Summary

24 year’s total work of experience in Electrical/Instrument fields. 6 years in Electrical/Instrumentation construction site supervision and 18 years as QA/QC Electrical/Instrumentation Inspector. Approved and qualified by Saudi Aramco Project Inspection Department as QA/QC Electrical Inspector with SAP/ARAMCO id – 70006025. Assign in a various project like Manufacturer of Solar Product, Oil and Gas, LNG Plants, Refineries, Power Plants, Petrochemicals, and High-Rise Building in a various country like in Bahrain, Saudi Arabia, State of Qatar, and Philippines

.

I. Company LA RECRUITMENT

P.O. Box 45193

Doha, Qatar

March 2014-January 2019

Designation Sr. E&I Inspector (Client Representative)

Client Qatar Solar Technologies (QSTec)

Project QSTec Polysilicon Project - (Ras Laffan Industrial City)

Duties/Responsibilities:

Review and approved contractors Material Approval Request, Inspection Test Plan, and Checklist.

Review Mechanical Completion Package and approved the Mechanical Completion Release Note as well as Final Handover Dossier Package per system/sub-system submitted by the contractor.

Review approved Project Method of Statement, Quality Procedures, Specifications, Test Report, and IFC Drawing.

Review and approved Technical Document Comment/Review issued by contractor.

Attend walkthrough and issue punch list to the contractor prior to pre-commissioning.

Material receiving inspection, witness of installation and testing for MV Switchgears (33KV/10KV), LV Switchgears, Transformers, Bus duct, Panel Distributions, Local Control Switch, JB, Power and Control Cables.

Material receiving inspection, witness of installation and testing for Pressure and Differential Transmitter/Indicator, Flow Transmitter/Indicator, Temperature Transmitter/Indicator, Level Transmitter, RTD, ON/Off Valve, Control Valve, JB, Marshalling Cabinet, instrumentation cables.

Material receiving inspection, witness of installation and testing for Transformer Rectifier, Anode JB, Positive/Negative JB, Test Station, Magnesium Anode, Polarization Coupon, Reference Electrode, MMO Canister Anode, KYNAR/HMWPE Anode Cables.

Perform and witness bench calibration of instruments such as Pressure/Flow/Temperature-Transmitter, Level-Transmitter/Switch, Pressure/Temperature-Gauge.

Perform and witness field functional test of control valve, on/off valve, pressure relief valve

Perform and witness cable laying and cable termination for E&I, Fire & Gas, Telecommunication and Cathodic protection system.

To ensure implement and maintain E&I materials and equipment’s preservation condition and operability of the system before taken to use.

Raised Non-Conformance report and Construction Quality Surveillance Report in accordance with project requirements and specifications.

Perform and witness continuity and insulation resistance test and Hi-pot test of MV/LV Switchgears, Transformers, Distribution Boards, Power and Control Cables.

Perform and witness installation of grounding system and conduct earth resistance test.

Perform and witness instrument impulse tube installation and leak test.

Perform cold loop check and hot loop check of field instrument through junction boxes and through DCS/PLC.

Witness Insulation and winding resistance test of MV & LV motor.

Perform pre-commissioning of MV/LV motor solo run test.

Witness Site Acceptance Test with the Vendor representative (HONEYWEEL) for F&G system.

Witness Site Acceptance Test with the Vendor representative (ELSTER-INSTROMET) for Metering system.

Witness Site Acceptance Test with the Vendor representative (ATLAST COPCO) of PLC Panel for Air and Nitrogen.

Perform cold loop & hot loop check of Fire and Gas system with the vendor.

Perform commissioning of Interface signals from Central Control Room between Fire Alarm system & HVAC (HVAC Shutdown and fresh air damper close) with the vendor

Perform commissioning of Interface signals from Central Control Room between Fire Alarm system & Transformer/Foam Deluge Valve System with the vendor.

Perform commissioning of Interface signals from Central Control Room between Fire Alarm system & clean agent system (FM200) with vendor.

Perform commissioning of Interface signals from Central Control Room between Fire Alarm system & High Sensitive Smoke Detection(HSSD) & Linear Heat Sensing Cable (LHSC) system.

Perform commissioning cathodic protection system for pipe and tank with the vendor.

Attend and witness seat leak test, shell test, stroke test, calibration, for ON-OFF valve/control valve, Pressure Control Valve, Pilot Valve at the contractor workshop.

II. Company MOODY INTERNATIONAL INTERTEK

1. Office No. 213, 2nd Floor Oyala Center

P.O. Box 2526, Al-Khobar 31952

Kingdom of Saudi Arabia

May 2013-March 2014

Designation Sr. E&I Inspector-Onshore/Offshore Khafji Crude Related Project (Client Rep)

Duties/Responsibilities:

Implement the project’s Site Inspection Surveillance Plan.

Receiving inspection of electrical equipment and instrumentation arriving at site.

Review selected Contractor inspection documents for completion and correctness

Warehouse storage area utilization within the manufacturer’s warranty considerations.

Equipment, cable, wiring and tubing and instrumentation installation and testing.

Instrumentation measurements bench calibration.

Impulse line hook-up and leak test.

Monitor Contractor to ensure resolution on the log book entry in a timely manner.

Witness selected testing and Hold Point as indicated in the Contractor’s ITP.

Designation E&I Vendor Inspector (Third Party)

Duties/Responsibilities:

Review Specifications, Method of Statements, Quality Procedures, FAT Acceptance Test Procedures, ITP’s, Checklist, Data Sheets, Material List, and Approved Drawings,

Preparation of Inspection Report (IR) and Inspection Release Certificates (IRC) and carrying out inspection with suppliers to ensure that only approved materials are procured and installed.

Perform Factory Acceptance Test (FAT) as per the requirement of the project and FAT documentations are filed in accordance with the project system.

Test and measures finished products, components, or assemblies for functioning, operation, accuracy, or assembly to verify adherence to functional specifications.

Mark items for acceptance or rejection, records test result and inspection data, and compares findings with specifications to ensure conformance to standards.

Confers with vendors and others regarding inspection results, recommends corrective procedures and compiles reports of results, recommendations and needed repairs.

2. 12 AL-VICTORY BUSINESS CENTER

ROAD 2808 AL-SEEF DISTRICT

KINGDOM OF BAHRAIN

June 2012-April 2013

Designation Sr. E&I Inspector (Client Representative)

Client TATWEER PETROLEUM

Project Bahrain Oil and Gas Field Redevelopment Project/IMI Group

Kingdom of Bahrain

Duties/Responsibilities:

Review work pack, scope of works and related documents for EPC New Well Manifolds Facilities, EPC for New Tank Battery Facilities, Water Flood Field Development-Water Injection Skid, Instrument Work for Gas Lift Lateral, Instrument Work for Maudud Gas Injection Line, and Modernization Phase 2 on existing Tank Batteries.

Review, approved and implement method of statement, Inspection Test Procedure, Checklist and Material Approval Request.

To verify electrical and instrumentation material receiving inspection in accordance with specifications, installation and commissioning.

Perform and inspect Factory Acceptance Test of electrical and instrumentation equipments in accordance to project specifications and quality procedures prior to final release.

Verify, inspect and witness installation and commissioning of electrical and instrumentation equipments and their associated wirings.

Verify, inspect and witness installation of cable trays, direct buried cables, conduits, and recommended actions for any findings.

Verify, inspect and witness continuity and cable insulation test, ground resistance test, to ensure that the systems are achieving their intended performance.

Verify, inspect and witness cable laying, dressing, termination and commissioning of electrical and instrumentation wires.

Verify, inspect and witness installation and test of field instrumentation including but not limited to flow, temperature, level and pressure measurement, impulse lines, and cable.

To witness bench calibration of all instrumentation measurements.

To witness impulse line hook-up and leak test.

Perform routine surveillance, none conformance report, inspections on construction projects to verify compliance with company requirements.

Ensure contractor adherence to its approved QC procedures, Inspection Test Plan, IEC, Approved drawing and Project Specifications.

To perform and witness illumination level test on perimeter lighting

Conduct and witness coupled and uncoupled LV motor solo run test.

Prepare punch item list prior with acceptance of Mechanical, Electrical and Instrumentation completion.

III. Company AECOM JEDDAH

PO Box 15362, Jeddah, 21491 Kingdom of Saudi Arabia

March 2012 – June 2012

Designation Sr. Electrical Inspector (Client Representative)

Client Saudi Aramco

Project Jeddah Storm water and Drainage

Jeddah, Saudi Arabia

Duties/Responsibilities:

Coordinate to contractor QA/QC Engineer or Inspector in relation to QA/QC matters.

Review project quality plan, inspection and test plan, relevant forms required and coordinate in the preparation of method statement.

Conduct surveillance and prepare observation report in order to monitor the performance of the project.

Responsible for the preparation of nonconformance report and correspondence letter related to QA/QC matters.

Ensure the controls of instrument measuring devices are in compliance with the specified requirements.

Ensure the timely weekly submission of reports.

Attend weekly coordination meeting.

Ensure the contractor prior to excavation of works shall verify the locations of the existing underground utilities for communication and power cables.

Inspect and witness splicing of new and existing underground communication and power cable (110KV).

Witness continuity and insulation test, ground resistance test and hi-pot test of 110KV power cable.

Inspect and witness cable laying, termination and commissioning of communication and power cable.

IV. Company SPIE OIL & GAS SERVICES MIDDLE EAST LLC

P.O. Box 14670 Doha, Qatar

Aug. 2007 – March 2011

Designation Sr. Electrical Inspector (Client Representative)

Client Qatar Gas

Project Qatar Gas 3&4 LNG Onshore Project

PO Box 22666 Ras Laffan Industrial City

Doha, Qatar

Duties/Responsibilities:

Initiate ideas and or activities to improve the quality of the works.

To ensure that the contractor is following safety procedures.

Perform routine surveillance, none conformance report (NCR), inspections on construction projects to verify compliance with company requirements.

Perform continuity and insulation test, ground resistance test and hi-pot test to ensure that the systems are achieving their intended performance.

Review as built information and drawings for modification.

To perform installation and commissioning of cathodic protection system for U/G piping, tank for drainage/measuring cables, CuSo4/Zinc reference electrode, polarization coupon, mmo ribbon anode, high silicon cast iron (TA4 ANODE), transformer rectifier, CP test station and junction box.

Witness testing and commissioning of HV/MV/LV Power Transformer, Switchgears, and MCC’s, UPS, Battery Charger, Electrical Motors, and all other related equipments.

Verify, inspect/witness cabling, termination and commissioning of heat tracing on mechanical pipe lines.

Ensure contractor adherence to its approved QC procedures, Inspection Test Plan, IEC, Approved drawing and Project Specifications.

Conduct inspection on HV/MV/LV cable laying/dressing, glanding and termination, tray laying, conduiting.

To perform and witness illumination level test, polarity test, exit signs and emergency lights.

Conduct and witness coupled and uncoupled MV/LV motor solo run test.

Participate in punch-list preparation prior to final acceptance for turnover.

Participate in verification of completion of punch-list items prior to turnover.

Perform and conduct Pre-Mechanical Completion (PMC) activities.

Perform and conduct Expansion Start-up (ESU) activities.

To assist Siemens Vendor to test and commissioning works on 33/7.2KV Variable Frequency Drive (VFD).

V. Company Tender Contracting Co.

PB No. 76629 Al-Khobar 31952 kingdom of Saudi Arabia

Aug. 2004 – Aug. 2007

Designation QC Electrical Engineer (E&I and Telecommunication Inspector)

1.

Client Saudi Aramco

Contractor Snamprogetti Saudi Arabia Ltd.

Position QA/QC Electrical Inspector

Project Gas Threat and Compression Facilities at Hawiyah NGL Recovery Plant

Saudi Arabia

Sept. 2006 – Aug. 2007

2.

Client Saudi Aramco

Contractor Technip Italy Saudi Arabia Ltd.

Position QA/QC E&I and Telecommunication Inspector

Project Diesel Hydrotreater, Riyadh Shell Refinery

Aug. 2004 – Jun 2006

Duties/Responsibilities:

Electrical/Instrumentation Inspector

Verify, inspect and witness electrical equipment installed on hazardous and process areas and recommended actions.

Perform and inspect Factory Acceptance Test of electrical and instrumentation equipments in accordance from the supplier’s recommendations prior to final release.

Verify, inspect and witness electrical and instrumentation equipments prior to release at site in accordance with specifications and installation standard without any discrepancies.

Verify, inspect and witness installation and commissioning of MV and LV transformer, switchgear, control gear, bus-bars, panels, battery charger, UPS, electrical motors and their associated wiring.

Verify, inspect and witness field instrumentation including but not limited to flow, temperature, level and pressure measurement, impulse lines installation, and cable, safety systems including analyser systems, instrumentation preservation and maintenance, test and calibration procedures and commissioning plans.

Verify, inspect and witness CP measurements and witness installation of anodes, cables, rectifiers, and field junction boxes.

Verify, inspect and witness installation of cable trays, underground cables, conduits, wire ways and recommended actions for any findings.

Verify, inspect and witness continuity and cable insulation test, ground resistance test, hi-pot test to ensure that the systems are achieving their intended performance.

Verify, inspect and witness cable laying, termination and commissioning of heat tracing on mechanical pipe lines.

Review drawing design packaged submittals and ensure all records files and database are updated with all inspection worksheets, findings and status of repair

Conduct routine surveillance in the installed systems and issue inspection worksheets to report any findings and follow up on the execution of the findings. Coordinate with area inspectors on all outstanding activities and prepare monthly report.

Prepare quality plans, quality procedures and inspection test plans.

Verify, inspect and witness functional test of fire detection and alarm system, illumination level test, polarity test, exit signs and emergency lights.

Monitor and prepare exception item list prior with acceptance of mechanical completion.

Telecommunication Inspector

Perform inspection of mounting and pre-com of telecommunication cabinet/closet, information outlets (voice/data), conduits, pull boxes and others.

Perform and inspect Factory Acceptance Test of telecommunication equipments in accordance from the supplier’s recommendations prior to final release.

Verify, inspect and witness telecommunication equipments prior to release at site in accordance with specifications and installation standard without any discrepancies.

Witness of mandrel test inspection on OSP PVC conduit before and after backfilling.

Conduct inspection of duct bank installation and manhole hardware.

Perform inspection of OSP FOC cable and copper for installation, termination and identification.

Perform inspection of installation and pre-com of Page Party and Public Address system inside/outside of the building.

Perform inspection of installation and pre-com of CCTV system.

VI. Company Al-Osais Contracting Co.

Dammam Saudi Arabia

Feb 2002 – March 2004

Designation Site Electrical Engineer

QA/QC Electrical and Telecommunication Inspector

1.

Client Saudi Aramco

Position Site Electrical Engineer

QA/QC Electrical Inspector

Project North Park II and III Office Building

Office – Warehouse Complex Midra (Saudi Aramco Project)

March 2003 – March 2004

2.

Client Saudi Aramco

Contractor General Dynamics

Position Site Electrical Engineer

QA/QC Electrical and Telecommunication Inspector

Project Saudi Aramco Haradh Gas Plant Project

Feb. 2002 – Feb. 2003

Duties/Responsibilities:

Electrical Inspector

Conduct routine surveillance, none conformance report, inspections on construction projects to verify compliance with company requirements.

Verify and witness Factory Acceptance Test of electrical equipments in accordance from the supplier’s recommendations prior to final release.

Verify, inspect and witness electrical equipments prior to release at site in accordance with specifications and installation standard without any discrepancies.

Ensure electrical works adherence to its approved QC procedures, Inspection Test Plan, NEC, Saudi Aramco Standard, Approved drawing and Project Specifications.

Verify, inspect and witness installation and commissioning of MV and LV transformer, switchgear, control gear, bus-bars, panels, battery charger, UPS, and their associated wiring.

Prepare quality plans, quality control procedures, and inspection test plans.

Verify and review as built information and drawings for modification.

Verify, inspect and witness continuity and cable insulation test, ground resistance test, hi-pot test to ensure that the systems are achieving their intended performance.

Verify, inspect and witness installation of cable trays, underground cables, conduits, wire ways and recommended actions for any findings.

Verify, inspect and witness installation and commissioning of cathodic protection system for U/G piping, magnesium anode, CP test station and junction box.

Verify, inspect and witness cable laying, termination and commissioning of heat tracing on mechanical pipe lines.

Verify, inspect and witness functional test of fire detection and alarm system, illumination level test, polarity test, exit signs and emergency lights.

Monitor and prepare exception item list prior with acceptance of mechanical completion.

Telecommunication Inspector

Perform inspection of mounting and pre-com of telecommunication cabinet/closet, information outlets (voice/data), conduits, pull boxes and others.

Perform and inspect Factory Acceptance Test of telecommunication equipments in accordance from the supplier’s recommendations prior to final release.

Verify, inspect and witness telecommunication equipments prior to release at site in accordance with specifications and installation standard without any discrepancies.

Witness of mandrel test inspection on OSP PVC conduit before and after backfilling.

Conduct inspection of duct bank installation and manhole hardware.

Perform inspection of OSP FOC cable and copper for installation, termination and identification.

Perform inspection of installation and pre-com of Page Party and Public-Address system inside/outside of the building.

Perform inspection of installation and pre-com of CCTV system.

Site Electrical Engineer

To carry out the technical integrity role for Electrical discipline.

To ensure all design work is safe and carried out in safe manner.

Ensure all design work conforms to the codes and standard used by the client, to agreed industry standards.

To supervise and co-ordinate all Electrical supervisors working in electrical discipline group.

To develop and maintain a quality design threshold for the Electrical discipline through use of understandable quality procedures.

To ensure all Electrical works carried out within established budgets and schedules.

VII. Company Engineering Equipment Incorporation (EEI)

CLIENT DESIGNATION PROJECTS / PLACE

1. Philips Co. QA/QC Electrical Inspector Philips Semicon Phase II / Philippines

Sept. 2000 – Nov. 2001

2. SAEI QA/QC Electrical Inspector Pacific Plaza Twin Tower Bldg. / Philippines

June 1999 – Aug. 2000

3. Chiyoda Keiso QA/QC E&I Inspector Petrochemical / Qatar

May 1998 – May 1999

4. Mitsubishi (MHI) Jr. QA/QC E&I Inspector Petrochemical / Philippines

March 1997 – April 1998

5. Caltex Petroleum Jr. QA/QC Electrical Inspector Caltex Gasoline Service Station / Philippines

Corporation Nov. 1996 – Feb. 1997

6. Black and Veach Inc. Electrical Foreman 2 x 385 MW Pulverized Coal Power Plant

(Start-up / Pre-commissioning) Nov. 1994 – Nov. 1995

7. Philippine Shell Electrical / Instrumentation Philippine Shell Petroleum Corporation –

Petroleum Foreman Refinery

Corporation Nov. 1993 – Nov. 1994

8. Enron Co. Electrical / Instrumentation 105 MW Diesel Power Plants / Philippines

Foreman April 1993 – Oct. 1993

9. Purefoods Electrical / Instrumentation Purefoods Ice Cream Plant / Philippines

Corporation Foreman (Refrigeration System)

Sept. 1992 – March 1993

10. Philippine Shell Electrical Foreman Philippine Petroleum Corporation (Refinery)

Petroleum Jan. 1992 – Aug. 1992

Corporation

Duties/Responsibilities:

Electrical/Instrumentation Inspector

Perform routine surveillance, none conformance report, inspections on construction projects to verify compliance with company requirements.

Verify electrical and instrumentation material receiving inspection in accordance with specifications, installation and commissioning.

Verify, inspect and witness continuity and cable insulation test, ground resistance test, hi-pot test to ensure that the systems are achieving their intended performance.

Verify, inspect and witness field instrumentation including but not limited to flow, temperature, level and pressure measurement, impulse lines installation, and cable, instrumentation preservation and maintenance, test and calibration procedures and commissioning plans.

Verify and review as built information and drawings for modification.

Verify, inspect and witness installation and commissioning of MV and LV transformer, switchgear, motor control center, bus-bars, panels, battery charger, UPS, and their associated wiring.

Prepare quality plans, quality control procedures, and inspection test plans.

Ensure contractor adherence to its approved QC procedures, PEC, Approved drawing and Project Specifications.

Verify, inspect and witness installation of cable trays, conduits and wire ways

Verify, inspect and witness functional test of fire detection and alarm system, illumination level test, polarity test, exit signs and emergency lights.

Participate in punch-list preparation prior to final acceptance for turnover

Participate in verification of completion of punch-list items prior to turnover

E&I Foreman

Performed functional and sequence test of AC/DC magnetic starter, power/VAC vacuum air circuit breaker and simulate to DCS at control room.

Conduct motor run test for coupled and uncoupled for correct motor run rotation, speed, phase voltage, starting and running current, ambient and bearing temperature, motor vibration and cost down time.

Performed repair and trouble shooting of installed electrical equipments.

Performed MV/LV cable laying, dressing, glanding, and terminations.

Responsible of laid electrical and instrumentation cable trays and conduits.

Directly supervise for equipment installation for MV/LV Switchgears, MV/LV Power Transformers, MCC’s, Distribution Panels, UPS, Battery Chargers, DCS, Panel and Cubicles, Fire Detectors, Flame Monitoring, and Vibration Cabinets.

Supervise field instrumentation installation for pressures, temperatures, flowmeters, transmitters, tank/pressure gauges, and instrument pulse tubings.

Conduct continuity test for power and control cable, insulation and ground resistance test, and hi-pot test.

Performed pre-commissioning and final test of all installed electrical equipments, fire alarm and detection system, illumination level test, polarity test, functional test for exit signs and emergency lights.

VIII. Company Cagayan Electric Power and Light Co. (CEPALCO)

Philippines

Jan. 1989 – Jun. 1991

Designation Electrical Foreman

Project Military Camp Clark Air Field (USA Based)

Duties/Responsibilities:

Direct supervision for the installation of Power Transformer, Lighting & Power Panel, Fire Alarm and Detection System, MATV Equipments and conduiting.

Responsible of MV/LV cable laying, dressing and termination.

Conduct MV/LV cable for continuity, insulation, ground resistance test and hi-pot test.

Performed pre-commissioning and final test of all electrical equipments, Fire Alarm and Detection system, Illumination level test, functional test for exit signs and emergency lights.

EDUCATIONAL ATTAINMENT: Bachelor of Science in Electrical Engineering (1982 – 1987)

Holy Angel University, Angeles City, Pampanga,

Philippines.

SEMINAR ATTENDED

COURSE PLACE YEAR TAKEN

1. Basic Offshore Safety Induction Kingdom of Saudi Arabia 22 Sept 2013 to 24 Sept 2013

Emergency Training (BOSEIT)

2. Industrial Process Controls Philippines 25 April 2011 to 09 May 2011

(36-hours course)

3. Advanced Industrial Motor Control Philippines 04 April 2011 to 03 May 2011

(60-hours course)

4. Calibration for Process Instrumentation Philippines 04 April 2011 to 19 April

(36-hours course) 2011

5. Competent Electrical Person Qatar Gas Nov. 2010

6. Safety Leadership for Coaches Qatar Gas April 2009

7. Introduction to Fire Safety II Qatar Gas Oct. 2007

8. Medic First Aid Training Program Qatar Gas Oct. 2007

9. Defensive Driving Course Qatar Gas Sept. 2007

10. Working in Height Qatar Gas Sept. 2007

11. Incident and Injury Free (IFF) Qatar Gas Aug. 2007

12. Confined Space and Excavation Qatar Gas Aug. 2007

PERSONAL DATA:

a. Date of Birth August 14, 1965

b. Nationality Filipino

c. Skills Computer Literate (Microsoft Office)

This is to certify that all information herein is true and correct to the best of my knowledge.

LEROY C. SALVADOR

Applicant Signature



Contact this candidate