Resume:

*.

Last Position in China Petroleum

:

Executive Project Manager / Contract Lead

2.

Full Name

:

Muhammad Samiullah Quraishi

3.

Date of Birth

:

** ***** ****

4.

Nationality

:

Pakistani / USA Green Card holder

5.

Address, telephone, e-mail, etc.

:

1219 Glastonbury way, Bel Air, MD 21014, USA.

Email: ac8bx3@r.postjobfree.com

6.

Education (degree)

:

B.E. Mechanical Engineering from N.E.D Engineering University, 1973

7.

Other education

:

One year training as Chief Maintenance Engineer (1974-1975) for Novo-Lipetsk Iron & Steel Mills, former USSR.

8.

Languages and competences

:

English - Excellent

Urdu - Native

Russian - little

9.

Total Experience

:

>40 Years

10.

Experience in other countries

:

>10 Years

11.

Areas of Expertise

:

Project Management & Contracts.

12.

List of work carried out and professional experience (periods, Companies and positions)

Period

Company

Positions

From July 12, 2008 to April 12, 2017

CPECC

(China Petroleum Engineering & Construction Corporation)

Clients: ExxonMobil

SOC

IPIC

-Executive Project Manager & Contract Lead,

-Deputy Project Director,

-Contract Administration Manager

June 2006 to June 2008

SEFEC Engineering (Pvt.) Limited – Pakistan

General Manager

August 2004 to 2006

Frezone Plant Fabrication International Limited, Federal Lighter Terminal, Onne Oil & Gas Free Zone, Onne, Rivers State, Nigeria,

Plant Manager / COO

13.

Summary

More than forty (40) years Contracting, Procurement/Subcontracting & Project Management experience; including the Prequalification of Contractors, Tendering, Bid Evaluation, Contract Negotiation, Contract Administration and Execution of Works pertaining to Oil & Gas Sector, Refineries, Fertilizer, Cement Plants and Steel Mills.

September 2014 to April 2017

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP. [CPECC Iraq] – [EPC Contractor] – Client ExxonMobil

IRAQ WEST QURNA I: WET CRUDE TREATMENT SYSTEM AND PHASE II CRUDE TANKAGE, PUMPS & METERS PROJECT - Contract Price > 150US$ Million.

Position: Executive Project Manager & Contract Lead.

July 2013 to-September 2014

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP. [CPECC Iraq] – [EPC Contractor]

SOC Pipeline Project – Basra Iraq - US$73 Million.

Engineering, procurement, construction, startup of Gas Pipe Line 18"x 0.438 (Zubair/1–Fao) –

Worked as Deputy Project Director.

July 2008 to July 2013

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP. [CPECC] – [EPC Contractor]

ADCOP Project:

Construction of the Abu Dhabi Crude Oil Pipeline Project, an EPC project for IPIC with an approximate contract value of US$ 3.3 billion, 405km 48” Pipeline from Habshan to Fujairah, 2 Pumping Stations, Crude Oil Terminal and Offshore Ship Loading facilities in Fujairah

Assignments Successfully Completed:

Managed tender documents preparation, evaluation of technical & commercial proposals, negotiated bids and subcontracted the following major EPC works:

EPC Crude Oil Storage Tanks; Subcontract price more than US$150 million which included Design, Manufacture and delivery of all materials required for the Fabrication, Erection, Testing and Commissioning of the Eight (8) Crude Oil Storage Tanks at Fujairah Main Oil Terminal and Two (2) Crude Oil Storage Tanks at Habshan MPS; Tank materials included Eight (8) Nos.110M dia. Internal floating roof Crude oil storage tanks with working capacity of one (1) MMBBL (net) located at Fujairah MOT, Two (2) Nos. 110M dia. Internal floating roof Crude oil storage tanks (Buffer tanks) with working capacity of one (1) MMBBL (net) located at Habshan MPS.

EPC Offshore Pipeline & Facility; Subcontract price more than US$160 million which included the installation of a new Offshore Loading Facilities, offshore subsea pipeline and SPM having 3-Sub Sea Pipelines connecting the SPMs to MOT Ship Loading Pumps including the provision for umbilical pigging, 3-Single Point Mooring Buoy complete with all accessories for loading the VLCCs.

EPC Electrical Systems; Subcontract price more than US$20 million which included Design, Engineering, Supply, Manufacturing, Fabrication, Assembly, Inspection, Testing, FAT, IFAT, Shipment, Documentation, Training, Supervision & Installation on site, SAT, pre-commissioning and commissioning of the entire ELECTRICAL SYSTEM for two large Pump Stations and a new Main Oil Terminal.

EPC Scada & Telecom; Subcontract price more than US$15 million which included ICSS & TELECOM Designing, Engineering, Manufacturing Testing, Supply, Assembly, Software Development, Inspection, Testing, FAT, IFAT, Shipment, Documentation, Training, Supervision & Installation, Commissioning, SAT, PAT of SCADA, SCS, ESD, F&G and Entire Telecommunication Systems

Pipeline Constructions (100KM Mountain Area); Subcontract price more than US$100 million which included construction/installation of 48” Main Oil Pipeline between KP272 and the fence line of the Main Oil Tank Farm at Fujairah.

June 2006 to June 2008

SEFEC Engineering (Pvt.) Limited - Pakistan

General Manager – Reported to Managing Director.

Responsible for the Company Operations and Management of EPC / LSTK Qadirpur Gas Compression Project – Cost being US$150 Million. Joint Venture Partner of China Petroleum Engineering & Construction

August 2004 to 2006

Frezone Plant Fabrication International Limited.

Federal Lighter Terminal, Onne Oil & Gas Free Zone, Onne, Rivers State, Nigeria,

Plant Manager /COO.

General management of operations on day to day basis as Chief Operating Officer

General business development

Other functions assigned by the Chief Executive Officer

Deputizing for Managing Director / CEO in his absence

Attendance at Meetings of Board of Directors

Responsible for development of business & operating plans; development of marketing programmes

Coordination of technological development of indigenous staff, with special emphasis on technology acquisition by Senior Technical Staff

October 2001 to May 2004:

ABS Engineering Corporation (Pvt.) Limited - Pakistan

General Manager – Contracts & Business Development

Managed Clough Engineering Limited – contract for Sawan Gas Field Development Project amounting to US$ 1.7 Million.

August 1994 to September 2001:

SEFEC Engineering (Pvt.) Ltd.

Dy. General Manager

Responsible for getting business via International / local bidding

Preparation of Proposals, Contract Negotiations, Management & Contract Administration.

Foreign Procurement, Marketing and Projects Execution namely: PAK-American Fertilizer Plant Erection, Bestway Cement Erection.

Fabrication of Cement Plant Equipment such as Cement Mill, Kiln, Air Separators, Electrostatic Precipitators, Atox Mill Housing for FL Smith and assistance in the field of Erection works of Liberty Power Plant & Habibullah Coastal Energy – Quetta Power Plant, Saba Power Plant, Parco Mid Country Refinery Project, 1450 MW Ghazi Barotha Hydel Power Plant, etc.

1986 to 1994

Speedways Group/Saasam /PML/Tabani Group, Karachi - Pakistan

Project Manager / Senior Manager

Responsible for overall project monitoring (including fabrication and erection works)

Hold meetings with world reputable manufacturers, foreign delegates and carryout negotiations for foreign procurement.

Participation in Foreign Procurement Tenders from the initial stage till the performance tests / operation and release of Performance Guarantees

Preparation of computerized work execution schedules and monitoring of the Project (including financial control, shop drawings preparation, fabrication and erection works)

Setting up of Technical Dept.

Computerization of technical and commercial offers for the supply of Soviet spares, plant & equipment.

Control Engineers, Marketing Executives.

1980 to 1986

Saudi Cable Company-Jeddah (KSA) /PEL/BBP/ACE – UAE.

Process Engineer / Project Engineer /Factory Engineer

Erection, installation, testing, commissioning, operation and maintenance of Asarco Shaft Furnace Krupp / Hazlett continuous casting and rolling mill for the manufacture of copper rod.

Controlled the crew comprising various nationalities

Worked under the guidance of Italian, German, Belgian, French, Soviet and American experts

Responsible for the total erection, testing and commissioning of the Cold rolling mill complex including Pickling line, Shearing & Slitting, Reversing Mill, Bell type furnaces, Temper Mill and Continuous Hot Galvanizing Unit.

1974 to 1980

PAKISTAN STEEL, KARACHI, PAKISTAN

Assistant Executive Engineer

Construction, preparation of cost estimates, preparation of Contract Documents, tendering, Award of contracts, fabrication, erection, installation, testing and commissioning of the Karachi Steel Mills project under the guidance of Director (Projects) including Civil, E&I of Construction Base, Steel Yard, Raw Materials Preparation Plant, Coke Oven and Bye Products, Sintering Plant, Blast Furnace, Steel Making Plant, Thermal Power Plant, Billet Mill, etc.

TRAINING

Quality Control of Copper Rod Manufacture - Strohlen Gmbh & Co., Germany

Operation & Maintenance of Rod Mill - Mettalurgie Hoboken – Overpelt, Olen Belgium

Engineer for the Maintenance of Steel Making Plant -Novo Lipetsk Iron & Steel Mills, Former USSR – One year.

PERT/CPM - Pakistan Institute of Management, Karachi

In Plant Training to produce sewing machines - Singer Industries (Pak) Ltd.

Fabrication & erection of Giant Rocla machine for the manufacture of RCC pipes up to diameter 81” - Pakistan Pipes & Construction.

QUALIFICATIONS

B.E. (Mechanical) - 1973

M.I.E., P.E., (Pakistan)

M.AISE (USA)

Address: 1219 Glastonbury way, Bel Air, MD 21014, Email: ac8bx3@r.postjobfree.com

Present contact / status: +1-443-***-**** Green card holder / Permanent Resident of USA