Post Job Free

Resume

Sign in

Engineer

Location:
Al Lith, Makkah Region, Saudi Arabia
Salary:
15000 SAR
Posted:
February 04, 2019

Contact this candidate

Resume:

Employee Name

:

ARCON DAEL BALINQUIT

Mobile No.

+966-*********

E-mail Address

:

ac8dw8@r.postjobfree.com

Current Position

:

GIS – E&I, Telecom PID

Nationality

:

Filipino

Date of Birth / Age

:

March 05, 1972 / 46 years Old

Marital Status

:

Married

Languages

:

English, Tagalog, Bisayan

Educational Qualification

Degree / Diploma

Institute / Country

Period (From – To)

MBA / Project Management

Nicholson University

2013 - 2014

Bachelor’s College Degree / Electronics &Communication Engineering

Liceo de Cagayan University

1994 - 1999

Associates Degree / Marine Transportation major in Nautical Studies

Capitol University

1990 - 1993

Technical Certification:

Certificate

Institute / Country

Period (From – To)

PR328: QMS ISO 9001:2015 Lead Auditor

CQI Unique Delegate Number: 130721

EDULLENCE / Kingdom of Saudi Arabia

August 6 - 8, 2018

JAPID - Electrical Inspector Approval no. 1

SAP No. 80001301

Jizan Project Inspection Division, Kingdom of Saudi Arabia

October 10, 2016

QC Electrical Inspector Approval no. 1

Northern Area Project Inspection Division, Kingdom of Saudi Arabia

June 20, 2011

Seminars / Trainings:

ISO 9001:2015 Lead Auditor - August 6 - 8, 2018

Quality Management System Training Course

CQI Course ID: 130721

Fire / Tropical Basic Offshore Safety Induction - June 2016 – August 2018

and Emergency Training (TBOSIET)

ZR-HSE Training Specialist

ZADCO Training Center, Zirku Island

ZADCO Safety Orientation - June 06, 2015

Offshore Personnel Travel Information

Management (OPTIMA) No. 575637

Confined Space Seminar - August 2015

ZADCO Training Center

Zirku Island

Permit To Work (PTW) Seminar - August 2015 - August 2018

ZADCO Training Center

Zirku Island

ZADCO Safety Orientation - June 06, 2015

Offshore Personnel Travel Information

Management (OPTIMA) No. 575637

Basic H2S (OPITO Approved) - June 18, 2015 to June 17, 2017

Course Code: 9041

GTSC Training Center – Abu Dhabi

Basic First AID - June 17, 2015 to June 16, 2018

GTSC Training Center – Abu Dhabi

Basic Fire Fighting - June 17, 2015 to June 16, 2018

GTSC Training Center – Abu Dhabi

Work Values Enhancement Camp - October 05-06, 2005

USC Retreat House

Talamban Cebu City, Philippines

Leadership Training - July 05, 2005

Crown Regency Suites

Lapu-Lapu City Cebu, Philippines

ISO TS16949 2001 version Seminar - May 9 – 13, 2005

TUV Rheinland Philippines, Ltd

MEPZ II, Basak Lapu-Lapu City Cebu. Philippines

Industrial Calibration Seminar - March 23~24, 2002

Gryke Scientific Instrument Trading

Mango Park Hotel, Cebu City

JAPAN Training (Quality Analysis) - April 15, 2002

Mitsumi Co. LTD.,

Yamagata City, Japan

Brief Profile:

Seventeen (19) years of experience on the Site of major capital oil & gas facility construction projects ($9.8 Billion USD), including a fifteen (15) years of experience in a Lead a multidiscipline construction team.

Extensive exposure in QA/QC Inspection, Telecom, Electrical & Instrumentation Engineering in local and abroad for the field of Telecom, Electrical and Instrumentation i.e. construction, inspection, detailed design, Quality Assurance / Quality Control / Hazardous Area Equipment Installation, hook-up, engineering and commissioning mainly in Oil & Gas Plant, Power Plant and Petrochemical industry. Adept to work as Inspector, Engineer and Superintendent in a multi-billion projects local and International companies which specializes in Project Management Consultancy, Third Party Inspection and EPCM (Engineering Procurement, Construction, Maintenance and Management).

I have substantial experiences in technical orientation and resolving design deviations during construction and commissioning stage in Onshore and Offshore on Brownfield/Greenfield area. With a lot of hands on experience of all kinds of construction and commissioning procedures dealing with telecom, instrumentation and electrical which involve in Factory Acceptance Test (FAT), Site Inspection Test (SIT), Site Acceptance Test (SAT), pre-check, Final loop check and Functional check, Pre- Commissioning, Commissioning and Start-up of all system with very good knowledge in BMS- Building Management System, IPCS-Integrated Protection and Control System, DCS-Distributed Control System, Personnel Access Control, SCS - Structural Cabling System, ETS System, PABX System, IP and Analog Telephone System, Public address and Paging Party Line System, CCTV System, TETRA Radio system, UHF/VHF Radio system, Satellite Master Antenna Television-SMATV and Entertainment System, GSM and Faxes Terminals, ESD, PLC, SCADA and FEED Inspection, testing of Switchgear, Transformer and Motors LV/MV/HV voltage prior to commissioning.

Proficient in computer operations, good communication skills, and working ability. Throughout my work experiences my superiors have recognized my personal commitments, adaptive, improvising talents, good leadership and interacting successfully to work commitment. Ensure that all matters are observed in technical assessments are made; HSE Health Safety Environment (HAZOP) Hazard Operability reviewed and adhered.

Work Experience (Years)

In KSA:

8 Years

Outside:

11 Years

Total:

19 Years

Summary of Work Experience History (From Present to Previous):

1).

Name of Company / Country

:

NATIONAL INSPECTIION & TECHNICAL TESTING CO., LTD

FAHSS TUV NORD / Kingdom of Saudi Arabia

Project

:

Jizan Economic City Infrastructure Utilities Project – JEC CIU

Position Held

:

QA/QC E&I and Telecommunication Inspector - JAPID

Period (From – To)

:

September 21, 2016 – Present

Key Job Responsibilities

:

Knowledgeable for the Monthly Project Quality Index (PQI) Evaluation for JEC Roads Project, Medium Industry Development Project, Heavy Industry Development Project, RO and STP Project.

Knowledgeable for the Weekly Project Quality Dashboard (PQD) Evaluation for JEC Roads Project, Medium Industry Development Project, Heavy Industry Development Project, RO and STP Project

Responsible for organizing, implement, conduct, coordinate and manage the QA/QC programmed as per the Project Contractual requirements Schedule Q.

Coordinate the document control of technical submittals, drawings etc. with the project team and to ensure the QA/QC validation has been done, to ensure their issue, amendments and recall of controlled documents.

Coordinate all inspections, monitor the required tests and record inspections and tests made as per the contract plan and the contract specifications.

Provide technical support to the Project Manager and guidance to site staff in submission of materials for approval, request for inspection, shop drawings, As built drawings, O & M manuals.

Liaise with the client’s representative for the conduct day- to –day quality related project activities.

Draft / Review and approves the quality related procedures prepared on the project to ensure compliance the project quality program and plan.

Participate in QA/QC Meetings with Client / Consultant at regular intervals to improve the site-based quality related matters satisfied to the consultant Engineer.

Carry out site inspections for Electrical, Instrumentation and Telecommunication construction trades at regular intervals to ensure works comply to the approved construction drawings, BOQ, specifications and as per the Method Statements (MS), Inspection Test Plan (ITP) and the Check Lists (CL).

Ensure the proper storage of materials at site prior to use. Ensure that special chemicals are stored under shade. Ensure that MSDS (Material Specification Data Sheet) are available with the supplier products if not inform the site store keeper and the supplier to arrange it.

Supervise and participates in the project auditing and monitoring program to verify the effectiveness of the project quality program /plan.

Recommends actions to the project construction team to correct observed quality deficiencies with the progress of works in all trades.

Represent the QA/QC Team for the project during quality assurance audits conducted by the client management or regulatory agencies for the status and assessment of the project during the construction stages.

Identify quality problems, initiates documented actions as Standard Violation and Pro-active Logbook Entry (LBE) in Saudi Aramco Quality Management Information System (QMIS) and verifies implementation of solutions. Initiates HOLD / WITNESS points where ever required to control the product comply with the specification.

Ensure that Non- Conformance Report (NCR) is raised once the activities deviated from the contract specifications or normal construction industry practices. Ensure all clients NCR’s addressed by the construction dept or trade sub-contractor in a timely manner and close the issue.

2).

Name of Company / Country

:

Worley Parsons Engineering Pty. Ltd / Abu Dhabi, UAE

Project

:

ZADCO 7th Crude Oil Tank - Offshore Project

Position Held

:

Project Management Consultant –E&I

Period (From – To)

:

June 2015 – April 2016

Key Job Responsibilities

:

Oversees the day to day activities and progress of Construction activities related to electrical and instrumentation discipline. Monitors that the EPC Contractor has assigned adequate resources to the Construction activities associated with their assigned discipline specialty to meet the Project Objectives. Immediately raises associated concerns/issues with Project Construction Manager.

Works intimately with Operations Area Authorities, the Contractor and SIMOPS Coordinators and any other entities in planning and execution of the required Permit to Works and SIMOPS activities associated with the Construction execution.

Works closely with the Site Quality Coordinator to ensure proper quality inspectors are assigned to monitor the EPC Contractor’s Construction activities.

Site subject matter expert on Construction and installation of facilities within the scope of work in electrical and instrumentation discipline.

Assists the EPC Contractor in the planning and execution of day to day activities

Works with the other Site Team Discipline Leads and Coordinators to ensure adequate HSE, construction, quality inspection, controls coverage in the field site.

Works closely with the Field Engineers and Project Engineers in resolving technical issues that arise during Contractor’s field construction activities.

Works closely with the Contractor in the development and endorsement of Construction procedures and method statements

Reviews and approves Contractor’s and Company inspector’s daily progress reports, method statement, IFC drawings approval and other related construction documents.

Holds an intimate knowledge of Construction activities that Contractor will be performing on a rate reimbursable basis. Responsible to track equipment, labor, tools and materials required to perform these activities and provide same to the Site Project Controls Engineer for comparison to the EPC Contractor’s invoice.

Assists Site Management with issue resolution and ways to improve activity execution

Provides mentorship to UAE Nationals in Construction methodologies and Best Practices

Participate in and support the Projects’ Safety Program requirements through safety walks, attending safety reviews, safety input into procedures, designs and pre-commissioning and commissioning/Start-up activities.

Ensure that all systems are complete and that all activities necessary to get the system pre-commissioned have been performed and documented

Ensure the Contractors prepare documentation for field tests that require review and approval by the Customer.

Demonstrate safety leadership through the promotion and stewardship of the Project’s safety tools. And assist in the development of and then maintain the Turnover Dossier.

Ensure that all testing, pre-commissioning, and Turnover activities are progressing in line with the Project Schedule and the Customer team signs-off the relevant check sheets.

Supervise Vendor Representatives attendance in line with the schedule and verify that the work is performed by them before they depart from site.

Attend Project progress meetings and deliver a status of site engineering activities.

Produce reports on Construction, QA/QC, Pre-commissioning and Turnover progress.

3).

Name of Company / Country

:

BUREAU VERITAS (BV) / Abu Dhabi, UEA

Project

:

TAKREER Expansion Project – EPC 6 and 7 - Jetty Offshore Project

:

ADPC - Offshore Container Port Terminal

Position Held

:

PMC – Senior Telecom Engineer

:

QA/QC Telecom Principal Inspector

:

QA/QC Electrical Engineer - Surveyor

Period (From – To)

:

December 2011 – June 2015

Key Job Responsibilities

Monitor the daily construction details of progress in the discipline. And progress measurement – report actual quantities installed on a weekly basis.

Document Review for the following;

Method Statement for Telecom systems (Fire and Gas System, CCTV System, Public Address System, Normal Telephone System, ETS System, PABX System, Personnel Access Control, SCS and BMS systems.

Site surveillance of all related works executed, raised the concerned related to any deviation from the project procedures and requirements during construction stage and alert the concerned personnel and to ensure proper implementation of approved method statements and procedures.

Witness and supervised all work of quality, service providers (Vendors) and EPC inspectors.

Assist the Project Manager to prepare the project reports and perform specialist QA/QC techniques on critical structures and processes.

Review the electrical/Instrumentation/telecom works check list, method statements, IFC (Issued for Construction Drawing), as-built drawing and related quality control documents for final drossier.

Conduct a site surveillance and co-ordinate to construction to implement the work completed in complies with code in accordance with specification. Coordinate the scheduled RFI (Request for inspection) for witness/hold point etc. with the Client and communicated with the project team by sending the report of all deviations from approved plans and specifications and Interacting with the project team in Quality requirements

Review all the materials received on the site, inspecting them, ensuring that they are as per approved datasheet, MAR and specification.

Attend and participate in QA/QC meetings, conduct all telecom, electrical and instrument equipment and device testing within the required specification and to monitor frequency of testing.

Proactively supervise the closure of NCRs, suggesting innovative ideas for improvement and liaise with the construction execution team management resolving problems quickly and efficiently.

Look the Over-all quality supervision for MEP works at site during surveillance and inspection time, follow at all time the safety rules & regulation at different hazards area of the project.

Comply, implement and participate in the improvement of established ISO QMS & EHSMS procedures/ documentations and maintain records keeping.

Ensuring that construction, installation, and operational testing conform to functional specifications and customer requirements and support promoting all QHSE policies and procedures implemented by the company.

Prepared the PQP, ITP, and other QA/QC documents that may be requested by Project Manager and reviewed all material submittal and its compliance statement before forwarding to client/consultant’s approval.

Reviewing all telecom/electrical/instrument shop drawings before the submission to consultant/client.

Review all O & M Manuals in coordination with site management team.

Coordinate with the contractor for internal quality audit and maintaining a log for all the telecom/electrical/instrument RFI status.

Closing the NCR's in coordination with Management Representative/Quality Manager.

Completing the testing and commissioning tasks of project(s) as per project progress and maintaining all QA and QC documents legible.

Conducting the factory visit FAT (Factory Acceptance Test) for testing of different equipment such as, Fire and Gas cabinet and devices, CCTV, SCS, PACS, PA and BMS etc. before dispatching to site

FEED/DESIGN STAGE:

Support the development of Project Strategy prior of the execution of work for

ELV/Telecommunication

Coordinate with the PMT for the Validation and Estimates of Contractor and Sub-Contractor project Budget.

Support the development of the Implementation Plan and Master Schedule for the overall work execution of ELV/Telecom scope

Support the Project Administration, Document Management, and correspondence, transmittals & drawings control.

Attend the coordination and design review meetings with Contractor discipline Engineers and MEP Manager with their Design Consultants.

Support the HSE Management requirements of Projects

Review all the submitted Purchase Requisitions for Procurement material & equipment issued and submitted by EPC Contractors

Coordinate the Preparation of Invitation to Bid (ITB) for EPC Construction and response to technical queries received during tendering stage carry out the Coordination Technical Evaluation of bids and submit the recommendation to Contracts Department

Execution Stage of the Project:

Electrical System

Inspect and review all the Electrical material used for construction, in compliance to Quality Reference Standards by TAKREER DGS for EPC 006 Contract document.

Witness the Factory Acceptance Test for Capacitor Bank, ABB HV Switch Gear, Medium Voltage Switch Gear, MCC and DUCAB HV Cable (6.35/11KV, 3x300 MM2 -C/XL/CT/LC/SWA/PVA), 3 Phase Schneider Oil Type Transformer 33-11.5 KV.

Inspection of Cable Tray, Fittings, Support and Accessories as per TAKREER DGS- EU- 001 rev. 01, DGS- AU- 065, NEMA VE 2.

Inspection of Above Grade Conduit and boxes (Exposed and Embedded Installation) as per TAKREER DGS- AU- 065, NEC Handbook.

Inspection of Direct Buried Very High Voltage, High Voltage, Medium Voltage and Low Voltage Underground Cable and above ground installation as per TAKREER DGS- EU- 001

Inspection of Grounding Cable underground and above ground installation as per TAKREER DGS- EU- 001.

Inspect and review the Grounding installation of building structural column for Building Cathodic protection.

Installation surveillance & monitoring for Capacitor Bank, HV Switch Gear, Medium Voltage Switch Gear, MCC and 3 Phase Schneider Oil Type Transformer 33-11.5 KV.

Document Review, Inspection Test Plan for HV Switchgear FAT, 2000 kVA 11/0.433kV Dry Type Transformers,1600 kVA 11/0.433kV Dry Type Transformers,1200kVA 11/0.433kV Dry Type Transformers,1000kVA 11/0.433kV Dry Type Transformers and Inspection Test Plan for RING MAIN UNIT (RMU) FAT.

Initiate for the issuance of Site Observation Memo (SOM) and Non- Conformance Report (NCR) for Non- conformity works by the contractors in reference to Relevant Standard of TAKREER.

Coordinate and discuss the issue of SOM and NCR to the PMC for the Rejection or Acceptance of Contractor’s reply to the Item of comment stated on the SOM and NCR.

Fire and Gas System

Witness the installation Inspection for Fire and Gas cabinet and MIMIC panel as per TAKREER DGS and other relevant International standard.

Witness the installation Inspection for Smoke detectors, Beam detector, H2S gas detector, Strobe Light, and Beacon and other devices.

Loop checking prior to final commissioning stage and SIT-functional testing.

Do the Pre-commissioning/Commissioning of the entire system including the hardwire interface to PACS, PA, HVAC, Elevator Lift, BMS, DCS, Fire Fighting systems (ENERGEN Gas, Foam system and Sprinklers system) and UPS system.

CCTV System

Witness the installation Inspection for CCTV cabinet and field junction boxes as per TAKREER DGS and other relevant International standard.

Witness the installation Inspection for CCTV Camera and other devices and testing of coaxial cable from the field camera going the CCTV cabinet.

Loop checking prior to final commissioning stage and SIT-functional testing.

Do the Pre-commissioning/Commissioning of the entire system including the hardwire interface to Fire and Gas System, BMS, DCS system.

Personnel Access Control System

Witness the installation Inspection for Personal Access Cabinet and field junction boxes as per TAKREER DGS and other relevant International standard.

Witness the installation Inspection for Door Contact device, Break Glass, Card Reader and other devices.

Loop checking prior to final commissioning stage and SIT- functional testing.

Do the Pre-commissioning/Commissioning of the entire system including the hardwire interface to Fire and Gas System, DCS system.

Structured Cabling system (LAN and Telephone)

Witness the installation Inspection for Structural Cabling System Cabinet as per TAKREER DGS and other relevant International standard and the installation Inspection for Floor Access Junction Boxes for Telephone, Internet and LAN connection and other devices.

Fluke testing prior to final commissioning stage and SIT-functional testing.

Do the Pre-commissioning/Commissioning of the entire system including the hardwire interface to DCS system.

Public Address System

Witness the installation Inspection for Personal Access Cabinet and field junction boxes as per TAKREER DGS and other relevant International standard.

Witness the installation Inspection for Door Contact device, Break Glass, Card Reader and other devices.

Loop checking prior to final commissioning stage and SIT-functional testing.

Do the Pre-commissioning/Commissioning of the entire system including the hardwire interface to Fire and Gas System, DCS system.

Building Management System (BMS)

Witness the installation Inspection for BMS Console and field junction boxes as per TAKREER DGS and other relevant International standard and the installation Inspection for all Instrument devices; Pressure Transmitter, Level Transmitter, Temperature Transmitter and other major instrument.

Loop checking prior to final commissioning stage and SIT-functional testing.

Do the Pre-commissioning/Commissioning of the entire system including the hardwire interface to HVAC system.

Fiber Optic Network

Witness the Trench inspection prior to laying of fiber Optic Cable as per Quality Reference Standards of TAKREER DGS and Approved EPC Contract document, NEC Handbook and Building specification.

Witness the Optical fiber splicing and OTDR and Power Meter Testing from patch panel A to patch panel B prior to commissioning and functional testing.

Completion/ Close-Out Stage of the project:

Review and approve contractor’s submission for Pre-Commissioning/Commissioning Procedures. Initiate and agree Snug List/punch-list items with Contractor during the site walk through.

Evaluate Contractor’s claims and make recommendation to accept/ reject/ negotiate and coordinate final settlement with Contracts Department.

Support with Issuance Provisional Acceptance Certificate to the Contactor. Coordinate issuance of contract close-out report and transfer all project drawings/ catalogues/ manuals etc. to Records. Keep track of warranties/defects liability period on the works performed.

Coordinate all corrective actions by contractors during warranty/ defects liability period. Support and make recommendation for Final Acceptance Certificate.

4).

Name of Company / Country

:

Hyundai Engineering & Construction Co., Ltd. (Hdec) / Manifa, Saudi Arabia

Project

:

Manifa Causeway Power Transmission and Substation Offshore Project

Position Held

:

QC Electrical Supervisor

Period (From – To)

:

June 2011 – December 2011

Key Job Responsibilities

:

Witness and do the inspection of all work of quality, service providers (Vendors) and EPC inspectors.

Assist the QA Manager to prepare the project reports and perform specialist QA/QC techniques on critical structures and processes.

Review the electrical/Instrumentation/telecom works check list, method statements, IFC (Issued for Construction Drawing), as-built drawing and related quality control documents for final drossier.

Look over the EHV Grid-Station / HV Substations for Site supervision and Construction Management.

Monitor particularly in the Power Transmission and Distribution and experience in installation, supervision and commissioning.

Close coordination with EPC Contractor and Vendor by doing Site investigation, Data collection and Report preparation.

Review approved contractor’s submittals; drawings, calculation, layouts, and detailed engineering documents on AIS, GIS, Switchgears, transformers, CT, PT, cables, batteries etc. and assure design implementation at site.

Supervise and controlling of works according to the specifications and EPC contract.

Look over the progress monitoring of Contractor in line with agreed time schedule.

Review of Contractor’s invoice in line with progress of site works.

In-depth knowledge on QA/QC procedure and system.

Responsible for site inspection and testing; (FAT, SATs)

Responsible for site safety and safety audit;

In-depth exposure on safety procedures OSHA certification in complex international EPC projects.

Familiar with IEC, ANSI and IEEE standards

115/13.8KV HV POWER TRANSFORMER

Core Insulation Resistance, Insulation Resistance Measurements and P.I Test, Ratio Check (All Taps), Polarity and Phase Relation Check, Winding Resistance Measurement, Winding and Bushing Insulation Power Factor Test, Measurement of excitation current, Functional tests of on-load tap changer.

G.I.S (SF6) 115KV SWITCHGEAR

Witness Vacuum/Gas Filling and Bolt Torque checking, Gas Leakage Testing and Dew point Measurement, Wiring Pre-check for Relay panel, RTCC, 115kV GIS LCC.

(WESCOSA) Motor Control Center (MCC). (WESCOSA) Medium Voltage and Low Voltage Switchgears, Installation (115KV,13.8KV,480V) Cable Bus Duct, Uninterrupted Power Supply Installation (UPS) and Battery Installation, (13.8KV,480V) Electrical Motors *Mounting of panel compartment and Interconnection of bus bars and internal wirings and Grounding system, etc.

5).

Name of Company / Country

:

Hyundai Heavy Industries Company Ltd. (HHI) / Al Dur, Kingdom of Bahrain

Project

:

ALDUR IWPP – Independent RO Water & Power Plant Project

Position Held

:

QC Electrical & Instrumentation Engineer / Inspector

Period (From – To)

:

May 2010 – June 2011

Key Job Responsibilities

:

Witness and do the inspection of all work of quality, service providers (Vendors) and EPC inspectors.

Assist the Project Manager to prepare the project reports and perform specialist QA/QC techniques on critical structures and processes.

Review the electrical/Instrumentation/telecom works check list, method statements, IFC (Issued for Construction Drawing), as-built drawing and related quality control documents for final drossier.

Monitor and check the seawater winding temperature, pumps bearing temperature, loop water header pressure, cooling water header pressure, and monitoring of potable water, process water, HFO, LFO, caustic soda and acid tanks to ensure reliable and safe operation during shift.

QA/QC documentation and review all the construction electrical and Instrumentation procedures.

Monitor all the construction activities and witness andverify Continuity, Merger, HI-POT and Component testing for Medium Voltage & Low Voltage equipment.

Issued punch listing for out-standing works during QC Inspection.

Electrical Works;

115/13.8KV HV POWER TRANSFORMER

Core Insulation Resistance, Insulation Resistance Measurements and P.I Test, Ratio Check (All Taps), Polarity and Phase Relation Check, Winding Resistance Measurement, Winding and Bushing Insulation Power Factor Test, Measurement of excitation current, Functional tests of on-load tap changer.

G.I.S (SF6) 115KV SWITCHGEAR

Witness Vacuum/Gas Filling and Bolt Torque checking, Gas Leakage Testing and Dew Point Measurement, Wiring Pre-check for Relay panel, RTCC, 115kV GIS LCC.

(WESCOSA) Motor Control Center (MCC). (WESCOSA) Medium Voltage and Low Voltage Switchgears, Installation (115KV,13.8KV,480V) Cable Bus Duct, Uninterrupted Power Supply Installation (UPS) and Battery Installation, (13.8KV,480V) Electrical Motors *Mounting of panel compartment and Interconnection of bus bars and internal wirings and Grounding system, etc.

Instrumentation Works;

Witness the installation of major Instrument; P, DP & TEMPARATURE TRANSMITTER, INDICATORS to the process and Fire & Gas Detection System Works *Paging and Party Line (P/PL) Works. *Data and Voice Communication Works.

Witness the inspection for conduits Installation for instrument air lines and Wiring, Detectors Instruments & Panels installations, Power and Signal cable, * Power cable and Instrument cable Meggering and Termination. *Installation of Marshalling Cabinets and other panels in PIB Building. *Telephone Stations and Panel Installation, Termination for power and signal cable. * Cable Tray Installation.

6).

Name of Company / Country

:

Consolidated Contractors Company W.L.L / Khursaniyah, Kingdom of Saudi Arabia

Project

:

KGPP - Khursaniyah Gas Plant Project

Position Held

:

Site Engineer – E&I, Telecom

Period (From – To)

:

September 2006 – May 2010

Key Job Responsibilities

:

Responsible for the support of Company Safety, environment and Quality policies and programs, and carrying out specific duties and responsibilities related to his job as spelled out in Management system documentation, policies, procedures, local documentation, Management System Manual, Safety Manual and other related documents.

Liaises with other departments for obtaining Acceptance of Work Certificates on completion of work, preparation for pre loop check, pre commissioning and commissioning and smooth start up

Reviewing all projects plans and assessing/planning work, coordinating the smooth startup of