RESUME OF M. SHARIQ ANWAR

Mobile No. 009**-*********

ac8gyy@r.postjobfree.com

Name

MOHAMMAD SHARIQUE ANWAR

Date of Birth

September 5, 1975

Nationality

Indian

Educational Qualifications

Name of School/College/

University/Institution

Year Attended

Qualification Certificate/Diploma/Degree

From

To

Town High School Munger, BSE Board, Patna

1989

Secondary School

Aligarh. Muslim, University, Aligrah, India

1989

1991

Senior Secondary School

Aligarh. Muslim, University, Aligrah, India

1991

1996

B.Sc. Engineering in Electrical.

Work Experience

Project/Site Management Experience

19 Years 6Months

Maintenance Engineer Experience/Design Engineer

2 years

Period of Work in Saudi Arabia

Oct-1999 to Present

Present Employer

ZJ Engineers & Construction.

Previous Employer

ABB Contracting Co. Ltd.; Served more than Eight years in Vital role.

Sl No.

Name of Company

Position

From

To

1.

ZJ Engineers & Construction

Projects- Manager

Jan- 2018

Present

Brief Job Description:

Over all responsibilities for closing of serval 132 kV./33 kV/13,8 kV Substations Playing lead role with client for close out of projects . Finalizing the procurement of all special tools/ spare parts etc.

Involve in the closing of Punch List clearance, special tools handing over, As Built Drawings, Spare Parts handing over etc…,Controlling Subcontractors/ Vendors, Finalizing change orders & final invoicing .

Sl No.

Name of Company

Position

From

To

2.

Tareg Al-Jaafari Contracting

Project Manager

Feb -2017

Dec-2017

Brief Job Description:

Played lead role with client for execution of HV Substation project on turnkey basic . Involved in placing all Major equipment’s PO . Involved in submission of Base Design /Detail Design of associated s/s Equipment and accordingly taking approval from SEC.Getting IFC issued ;Controlling Subcontractors to achieve targets, Involved in arranging Factory testing of various equipments, coordination with vendor till it is delivered to site.

Involved in preparation of executive report/monthly report, schedule .Involved in preparation of work progress report, Implementation of 3 week working schedule, preparation & approval of progress invoice, Variation in order & amendments, Involved in procurement of all special tools/ spare parts etc.

Arranging Factory/Site Training at manufacturing unit/site location for Client personnel.

Involve in the closing out the project. (Punch List clearance, special tools handing over, As Built Drawings, Spare Parts, etc.).

Sl No.

Name of Company

Position

From

To

3.

ABB Contracting Co. Ltd., Riyadh KSA

Associate Project Manager

Oct- 2008

Dec-2016

Brief Job Description:

As an associate project manager involved in Project Management control, pertaining to the execution of the lump sum turnkey contracts of EHV substations.

Extending my support to accomplish the project on schedule, fully complying to the quality requirements, by guiding the project team with various project activities, such as Design and Engineering, Material procurement / logistics, civil construction works, Equipment Erection, Testing and Commissioning.

Involved in submission of Base Design of s/s and accordingly taking approval from SEC.

Involved in arranging Factory testing of various equipments, coordination with vendor till it is delivered to site.

Coordinating with site for daily activities & accordingly arranging all the requirement e.g materials, Manpower resources, Tools & equipments at site.Coordinating with the client to arrange WAR/PTW, witnessing at site.

Involved in preparation of executive report/monthly report, schedule .Involved in preparation of work progress report, Implementation of 3 week working schedule, preparation & approval of progress invoice, Variation in order & amendments, Liaison with client & coordination with vendors. Involved in procurement of all special tools/ spare parts etc.

Arranging Factory/Site Training at manufacturing unit/site location for Client personnel.

Involve in the closing out the project. (Punch List clearance, special tools handing over, As Built Drawings, Spare Parts, etc.).

5

ZJ Engineers & Construction, Riyadh

Project Manager

April -2005

Sept-2008

Brief Job Description :

Includes organizing manpower & equipment resources, preparation of Overall Time Schedules, Detailed Activity, Quality management through vendor assessment based on SEC approved lists. Ensuring Safe engineering practices at the site & off the site, Evaluation of contractors and ensuring work is executed to quality standard. Documentation control, Preparation of Base Design Submittals for different Substation equipments/Auxiliaries & getting approval from SEC, Submittal & getting approval of Factory & site test procedure & formats. Arranging Factory Testing, Scrutiny of drawings and drawing approvals, Liason with SEC and preparation of progress reports, Follow up on orders and keeping a track on deliveries, packing lists, Organizing testing and prechecks, organizing SEC witness test at site, Organizing SEC-Witness tests at manufacturing facilities abroad and in kingdom.

6

Dunya Establishment Riyadh,Saudi Arabia

Site /Maintenance /Design Engin eer

Oct-1999

Dec-2004

Brief Job Description :

As Design Engineer :: Carried out LVAC/DC System short circuit calculation/LV Cable sizing /Auxiliary Transformer sizing calulations/ LV circuit breaker sizing & selection calculation etc….

As a maintenance Engineer:: Carrying out routine schedule maintenance work & responding to equipment fault, maintenance of Power transformers/MV Switchgears/LV Switchgears/MCC/motors /Battery bank & DC system etc…

Troubling shooting of electrical systems. Installation of fresh electrical equipment/fittings.

As a Site Engineer::

Job responsibilities include substation equipments installation’s overall monitoring like erection of Power Transformer, GIS, Switchyard equipment installation like Surge Arrestor, Line Trap, Disconnect Switch, CT, IVT, CCVT, Earth Switch, Circuit Breakers, Post Insulator with respective structures & Control & Protection cabling, Control & Protection, Switchgear & SCADA Panels installation with glanding, terminations, battery bank & chargers. Earthing of transformers & equipments earthing. Mesh installation all around the substation, Control, LV, MV, HV Cable laying etc.

Involved in preparation of work progress report, Preparation & Implementation of 3 week working schedule, preparation of monthly progress invoice, Variation in order & amendments, Liaison with client & coordination with head office, preparation of project completion reports.

7

TECC Engineering Ltd, Dadri, India

Installation Engineer

Nov-1996

Sept-1999

Brief Job Description:

Site Supervision, execution & installation of three 3 phase, 60MVA, 33/11KV Trafo and Switchyard equipments. Involved in Material Calculation to be used in erection like Cable tray & conduits its accessories, Control & Power cable length, Grounding & Lightning protection materials and its accessories etc….

Project Summary (KSA)

1)Construction of New 8127, 132/13.8 kV S/S ; 8602 132/33/13.8 kV S/S; Al –Rayyan 69/13.8KV Substation.

S/S 8127:: 132/13.8 kV –Includes 12 no of 132 kV C.B arranged in double bus single breaker Scheme configuration with 3 Nos of 3 phase,132/13.8 kV ‘,60MVA Power transformers,38 nos -13.8 KV MV switch gear cubicles with associated AC/DC Auxiliary system with complete Protection, SCADA & SOE and Communication System.

S/S 8602 :: 132/33/13.8 kV –Includes 14 no of 132 kV C.B arranged in double bus single breaker Scheme configuration with 3 Nos of 3 phase,132/33/13.8 kV ‘,80/106/133MVA Power transformers ; 18 nos of 33 kV,30 nos of 13.8 KV MV switch gear cubicles with associated AC/DC Auxiliary system with complete Protection, SCADA & SOE and Communication System.

S/S Al Rayyan 69/13.8 kV :: Includes 9 no of 69 kV C.B arranged in Single bus single breaker Scheme configuration with 3 Nos of 3 phase,69/13.8 kV ‘,30/40 MVA Power transformers ; 32 nos of 13.8 KV MV switch gear cubicles with associated AC/DC Auxiliary system with complete Protection, SCADA & SOE and Communication System.

Working for closing of Above projects .

2)Construction of AZIZIYAH-3, 115/13.8kV Substation.

Worked with Construction of AZIZIYAH-3, 115/13.8kV Substation, which includes 10 nos of 115KV Circuit breakers arranged in double bus single breaker Scheme configuration with 3 Nos of 50/67 MVA,115 /13.8 Kv ;60 HZ; Dyn1 Power Transformers ;53 nos -13.8 KV MV switch gear cubicles with associated AC/DC Auxiliary system with complete Protection, SAS and Communication System and related Protection Modification Works at Remote End S/S.

3) Construction Of AL-HASSA SOUTH WEST(#9037) 380/230/115 Kv BSP

Construction of new AL-HASSA SOUTH WEST 380/230/115/13.8kV BSP includes 21 Nos of 380 KV Circuit Breaker in one & half breaker scheme configuration,

15Nos Circuit Breaker of 230 KV in one & half breaker scheme configuration,26 Nos Of Circuit Breaker in single breaker double busbar scheme configuration with 3 Nos of 452.5/602.5/752.5 MVA, 380/230/13.8 kV Transformers, 3 Nos of 302/402/502 MVA, 380/115/13.8 kV transformers, 3 Nos of 50/67 MVA, 115/13.8 kV transformers with complete Control, Protection, Communication, SAS, Fire Suppression Systems, Civil / Structural Work & Mechanical Works and associated SS at remote end ongoing AL-HASSA South East 380kV BSP, existing Faras & Hawiyah 380kV Substations & Mahasen, South Hofuf, Qurayyah SWTP, Abqaiq Central 230kV Substations & ongoing Qurayyah IPP 380kV SS & Uthmaniyah PP 115kV SS with necessary Additions / Modifications to Protection, Control, Communication, SCADA / SOE / DSM Systems:

Mainly worked for the closing e.g Spare parts, Special tools,punch list etc for above project.

4) Expansion of the 380kV GIS Switching station in Qurayyah-2 P/P

Worked for 3 additional bays @QPP2

Provide detailed engineering & design, procurement supply & deliver all equipment & matretials to work site, construct, install, test commission & put in service three (3) additional no of bays complete with double bus single breaker configuration at

Qurayyah -2 PP 380 kV GIS Switching Station including addition/modification to control protection, Signaling & Communication system on LSTK basis

5)

Switching Station Qurayyah PP 2

Worked for Qurayyah Project .

Construction of 380kV Qurayyah-2 PP indoor Switching Station of 25 Circuit Breakers, with complete Protection, Metering, Control, SCADA and Communication System and related Protection Modification Works at Remote End S/S. (Shedgum & Faras S/S) & and interconnection of 380kV GIS with 15 Power Plant Generator Transformers, through Gas Insulated Bus Ducts (Project Portion I)

Construction of 380kV GIL (Gas Insulated Line) Station for crossing of new 380kV lines with the existing 380kV Transmission lines, as well as replacement of existing protection system at existing Power Plant, Qurayyah-1 S/S. (Project Portion II)

Construction of new 380kV GIS S/S at Half Moon of 15 Circuit Breakers with complete protection, metering, control, SCADA and Communication System, and related protection modification works at remote end S/S Dhahiyah, Ghunan, Ghazlan S/S.(Project Portion III)

6) New Jawatha 230/115 KV BSP

Closing of above project e.g Spare parts, Special tools,punch list etc .

7)

S/S: 8027 (AL-KAMA Riyadh): Worked for Reinforcement of Two 3 phase 100MVA 132/33kV Power Transformer & associated equipment.

8)

S/S: 7109 (Wadi Al Fara): Two 3phase 125 MVA 380/110kV, Two 3 Phase 60MVA 110/33 kV, Power Trafo & associated 380kV, 110kV Switchyard equipment

9)

S/S: 7845 (Bukeyriah): Three 3 phase 20MVA, 33/13.8kV Power trafo & associated equipment.

10)

ARAMCO (Harad): Waqar/Tinat Two 3 Phase 3.75MVA, 69/13.8kV Power Trafo & associated Swichyard equipments .

11)

S/S: 9011 (How tat Sudair): Two 3phase 350MVA, 380/132kV Power trafo & associated equipment.

12)

S/S: 8811 (Al-Khurma): Reinforcement of Two 3phase 100 MVA, 132/133kV Power Trafo & associated equipment.

13).

S/S: 8033 (Saneyiah Riyadh): Reinforcement of One 3 phase 40MVA 132/13.8kV Power Trafo & associated equipment.

14).

S/S : 8810 (Sajjar) : Reinforcement of Two 3 Phase 100 MVA, 132/33kV Power Trafo & associated equipment.

MOHAMMAD SHARIQUE ANWAR