekly progress reports) CWP Coordinator (Mechanical-Piping) 2006-2008

SNC-Lavalin Inc. JV with Snamproggeti - Calgary, AB CNRL -“HORIZON” (Secondary Upgrading) project

• Preparation and issue to the contractors the Module, Stick-Build, Off-Module CWP. Project engineering requisitions for bulk material.

• Verification and correction, if necessary, of material related information in ISO, BOM, P&ID, Line List,List of Equipment and Valve Data Sheet.

• Assemble and maintain CWP (Construction Work Package) with close relationship with Procurement Department.

• Assisting in coordinating and scheduling PDS downloads activities with Piping Design Group

• Check fabrication materials according with isometric drawings, feedback to design.

• Submitting request for information (RFI) as required.

• Review and comment Off- Module Assemble CWP

• Assisting and developing routine modification in executing techniques and procedures.

• Provide Schedule review and attainability, weekly progress report. Mechanical / Piping Designer 2005-2006

Three streams Engineering Ltd. - Calgary, AB

Encana, CNRL, – projects

• Responsible for design of site plans, structural skids, piling layouts, detailed legend sheets for construction drawings, Piping Flow sheets (PFD), Piping Instrumentation Diagram (P&ID), and preparation of the bill of material and specification for engineering packages (EWP). Mechanical Engineer 1985-1999

Almatygas LTD. Almaty, Kazakhstan

EDUCATION: M.Sc. Mechanical Engineering, Polytechnic University, Almaty



Contact this candidate