MIKE GOHARY

*** ********* ********, ******** ****, ON

Cell: 647-***-**** ac8j1f@r.postjobfree.com

Page 1 of 3

Highlights

More than 24 years of working experience in new commercial and residential projects, restorations and renovations from pre-construction to completion

Extended experience to prepare tender documents, analysis of bids, scope of work for all trade, administration of contracts, estimation for project duration and budget, project scheduling and negotiate with contractors and suppliers, change order process and assessing cost and schedule impact in an effective and professional manner to avoid delay in all construction process

Innovative and effective management techniques, Capable to motivate construction teams to exceed exceptional and maintain high standards

Proven result in saving time and budget by finding solutions with quickest and the most efficient method

Highly experienced to review different discipline drawings ahead of schedule for consistency and prevent any potential problems

Effectively work alongside clients, architects and engineers to facilitate design, with providing ideas for value engineering

Substantial experience in managing simultaneous activities to meet the project objectives to ensure conformity of procedures and quality

Strong and up to date knowledge of new approved material and construction methods

Ability to understand the business needs for each project and capable to make on-spot decision

Excellent knowledge of building envelop system, National Building Code of Canada (NBCC), Ontario Building Code (OBC) and Quality Control occupational health & safety (OHS)

Knowledge of AutoCAD, Excel, Word and MS Project

Detail oriented, trustworthy, team player, ability to work under pressure

Ethic driven attitude & altruistic personality

Work Experience

Construction Project Manager 2016-present

Enirox Group

New Major Projects

179 Teddington Park Ave.

Low rise residential construction over 6500 sq.ft, $10 M construction budget Steel structure frame, exposed concrete columns 24” diameter and 26’ high, curtain wall window, metal door jamb with solid wood door, open joint cladding system, radiant heat system, snow melting and fully equipped automation system

- Prepares and monitors overall project schedule and Maintained safe, secure and healthy work environment by following standards through timely manner site inspections

- Documentation of all construction process with preparing reports, minutes, photos, videos and marked up drawings

- Performs regular job site observations to provide direction to all contractors

- Attends proposal meeting with the clients, contractors where contracts, plans or specifications are inadequate or contravene good building practices such as Finding discrepancy: MIKE GOHARY Cell: 647-***-**** ac8j1f@r.postjobfree.com Page 2 of 3

In cut sheet issued by surveyor for foundation plan ( pins location were 6’off toward city property)

in curtain wall shop drawing and structural drawing

Investigated the project needs based on the clients expectation and recommended following improvement to project which accepted:

Upgrade of structure from Timber to steel

2 lb spray foam (close cell) instead of fiberglass building insulation

Replacing a concrete one-way slab with thinner 2way slab to achieve more room

Achieved appropriate height in wine cell and mudroom with relocating two steps in main entrance

Relocating HVAC ducts and air supply to achieve higher efficiency

Reduced the cost of materials (from $170,000 to $125,000) and achieved high quality finish in landscaping by preparing new landscape layout and shop drawings

Valency, Yorkville village

New store, over $ 700,000 construction budget

- Supervised all construction activity from start to finish, including installation of metal stud framing, T-bar ceiling, fire rated drywall, glass showcase with glass door and modern style fine carpentry.

- Effectively communicate with the mall management to make sure to comply with their standards, regulations, installation procedures, safety requirements, delivery of material and working hour schedule.

101Railside Rd.,Toronto Soccerplex Ltd.,

Renovation, over $3.0M construction budget

- Inspection of the existing complex and review of all associated items to optimize cost and timing of the renovation project.

- Inspection of construction at all critical phases for approval. General Contractor/Management 2007-2016

Golden Plan Construction Inc.

New Major Projects:

11 Misty Crescent

New low rise residential construction over 7000 sq.ft, $10M Construction budget

9 Old Yonge Blvd

New low rise residential construction over 6000 sq.ft, $4M Construction budget

- Conducted all pre-installation meeting with subcontractors and manufacturer's representatives

- Worked alongside the client, architects and engineers to facilitate design and construction process

- Performed regular job site observations to provide direction for all subcontractors

- Maintained safe, secure and healthy work environment by following standards

47 York Ave, 7000 sq.ft. new house,

70 highland Ave, 5000sq.ft. new house

22 Farrington Ave, 5000 sq.ft. new house

- Reviewed all blue prints and specifications, job site measurements, estimated all material and labor cost to provide quotation for client

- Provided all tools and equipment, scheduling for installation and delivery of material

- Managed all safety requirements and Inspected daily job process to maintain high quality MIKE GOHARY Cell: 647-***-**** ac8j1f@r.postjobfree.com Page 3 of 3

Renovation Major Projects

Richmond Hill, Residential over 4500 sq/ft

Leaside, Toronto, Full addition over 3000 sq

- Applied for building permit and conducted meeting with hazardous material investigator

- Applied for gas connection, water and sewer connections, hydro and all city inspections

- Consulted and worked alongside the client to purchase the lot, hired architect

- Developed a schedule to execute the project on time and on budget

- Managed subcontracts by evaluating, awarding and monitoring their performances OWSJ Detailer (part time) 2001-2003

Quincy joist company, Florida

- Reviewed architectural and structural drawing to mark up any discrepancy, unclear or uncertain items to be verified

- Prepared joist drawing per specification for approval

- Prepared shop drawing, bill of material and final erection drawing Construction Site Supervisor 2001-2007

Golden Pyramid Construction Inc.

Subway restaurant inside commercial building at college and university Ave.

Subway restaurant on Queen St., occupied residential unit above, restricted fire code and safety regulations

Beauty salon, New store in Richmond Hill

Full renovation of gas station in Mississauga

Framing, drywall, tile job, carpet in fire station in Mississauga

- Contact, schedule and manage all subcontracts

- Maintained safe, secure, and healthy work environment by following and enforcing standards and procedures; complying with legal regulations

- Successfully implemented project cost control procedures and monitoring

- Adjusted work schedules as needed in order to meet all project deadlines

- Read blueprints, communicated and instructed the information to workers Estimator /site supervisor/ Project Manager 1994-2001 REGISTRATION OF DEEDS AND PROPERTIES ORGANIZATION – Tehran, Iran

- Managed Estimating cost of materials, labors and equipment to determine project feasibility.

- Analyzed survey reports and blueprints to plan projects effectively.

- Worked intimately with the superintendent and other colleagues to coordinate and ensure meeting schedule, safety and quality of the objectives

- Led Group of 24 project staff including managers, architects, civil engineers, Mechanical & Electrical engineers and draft persons as a Deputy and senior project manager. EDUCATION

Bachelor of Science: Civil Engineering, 1994

University Of Azad – Tehran, Iran



Contact this candidate