•Progressive 4 years and 10 months of professional experience in the field of Instrumentation from Power Plant BOP Packages (Power Plant,Water Treatment/Desalination &Condensate Polishing Plant)
•In depth knowledge on documentation, designing, Erection & commissioning of Instrumentation & control systems in water & power based projects
•Posses excellent knowledge on field instruments, valves, cabling & system installation
Professional Development
Working as Engineer – Control & Instrumentation in Environmental Engineering Division at BGR Energy Systems Ltd, Chennai from June’ 2017 To till date.
Designation
:
Field Engineer - Control & Instrumentation
Roles and responsibilities
: Erection & Commissioning
Period
:
12-06-2016 to TILL DATE
Design & Detailed Engineering
•Designing and Performing detailed engineering for Water treatment packages (CPU,PTP,ETP & STP) based on the feed document provided by the Client including detailed study of process flow diagrams and Identifying the requirements and scope of work.
•Preparing Instrumentation deliverables for the project and is in compliance with Customer’s design criteria.
•Involving in Preparation of Process & Instrumentation Diagram and Equipment Layouts.
•Preparation of Operation & Control Philosophy of the entire plant ensuring safety interlocks and Drive Control Permissive.
•Preparation of Valve operation sequence chart for Logic Development.
•Preparation of Instrument Datasheet as per the tender specification and Inline to Process requirement & Creation of Purchase Requisition, document attachment in SAP.
•Preparation of Instrument Schedule, PLC Input/output List, Drive List, Alarm and Annunciation List.
•Preparing of Cable Datasheet, Location of JB & Cable Tray/Trench Layout and Interconnection Cable Schedule.
•Preparation of Instrument Hook-up diagram and Calculation of BOM as per plant requirement.
•Preparation of Datasheets for Junction Box and ACDB .Evaluation of Vendor Drawings & datasheet for Instruments (Transmitters, Analyzers, Indicators & Switches) ), PLC (Schneider Electric, Honeywell & Rockwell), UPS,etc., and technically approving the documents.
.
EXECUTED PROJECTS:
•Erection and Commissioning of Yermarus Thermal Power Plant (2 x 800 MW) - Client: BHEL,. Owner: RPCL.(Power plant and BOP Package)
•Erection and Commissioning of 42 MLD Water Treatment Plant – Client: PHEO.
•Erection and Commissioning of NTPL (2 x 500 MW) - Client: BHEL,. Owner: NLC.
.
ON GOING PROJECTS:
•Condensate Polishing Unit –New Neyveli Thermal Power Plant (2X500 MW) - Client: BHEL, Owner: NLC
•Condensate Polishing Unit (CPU) – Yermarus Thermal Power Plant (2 x 800 MW) - Client: BHEL,. Owner: RPCL.
•Condensate Polishing Unit (CPU) – NTPC (2 x 660 MW) - Client: BHEL,. Owner: NTPC.
Other Contributions:
•Coordinating and following up with Consultant/Client/Customer for documents approval.
•Providing Clarifications, Guidance and Technical support to Site Engineers & Providing startup assistance as required.
•Active participation in Commissioning of CPU Packages.
Previous Employment
Company : Chemin C&I Pvt. Ltd - Pondicherry
Role : Instrument Engineer
Duration : Dec 2014 to May 2017 (02 years and 05 Months)
Projects worked
1. Erection and Commissioning of complete C&I system including Steam Generator (SG) and Turbo Generator (TG) of 2*800MW YERMARUS THERMAL POWER STATION Raichur, Karnataka.
2. Erection, Testing and Commissioning of complete C&I system pertaining to Boiler & Aux, TG and Aux and Station C&I and C&I of balance system for 2*500MW NLC TAMILNADU POWER LIMITED, Thoothukudi.
Previous Employment
Company : Pyramid Precision Engineering India Pvt . Ltd - Chennai
Role : Electronic Engineer (Trainee)
Duration : May 2013 to May 2014 (01 years)
Projects worked
1. Erection and Commissioning of Various Test Bench for the Customer like TATA MOTORS, WABCO, SFL
Job Description:
.
•Preparing Instrumentation deliverables for the project and is in compliance with Customer’s design criteria.
•Involving in Preparation of Process & Instrumentation Diagram and Equipment Layouts.
•Preparation of Operation & Control Philosophy of the entire plant ensuring safety interlocks and Drive Control Permissive.
•Preparation of Valve operation sequence chart for Logic Development.
•Preparation of Instrument Datasheet as per the tender specification and Inline to Process requirement & Creation of Purchase Requisition, document attachment in SAP.
•Preparation of Instrument Schedule, PLC Input/output List, Drive List, Alarm and Annunciation List.
•Preparing of Cable Datasheet, Location of JB & Cable Tray/Trench Layout and Interconnection Cable Schedule.
Educational qualification
B.E- Instrumentation And Control Engineering from Dr. Mahalingam College Of Engineering and Technology under Anna University (2010-2013) with 75.7%First Class.
DIPLOMA- Instrumentation And Control Engineering from Kongu Polytechnic college (2008-2010) with 85 %First Class.
HSE – Bharathi Vidyalaya Higher Secondary School (2006-2008) with 54%.
SSLC – Bharathi Vidyalaya Higher Secondary School (2004) with 72.4%.
Software Skills
Platforms
Microsoft Windows Operating System
Software
Auto CAD, Microsoft Office, SAP
Languages
Basics of C & C++
Strength
Problem Solving
Quick learner
Team Player
Personal Information
Father’s Name P.MANI
Date of Birth 11TH NOV 1990
Sex Male
Marital status Unmarried
Languages Known English, Tamil (Read, Write and Speak),Hindi(Speak)
Place: Chennai
Date: (M.Mohanraj)